ODOT contract 260258 bid tabulation
D12-TSG FY2026 (SIGNALIZATION). Let by Ohio DOT on May 7, 2026, District 12. 3 bids received; low bid $339,750 by Perram Electric Inc, +8.9% against the engineer's estimate of $312,000.
- Owner
- Ohio DOT
- Letting
- 07 MAY 2026
- Pay items
- 66
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Perram Electric Inc | $339,750 | Low | +9.0% |
| 2 | S E T Inc | $414,000 | +22% | +33% |
| 3 | Ruhlin Company | $423,349 | +25% | +36% |
Engineer's estimate: $312,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Perram Electric Inc | 2. S E T Inc | 3. Ruhlin Company |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $200.00 | $5,000.00 | $1,500.00 |
| 2 | Ground mounted support, no. 3 post (630E03100) | FT | 405 | $21.15 | $18.00 | $17.80 |
| 3 | Sign post reflector (630E08600) | EACH | 10 | $65.25 | $62.00 | $45.00 |
| 4 | Sign hanger assembly, mast arm (630E79100) | EACH | 6 | $285.00 | $390.00 | $495.00 |
| 5 | Sign attachment assembly, mast arm (630E79200) | EACH | 4 | $105.00 | $630.00 | $975.00 |
| 6 | Sign support assembly, pole mounted (630E79500) | EACH | 1 | $145.00 | $125.00 | $280.00 |
| 7 | Sign, flat sheet (630E80100) | SF | 312 | $27.65 | $22.00 | $20.00 |
| 8 | Sign, overhead extrusheet (630E80224) | SF | 98 | $34.70 | $36.00 | $29.50 |
| 9 | Removal of ground mounted sign and disposal (630E84900) | EACH | 10 | $20.70 | $20.00 | $15.00 |
| 10 | Removal of ground mounted sign and reerection (630E85100) | EACH | 1 | $105.00 | $70.00 | $80.00 |
| 11 | Removal of ground mounted post support and disposal (630E86002) | EACH | 9 | $23.00 | $20.00 | $20.00 |
| 12 | Removal of ground mounted post support and reerection (630E86010) | EACH | 1 | $10.00 | $116.00 | $180.00 |
| 13 | Removal of overhead mounted sign and storage (630E87000) | EACH | 2 | $205.00 | $400.00 | $385.00 |
| 14 | Removal of overhead sign support and storage, type TC-12.30, as per plan (630E88101) | EACH | 1 | $1,655.00 | $3,200.00 | $2,980.00 |
| 15 | Edge line, 6" (646E10010) | MI | 0.08 | $12,500 | $7,500.00 | $39,000 |
| 16 | Channelizing line, 12" (646E10310) | FT | 35 | $3.00 | $5.00 | $18.00 |
| 17 | Stop line (646E10400) | FT | 80 | $15.00 | $16.00 | $39.00 |
| 18 | Transverse/diagonal line (646E10600) | FT | 23 | $12.00 | $16.00 | $39.00 |
| 19 | Chevron marking (646E10620) | FT | 50 | $12.00 | $16.00 | $39.00 |
| 20 | Lane arrow (646E20300) | EACH | 7 | $185.00 | $200.00 | $285.00 |
| 21 | Removal of pavement marking (646E50000) | EACH | 5 | $250.00 | $60.00 | $295.00 |
| 22 | Removal of pavement marking (646E50100) | FT | 118 | $20.00 | $12.00 | $19.00 |
| 23 | Conduit, 4", 725.04 (625E25600) | FT | 218 | $67.40 | $50.00 | $76.00 |
| 24 | Conduit, jacked or drilled, 725.04, 4" (625E25902) | FT | 465 | $80.25 | $90.00 | $110.00 |
| 25 | Trench (625E29000) | FT | 198 | $14.65 | $20.00 | $25.00 |
| 26 | Pull box, 725.08, 18" (625E30700) | EACH | 3 | $1,880.00 | $950.00 | $1,550.00 |
| 27 | Pull box, 725.08, 24" (625E30706) | EACH | 5 | $2,260.00 | $1,100.00 | $1,680.00 |
| 28 | Pull box removed (625E31510) | EACH | 4 | $105.00 | $500.00 | $440.00 |
| 29 | Ground rod (625E32000) | EACH | 6 | $330.00 | $250.00 | $390.00 |
| 30 | Power service, as per plan (625E34001) | EACH | 1 | $2,535.00 | $4,000.00 | $6,250.00 |
| 31 | Underground warning marking tape (625E36010) | FT | 198 | $1.80 | $1.00 | $1.00 |
| 32 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate (632E05006) | EACH | 6 | $1,030.00 | $1,200.00 | $1,485.00 |
