ODOT contract 260164 bid tabulation

D12-LG FY2026 (LIGHTING). Let by Ohio DOT on March 26, 2026, District 12. 3 bids received; low bid $1,399,007 by Ruhlin Company, +8.2% against the engineer's estimate of $1,293,000.

Owner
Ohio DOT
Letting
26 MAR 2026
Pay items
42
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Ruhlin Company$1,399,007Low+8.0%
2Miller Cable Company$1,499,832+7.0%+16%
3Perram Electric Inc$2,144,674+53%+66%
ODOT contract 260164: bids by rank

Engineer's estimate: $1,293,000.

Bid tabulation

LinePay itemUnitQuantity1. Ruhlin Company2. Miller Cable Company3. Perram Electric Inc
1Clearing and grubbing (201E11000)LS1$6,000.00$500.00$12,925
2Anchor assembly rebuilt, as per plan (606E27501)EACH1$7,475.00$4,975.00$9,495.00
3Gate, type CLT (607E61200)EACH4$2,785.00$1,250.00$4,155.00
4Erosion control (832E30000)EACH1,000$1.00$1.00$1.00
5Removal misc.:control center and disconnect (202E98100)EACH11$750.00$600.00$540.00
6Connection, fused pull apart, as per plan (625E00451)EACH174$238.00$120.00$217.00
7Connection, unfused pull apart, as per plan (625E00461)EACH64$227.00$120.00$212.00
8Connection, unfused permanent (625E00480)EACH244$215.00$120.00$178.00
9Light pole, conventional, AT15B40 (625E10490)EACH5$4,530.00$3,800.00$4,220.00
10Light pole, conventional, AT18B35 (625E10490)EACH20$5,300.00$4,425.00$4,945.00
11Light pole, low mast, as per plan, ALM45 (625E10495)EACH36$3,350.00$3,500.00$9,632.00
12Light pole foundation, 24" X 8' deep (625E14100)EACH21$2,100.00$3,200.00$3,127.00
13No. 4 AWG 2400 volt distribution cable (625E23200)FT95,268$4.00$5.00$5.84
14No. 2 AWG 2400 volt distribution cable (625E23300)FT440$6.00$5.75$6.22
15No. 10 AWG pole and bracket cable (625E23400)FT8,405$2.00$3.00$2.16
161-1/2" duct cable with two no. 4 AWG 2400 volt cables (625E24100)FT325$25.00$11.00$15.40
171-1/2" duct cable with two no. 2 AWG 2400 volt cables (625E24300)FT205$30.00$14.00$20.05
181-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320)FT41$35.00$15.00$26.90
19Conduit cleaned and cables removed (625E25910)FT31,916$0.70$2.00$0.55
20Luminaire, conventional, solid state (LED), as per plan (625E26253)EACH25$684.00$525.00$795.00
21Luminaire, high mast, solid state (LED), as per plan (625E26263)EACH8$1,613.00$300.00$3,540.00
22Luminaire, low mast, solid state (LED), as per plan (625E26273)EACH37$1,195.00$950.00$3,005.00
23Trench, 24" deep (625E29002)FT571$21.00$12.00$23.60
24Pull box, 725.08, 18" (625E30700)EACH1$1,795.00$1,200.00$1,870.00
25Pull box, 725.08, 24" (625E30706)EACH3$1,975.00$1,500.00$2,330.00
26Pull box removed (625E31510)EACH14$500.00$300.00$135.00
27Ground rod (625E32000)EACH32$345.00$300.00$428.00
28Power service, as per plan (625E34001)EACH9$16,500$17,500$26,270
29Power service, as per plan (625E34001)EACH2$4,233.00$3,000.00$10,030
30Underground warning marking tape (625E36010)FT571$3.00$3.00$2.05
31Special - maintain existing lighting (625E40000)LS1$10,000$22,000$635.00
32Repair integral luminaire lowering mechanism of tower lighting fixture (625E50400)EACH2$5,100.00$19,400$7,040.00
33Light pole removed (625E75400)EACH58$355.00$400.00$538.50
34Light pole foundation removed (625E75500)EACH21$380.00$650.00$808.00
35Luminaire removed (625E75506)EACH72$100.00$150.00$67.30
36Power service removed, as per plan (625E75511)EACH11$1,100.00$600.00$808.00
37Lighting, misc.:test circuits (625E98200)LS1$3,000.00$18,500$4,580.00
38Law enforcement officer with patrol car for assistance (614E11110)HR150$120.00$75.00$152.50
39Signing, misc.: additional signs, ground mounted, (630E97800)SF100$50.00$52.00$63.40
40Premium for contract performance bond and for payment bond (103E05000)LS1$6,600.00$14,000$40,102
41Maintaining traffic (614E11000)LS1$83,500$94,000$160,980
42Mobilization (624E10000)LS1$70,000$48,000$100,000
ODOT contract 260164: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of March 26, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy