Ruhlin Company: ODOT bid record
Ruhlin Company submitted 189 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 48 of them (25%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $136,097,879
- Latest bid
- 12 NOV 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 25 | 4 | 16% |
| 2021 | 33 | 5 | 15% |
| 2022 | 31 | 13 | 42% |
| 2023 | 17 | 4 | 24% |
| 2024 | 28 | 8 | 29% |
| 2025 | 23 | 3 | 13% |
| 2026 | 32 | 11 | 34% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| CUY | 38 | 9 | 24% |
| LAK | 11 | 3 | 27% |
| FRA | 11 | 4 | 36% |
| MED | 8 | 0 | 0% |
| LOR | 8 | 4 | 50% |
| SUM | 6 | 1 | 17% |
| RIC | 6 | 2 | 33% |
| District 12 | 6 | 2 | 33% |
| MAH | 6 | 1 | 17% |
| STA | 4 | 1 | 25% |
| MAD | 4 | 1 | 25% |
| MOT | 4 | 1 | 25% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 170 | 170 (100%) | $1.00 | $1.00 |
| Water | 659E35000 | MGAL | 121 | 81 (67%) | $1.00 | $1.00 |
| Guardrail removed | 202E38000 | FT | 103 | 62 (60%) | $2.20 | $2.50 |
| Sealing of concrete surfaces (epoxy-urethane) | 512E10100 | SY | 130 | 58 (45%) | $26.50 | $34.00 |
| Repair seeding and mulching | 659E14000 | SY | 101 | 55 (54%) | $1.00 | $1.25 |
| Field painting structural steel, intermediate coat | 514E00060 | SF | 68 | 53 (78%) | $6.00 | $3.00 |
| Welded stud shear connectors | 513E20000 | EACH | 87 | 48 (55%) | $4.45 | $4.87 |
| Portable changeable message sign, as per plan | 614E18601 | SNMT | 112 | 47 (42%) | $850.00 | $950.00 |
| Guardrail, type MGS | 606E15050 | FT | 90 | 47 (52%) | $21.81 | $22.73 |
| Seeding and mulching | 659E10000 | SY | 99 | 46 (46%) | $1.38 | $2.60 |
| Removal of ground mounted post support and disposal | 630E86002 | EACH | 83 | 46 (55%) | $20.00 | $23.50 |
| Commercial fertilizer | 659E20000 | TON | 127 | 43 (34%) | $850.00 | $850.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Shelly & Sands Inc | 67 | 47 of 67 |
| Great Lakes Construction Co | 62 | 26 of 62 |
| Complete General Construction Company | 48 | 23 of 48 |
| J D Williamson Construction Co Inc | 40 | 23 of 40 |
| Perram Electric Inc | 32 | 14 of 32 |
| Kokosing Construction Company Inc | 28 | 6 of 28 |
| Miller Cable Company | 28 | 11 of 28 |
| Suburban Maintenance & Construction Inc | 21 | 7 of 21 |
| Beaver Excavating Company | 17 | 3 of 17 |
| Miller Bros Const Inc | 16 | 7 of 16 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | 260521 | GUE | GUE-IR 70 EB Rest Area TP (PARKING AREAS) | 7 of 8 | $7,999,901 | +8.0% |
| 29 OCT 2026 | 260456 | COL | COL-EL Riverfront Trail Phase1.1 (SIDEWALK) | 2 of 2 | $1,830,844 | +3.0% |
| 27 AUG 2026 | 260396 | OTT | OTT-SR 269-01.54 Bridge Repair (BRIDGE REPAIR) | 1 of 3 | $168,650 | Low, 12% under the second |
| 13 AUG 2026 | 260332 | STA | STA-SR 241-16.86 (PART 1 AND PART 2) (MINOR RECONSTRUCTION) | 3 of 4 | $8,808,728 | +23% |
| 13 AUG 2026 | 260345 | CUY | CUY-SR 17-13.50 Replace (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 4 | $9,919,437 | +6.0% |
| 13 AUG 2026 | 260364 | KNO | KNO-SR 13-10.33 (MINOR RECONSTRUCTION) | 4 of 4 | $7,651,536 | +13% |
| 13 AUG 2026 | 260371 | SUM | SUM-SR 21-01.07 (BRIDGE REPAIR) | 2 of 9 | $1,999,872 | +7.0% |
| 30 JUL 2026 | 260327 | CUY | CUY-IR 90-20.45 Barrier (MISCELLANEOUS) | 1 of 3 | $12,691,593 | Low, 3.0% under the second |
| 16 JUL 2026 | 260333 | TRU | TRU-SR 46-00.50 (Sidewalks) (SIDEWALK) | 4 of 4 | $659,981 | +72% |
| 25 JUN 2026 | 260319 | FRA | FRA-VAR DMS & QWS-FY2026 (SIGNALIZATION) | 1 of 3 | $2,357,443 | Low, 2.0% under the second |
| 25 JUN 2026 | 260321 | MAH | MAH-LG FY2027 (LIGHTING) | 2 of 4 | $1,383,553 | +35% |
| 11 JUN 2026 | 260293 | CUY | CUY-DMS & QWS FY2026 (SIGNALIZATION) | 1 of 3 | $998,118 | Low, 24% under the second |
| 28 MAY 2026 | 260271 | MAD | MAD-US 42-12.35 (MAJOR WIDENING) | 2 of 4 | $12,611,810 | +3.0% |
| 21 MAY 2026 | 260281 | RIC | RIC-US 30-16.42 (BRIDGE REPAIR) | 1 of 2 | $1,067,722 | Low, 37% under the second |
| 07 MAY 2026 | 260235 | CUY | CUY-SR 8-00.52 Pedestrian (SIDEWALK) | 5 of 6 | $1,219,305 | +36% |
| 07 MAY 2026 | 260240 | HUR | HUR-CR 11-02.96 (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 3 | $4,537,833 | +43% |
| 07 MAY 2026 | 260250 | TUS | TUS-Port Washington Sidewalks (SIDEWALK) | 1 of 3 | $921,933 | Low, 8.0% under the second |
| 07 MAY 2026 | 260255 | CLA | CLA-/MOT BH FY27 (BRIDGE REPAIR) | 1 of 3 | $636,706 | Low, 47% under the second |
| 07 MAY 2026 | 260258 | District 12 | D12-TSG FY2026 (SIGNALIZATION) | 3 of 3 | $423,349 | +25% |
| 07 MAY 2026 | 260259 | FRA | FRA-IR 70-09.72 Damage Repair (BRIDGE REPAIR) | 2 of 2 | $425,486 | +7.0% |
| 23 APR 2026 | 260142 | MEG | MEG-SR 681-03.07 | 4 of 4 | $12,914,862 | +30% |
| 09 APR 2026 | 260147 | DEL | DEL-SR 229-00.45 AND VARIOUS (BRIDGE REPAIR) | 3 of 3 | $7,117,835 | +26% |
| 26 MAR 2026 | 260148 | FRA | FRA-IR 270-32.92 at Easton Way (INTERCHANGE) | 3 of 3 | $6,198,478 | +19% |
| 26 MAR 2026 | 260157 | STA | STA-SR 241-14.58 (SRTS) (SIDEWALK) | 1 of 5 | $394,878 | Low, 14% under the second |
| 26 MAR 2026 | 260164 | District 12 | D12-LG FY2026 (LIGHTING) | 1 of 3 | $1,399,007 | Low, 7.0% under the second |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.