ODOT contract 260164 bid tabulation
D12-LG FY2026 (LIGHTING). Let by Ohio DOT on March 26, 2026, District 12. 3 bids received; low bid $1,399,007 by Ruhlin Company, +8.2% against the engineer's estimate of $1,293,000.
- Owner
- Ohio DOT
- Letting
- 26 MAR 2026
- Pay items
- 42
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Ruhlin Company | $1,399,007 | Low | +8.0% |
| 2 | Miller Cable Company | $1,499,832 | +7.0% | +16% |
| 3 | Perram Electric Inc | $2,144,674 | +53% | +66% |
Engineer's estimate: $1,293,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ruhlin Company | 2. Miller Cable Company | 3. Perram Electric Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $6,000.00 | $500.00 | $12,925 |
| 2 | Anchor assembly rebuilt, as per plan (606E27501) | EACH | 1 | $7,475.00 | $4,975.00 | $9,495.00 |
| 3 | Gate, type CLT (607E61200) | EACH | 4 | $2,785.00 | $1,250.00 | $4,155.00 |
| 4 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 | $1.00 |
| 5 | Removal misc.:control center and disconnect (202E98100) | EACH | 11 | $750.00 | $600.00 | $540.00 |
| 6 | Connection, fused pull apart, as per plan (625E00451) | EACH | 174 | $238.00 | $120.00 | $217.00 |
| 7 | Connection, unfused pull apart, as per plan (625E00461) | EACH | 64 | $227.00 | $120.00 | $212.00 |
| 8 | Connection, unfused permanent (625E00480) | EACH | 244 | $215.00 | $120.00 | $178.00 |
| 9 | Light pole, conventional, AT15B40 (625E10490) | EACH | 5 | $4,530.00 | $3,800.00 | $4,220.00 |
| 10 | Light pole, conventional, AT18B35 (625E10490) | EACH | 20 | $5,300.00 | $4,425.00 | $4,945.00 |
| 11 | Light pole, low mast, as per plan, ALM45 (625E10495) | EACH | 36 | $3,350.00 | $3,500.00 | $9,632.00 |
| 12 | Light pole foundation, 24" X 8' deep (625E14100) | EACH | 21 | $2,100.00 | $3,200.00 | $3,127.00 |
| 13 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 95,268 | $4.00 | $5.00 | $5.84 |
| 14 | No. 2 AWG 2400 volt distribution cable (625E23300) | FT | 440 | $6.00 | $5.75 | $6.22 |
| 15 | No. 10 AWG pole and bracket cable (625E23400) | FT | 8,405 | $2.00 | $3.00 | $2.16 |
| 16 | 1-1/2" duct cable with two no. 4 AWG 2400 volt cables (625E24100) | FT | 325 | $25.00 | $11.00 | $15.40 |
| 17 | 1-1/2" duct cable with two no. 2 AWG 2400 volt cables (625E24300) | FT | 205 | $30.00 | $14.00 | $20.05 |
| 18 | 1-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320) | FT | 41 | $35.00 | $15.00 | $26.90 |
| 19 | Conduit cleaned and cables removed (625E25910) | FT | 31,916 | $0.70 | $2.00 | $0.55 |
| 20 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 25 | $684.00 | $525.00 | $795.00 |
| 21 | Luminaire, high mast, solid state (LED), as per plan (625E26263) | EACH | 8 | $1,613.00 | $300.00 | $3,540.00 |
| 22 | Luminaire, low mast, solid state (LED), as per plan (625E26273) | EACH | 37 | $1,195.00 | $950.00 | $3,005.00 |
| 23 | Trench, 24" deep (625E29002) | FT | 571 | $21.00 | $12.00 | $23.60 |
| 24 | Pull box, 725.08, 18" (625E30700) | EACH | 1 | $1,795.00 | $1,200.00 | $1,870.00 |
| 25 | Pull box, 725.08, 24" (625E30706) | EACH | 3 | $1,975.00 | $1,500.00 | $2,330.00 |
| 26 | Pull box removed (625E31510) | EACH | 14 | $500.00 | $300.00 | $135.00 |
| 27 | Ground rod (625E32000) | EACH | 32 | $345.00 | $300.00 | $428.00 |
| 28 | Power service, as per plan (625E34001) | EACH | 9 | $16,500 | $17,500 | $26,270 |
| 29 | Power service, as per plan (625E34001) | EACH | 2 | $4,233.00 | $3,000.00 | $10,030 |
| 30 | Underground warning marking tape (625E36010) | FT | 571 | $3.00 | $3.00 | $2.05 |
| 31 | Special - maintain existing lighting (625E40000) | LS | 1 | $10,000 | $22,000 | $635.00 |
| 32 | Repair integral luminaire lowering mechanism of tower lighting fixture (625E50400) | EACH | 2 | $5,100.00 | $19,400 | $7,040.00 |
| 33 | Light pole removed (625E75400) | EACH | 58 | $355.00 | $400.00 | $538.50 |
| 34 | Light pole foundation removed (625E75500) | EACH | 21 | $380.00 | $650.00 | $808.00 |
| 35 | Luminaire removed (625E75506) | EACH | 72 | $100.00 | $150.00 | $67.30 |
| 36 | Power service removed, as per plan (625E75511) | EACH | 11 | $1,100.00 | $600.00 | $808.00 |
| 37 | Lighting, misc.:test circuits (625E98200) | LS | 1 | $3,000.00 | $18,500 | $4,580.00 |
| 38 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 150 | $120.00 | $75.00 | $152.50 |
| 39 | Signing, misc.: additional signs, ground mounted, (630E97800) | SF | 100 | $50.00 | $52.00 | $63.40 |
| 40 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $6,600.00 | $14,000 | $40,102 |
| 41 | Maintaining traffic (614E11000) | LS | 1 | $83,500 | $94,000 | $160,980 |
| 42 | Mobilization (624E10000) | LS | 1 | $70,000 | $48,000 | $100,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of March 26, 2026. Compiled by Mirage Metrics.