ODOT contract 260495 bid tabulation
COL-SR 9-15.244 (SIGNALIZATION). Let by Ohio DOT on November 12, 2026, COL. 3 bids received; low bid $108,791 by Cornerstone Electric Inc, -21% against the engineer's estimate of $138,000.
- Owner
- Ohio DOT
- Letting
- 12 NOV 2026
- Pay items
- 47
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Cornerstone Electric Inc | $108,791 | Low | -21% |
| 2 | Perram Electric Inc | $133,320 | +23% | -3.0% |
| 3 | Miller Cable Company | $153,125 | +41% | +11% |
Engineer's estimate: $138,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Cornerstone Electric Inc | 2. Perram Electric Inc | 3. Miller Cable Company |
|---|---|---|---|---|---|---|
| 1 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 | $1.00 |
| 2 | Ground mounted support, no. 3 post (630E03100) | FT | 109 | $15.00 | $21.35 | $22.00 |
| 3 | Ground mounted support, no. 4 post (630E04100) | FT | 16.30 | $25.00 | $23.25 | $40.00 |
| 4 | Sign post reflector (630E08600) | EACH | 2 | $60.00 | $112.00 | $53.00 |
| 5 | Sign hanger assembly, mast arm (630E79100) | EACH | 2 | $500.00 | $339.00 | $520.00 |
| 6 | Sign support assembly, pole mounted (630E79500) | EACH | 8 | $175.00 | $199.00 | $260.00 |
| 7 | Sign, flat sheet (630E80100) | SF | 112 | $22.50 | $27.55 | $27.00 |
| 8 | Removal of ground mounted sign and disposal (630E84900) | EACH | 2 | $40.00 | $99.00 | $16.00 |
| 9 | Removal of ground mounted post support and disposal (630E86002) | EACH | 1 | $40.00 | $99.00 | $28.00 |
| 10 | Stop line (644E00500) | FT | 16 | $45.00 | $45.00 | $110.00 |
| 11 | Crosswalk line, 12" (644E00620) | FT | 10 | $65.00 | $65.00 | $110.00 |
| 12 | Removal of pavement marking (644E30000) | FT | 173 | $20.00 | $20.00 | $17.00 |
| 13 | Conduit, 2", 725.04 (625E25400) | FT | 6 | $50.00 | $66.00 | $70.00 |
| 14 | Conduit, 3", 725.04 (625E25500) | FT | 15 | $60.00 | $52.50 | $85.00 |
| 15 | Conduit, jacked or drilled, 725.04, 3" (625E25902) | FT | 55 | $75.00 | $169.60 | $105.00 |
| 16 | Trench, 24" deep (625E29002) | FT | 15 | $20.00 | $13.20 | $45.00 |
| 17 | Trench in paved area (625E29400) | FT | 6 | $200.00 | $166.00 | $600.00 |
| 18 | Pull box, 725.06, size 4 (625E30510) | EACH | 2 | $1,000.00 | $1,940.00 | $1,550.00 |
| 19 | Ground rod (625E32000) | EACH | 2 | $200.00 | $328.00 | $500.00 |
| 20 | Underground warning marking tape (625E36010) | FT | 76 | $2.00 | $1.30 | $3.00 |
| 21 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate, as per plan (632E05007) | EACH | 4 | $1,800.00 | $1,344.50 | $2,300.00 |
| 22 | Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731) | EACH | 2 | $800.00 | $510.00 | $1,100.00 |
| 23 | Accessible pedestrian pushbutton (632E20750) | EACH | 2 | $1,200.00 | $1,239.00 | $1,200.00 |
| 24 | Covering of vehicular signal head (632E25000) | EACH | 4 | $20.00 | $20.00 | $50.00 |
| 25 | Covering of pedestrian signal head (632E25010) | EACH | 2 | $20.00 | $10.00 | $40.00 |
| 26 | Signal cable, 3 conductor, no. 14 AWG (632E40300) | FT | 122 | $3.00 | $2.70 | $4.00 |
| 27 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 130 | $3.75 | $3.35 | $4.50 |
| 28 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 100 | $4.25 | $4.45 | $5.00 |
| 29 | Signal support foundation (632E64010) | EACH | 1 | $8,000.00 | $7,320.00 | $8,500.00 |
| 30 | Pedestal foundation (632E64020) | EACH | 1 | $1,200.00 | $1,692.00 | $1,800.00 |
| 31 | Test hole performed (632E64950) | EACH | 2 | $500.00 | $300.00 | $700.00 |
| 32 | Power cable, 3 conductor, no. 6 AWG (632E68300) | FT | 25 | $8.00 | $9.00 | $9.00 |
| 33 | Service cable, 3 conductor, no. 6 AWG (632E69800) | FT | 65 | $8.00 | $8.00 | $10.00 |
| 34 | Power service, as per plan (632E70001) | EACH | 1 | $2,500.00 | $2,888.00 | $3,200.00 |
| 35 | Conduit riser, 2" diameter (632E70400) | EACH | 1 | $500.00 | $996.00 | $875.00 |
| 36 | Signal support, type TC-81.22, design 4 (632E72110) | EACH | 1 | $16,000 | $19,622 | $15,400 |
| 37 | Pedestal, 14.4' tall, transformer base (632E89930) | EACH | 1 | $3,000.00 | $2,167.00 | $2,300.00 |
| 38 | Removal of traffic signal installation (632E90100) | EACH | 1 | $1,500.00 | $4,634.00 | $3,100.00 |
| 39 | Cabinet, type TS-2, as per plan (633E65511) | EACH | 1 | $16,500 | $17,331 | $19,100 |
| 40 | Controller work pad (633E67200) | EACH | 1 | $1,500.00 | $1,194.00 | $1,118.00 |
| 41 | Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001) | EACH | 1 | $8,000.00 | $10,186 | $11,300 |
| 42 | Atc controller, as per plan (809E69123) | EACH | 1 | $5,000.00 | $5,244.00 | $6,850.00 |
| 43 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 24 | $75.00 | $60.00 | $80.00 |
| 44 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $1,563.00 | $2,678.00 | $1,500.00 |
| 45 | Maintaining traffic (614E11000) | LS | 1 | $2,000.00 | $5,944.00 | $12,500 |
| 46 | Construction layout stakes and surveying (623E10000) | LS | 1 | $2,000.00 | $1,200.00 | $5,000.00 |
| 47 | Mobilization (624E10000) | LS | 1 | $1,000.00 | $6,500.00 | $8,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of November 12, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.