Ruhlin Company: ODOT bid record

Ruhlin Company submitted 189 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 48 of them (25%). When it was not low, its total sat a median +16% above the low bid.

Owner
Ohio DOT
Low bid volume
$136,097,879
Latest bid
12 NOV 2026
Data through
12 NOV 2026
189Bids
48Low bids
25Win rate, percent
+16%Median gap to the low bid when not low, 141 bids

By year

YearBidsLow bidsWin rate
202025416%
202133515%
2022311342%
202317424%
202428829%
202523313%
2026321134%
Ruhlin Company, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
CUY38924%
LAK11327%
FRA11436%
MED800%
LOR8450%
SUM6117%
RIC6233%
District 126233%
MAH6117%
STA4125%
MAD4125%
MOT4125%
Ruhlin Company, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH170170 (100%)$1.00$1.00
Water659E35000MGAL12181 (67%)$1.00$1.00
Guardrail removed202E38000FT10362 (60%)$2.20$2.50
Sealing of concrete surfaces (epoxy-urethane)512E10100SY13058 (45%)$26.50$34.00
Repair seeding and mulching659E14000SY10155 (54%)$1.00$1.25
Field painting structural steel, intermediate coat514E00060SF6853 (78%)$6.00$3.00
Welded stud shear connectors513E20000EACH8748 (55%)$4.45$4.87
Portable changeable message sign, as per plan614E18601SNMT11247 (42%)$850.00$950.00
Guardrail, type MGS606E15050FT9047 (52%)$21.81$22.73
Seeding and mulching659E10000SY9946 (46%)$1.38$2.60
Removal of ground mounted post support and disposal630E86002EACH8346 (55%)$20.00$23.50
Commercial fertilizer659E20000TON12743 (34%)$850.00$850.00
Ruhlin Company, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Ruhlin Company, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
12 NOV 2026260521GUEGUE-IR 70 EB Rest Area TP (PARKING AREAS)7 of 8$7,999,901+8.0%
29 OCT 2026260456COLCOL-EL Riverfront Trail Phase1.1 (SIDEWALK)2 of 2$1,830,844+3.0%
27 AUG 2026260396OTTOTT-SR 269-01.54 Bridge Repair (BRIDGE REPAIR)1 of 3$168,650Low, 12% under the second
13 AUG 2026260332STASTA-SR 241-16.86 (PART 1 AND PART 2) (MINOR RECONSTRUCTION)3 of 4$8,808,728+23%
13 AUG 2026260345CUYCUY-SR 17-13.50 Replace (BRIDGE REPLACEMENT (1 BRIDGE))2 of 4$9,919,437+6.0%
13 AUG 2026260364KNOKNO-SR 13-10.33 (MINOR RECONSTRUCTION)4 of 4$7,651,536+13%
13 AUG 2026260371SUMSUM-SR 21-01.07 (BRIDGE REPAIR)2 of 9$1,999,872+7.0%
30 JUL 2026260327CUYCUY-IR 90-20.45 Barrier (MISCELLANEOUS)1 of 3$12,691,593Low, 3.0% under the second
16 JUL 2026260333TRUTRU-SR 46-00.50 (Sidewalks) (SIDEWALK)4 of 4$659,981+72%
25 JUN 2026260319FRAFRA-VAR DMS & QWS-FY2026 (SIGNALIZATION)1 of 3$2,357,443Low, 2.0% under the second
25 JUN 2026260321MAHMAH-LG FY2027 (LIGHTING)2 of 4$1,383,553+35%
11 JUN 2026260293CUYCUY-DMS & QWS FY2026 (SIGNALIZATION)1 of 3$998,118Low, 24% under the second
28 MAY 2026260271MADMAD-US 42-12.35 (MAJOR WIDENING)2 of 4$12,611,810+3.0%
21 MAY 2026260281RICRIC-US 30-16.42 (BRIDGE REPAIR)1 of 2$1,067,722Low, 37% under the second
07 MAY 2026260235CUYCUY-SR 8-00.52 Pedestrian (SIDEWALK)5 of 6$1,219,305+36%
07 MAY 2026260240HURHUR-CR 11-02.96 (BRIDGE REPLACEMENT (1 BRIDGE))3 of 3$4,537,833+43%
07 MAY 2026260250TUSTUS-Port Washington Sidewalks (SIDEWALK)1 of 3$921,933Low, 8.0% under the second
07 MAY 2026260255CLACLA-/MOT BH FY27 (BRIDGE REPAIR)1 of 3$636,706Low, 47% under the second
07 MAY 2026260258District 12D12-TSG FY2026 (SIGNALIZATION)3 of 3$423,349+25%
07 MAY 2026260259FRAFRA-IR 70-09.72 Damage Repair (BRIDGE REPAIR)2 of 2$425,486+7.0%
23 APR 2026260142MEGMEG-SR 681-03.074 of 4$12,914,862+30%
09 APR 2026260147DELDEL-SR 229-00.45 AND VARIOUS (BRIDGE REPAIR)3 of 3$7,117,835+26%
26 MAR 2026260148FRAFRA-IR 270-32.92 at Easton Way (INTERCHANGE)3 of 3$6,198,478+19%
26 MAR 2026260157STASTA-SR 241-14.58 (SRTS) (SIDEWALK)1 of 5$394,878Low, 14% under the second
26 MAR 2026260164District 12D12-LG FY2026 (LIGHTING)1 of 3$1,399,007Low, 7.0% under the second
Ruhlin Company: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way