| 33 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate, as per plan (632E05007) | EACH | 5 | $1,020.00 | $1,200.00 | $1,485.00 |
| 34 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate, as per plan (632E05007) | EACH | 2 | $995.00 | $1,200.00 | $1,485.00 |
| 35 | Relamp existing signal section with LED lamp unit, as per plan (632E10101) | EACH | 4 | $265.00 | $500.00 | $250.00 |
| 36 | Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731) | EACH | 1 | $550.00 | $800.00 | $988.00 |
| 37 | Covering of vehicular signal head (632E25000) | EACH | 8 | $10.00 | $60.00 | $50.00 |
| 38 | Covering of pedestrian signal head (632E25010) | EACH | 1 | $5.00 | $50.00 | $50.00 |
| 39 | Pedestrian pushbutton (632E26000) | EACH | 1 | $320.00 | $400.00 | $325.00 |
| 40 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 60 | $4.50 | $9.00 | $4.50 |
| 41 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 485 | $3.15 | $3.00 | $5.00 |
| 42 | Signal cable, 9 conductor, no. 14 AWG (632E40900) | FT | 575 | $3.65 | $4.00 | $5.50 |
| 43 | Signal support foundation (632E64010) | EACH | 1 | $6,100.00 | $8,000.00 | $8,550.00 |
| 44 | Signal support foundation, as per plan (632E64011) | EACH | 3 | $6,780.00 | $9,500.00 | $8,850.00 |
| 45 | Pedestal foundation (632E64020) | EACH | 1 | $1,510.00 | $1,200.00 | $1,100.00 |
| 46 | Test hole performed (632E64950) | EACH | 2 | $830.00 | $500.00 | $350.00 |
| 47 | Power cable, 2 conductor, no. 6 AWG (632E68200) | FT | 240 | $5.55 | $8.00 | $10.00 |
| 48 | Conduit riser, 2" diameter (632E70400) | EACH | 1 | $665.00 | $800.00 | $1,250.00 |
| 49 | Signal support, type TC-81.22, design 4 (632E72110) | EACH | 3 | $12,855 | $17,000 | $16,750 |
| 50 | Combination signal support, type TC-81.22, design 4, as per plan (632E79111) | EACH | 1 | $15,600 | $21,000 | $20,750 |
| 51 | Pedestal, 10.7' tall, transformer base (632E89920) | EACH | 1 | $1,960.00 | $2,200.00 | $2,200.00 |
| 52 | Removal of miscellaneous traffic signal item: pede (632E90020) | EACH | 1 | $620.00 | $500.00 | $600.00 |
| 53 | Removal of traffic signal installation (632E90100) | EACH | 1 | $1,760.00 | $3,000.00 | $3,800.00 |
| 54 | Cabinet, type 332 (633E65520) | EACH | 1 | $18,956 | $25,000 | $24,150 |
| 55 | Cabinet foundation (633E67100) | EACH | 1 | $3,470.00 | $2,500.00 | $2,150.00 |
| 56 | Controller work pad (633E67200) | EACH | 1 | $565.00 | $600.00 | $750.00 |
| 57 | Uninterruptible power supply (UPS), 1000 watt (633E75000) | EACH | 1 | $8,880.00 | $11,000 | $10,400 |
| 58 | Advance radar detection, as per plan (809E69001) | EACH | 2 | $9,480.00 | $12,000 | $11,850 |
| 59 | Stop line radar detection, as per plan (809E69101) | EACH | 2 | $9,080.00 | $12,000 | $12,350 |
| 60 | Atc controller, as per plan (809E69123) | EACH | 1 | $7,130.00 | $10,000 | $9,400.00 |
| 61 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 8 | $100.00 | $105.00 | $136.00 |
| 62 | Portable changeable message sign, as per plan (614E18601) | SNMT | 3 | $1,600.00 | $1,200.00 | $850.00 |
| 63 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $5,588.30 | $5,000.00 | $2,055.00 |
| 64 | Maintaining traffic (614E11000) | LS | 1 | $3,000.00 | $32,765 | $11,305 |
| 65 | Construction layout stakes and surveying (623E10000) | LS | 1 | $11,805 | $10,000 | $2,550.00 |
| 66 | Mobilization (624E10000) | LS | 1 | $16,800 | $10,000 | $21,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 7, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.