ODOT letting results, April 23, 2026

29 contracts let by Ohio DOT on April 23, 2026, $75,056,342 in low bids, a median of 3 bidders per contract. On the 28 with an engineer's estimate, the low bid came in under it 16 times; median low bid -3.0% against the estimate.

Owner
Ohio DOT
Contracts
29
Low bids, total
$75,056,342
Data through
12 NOV 2026

Contracts let that day

ContractProjectCountyBidsLow bidderLow bidSecond bidGapAgainst estimateSource
260197ERI-SR 2/SR 4-07.72/08.24 (FOUR LANE RESURFACING)ERI2Erie Blacktop Inc$11,792,927$13,329,269+13%-12%ODOT
260211POR-US 224-00.00 (MAJOR RECONSTRUCTION)POR5Shelly & Sands Inc$10,954,739$12,113,168+11%-27%ODOT
260142MEG-SR 681-03.07MEG4Cast & Baker Corporation$9,939,659$10,025,000+1.0%ODOT
260216VAN-US 224-10.88 (PART 1, PART 2 AND PART 3) (INTERSECTION)VAN2Vernon Nagel Inc$6,451,324$7,206,817+12%+3.0%ODOT
260221FRA-IR 71-17.22 Ramp (INTERCHANGE)FRA2Complete General Construction Company$5,254,158$5,875,999+12%+23%ODOT
260194BEL-Court Campus Improvements (MISCELLANEOUS)BEL1Grae-Con Construction Inc$4,397,713+11%ODOT
260214SAN-US 20-28.02 Resurfacing (FOUR LANE RESURFACING)SAN3Erie Blacktop Inc$4,394,766$4,565,802+4.0%-12%ODOT
260204LOR-US 20/SR 301-16.93/19.54 (FOUR LANE RESURFACING)LOR2Kokosing Construction Company Inc$4,323,655$5,139,531+19%+13%ODOT
268009SUM-SR 261-00.00/VAR (TWO LANE RESURFACING)SUM5Kenmore Construction Co Inc$3,560,027$3,783,497+6.0%-19%ODOT
260198FAI-SR 204-04.30 (INTERSECTION)FAI4Shelly Company$2,144,982$2,161,199+1.0%-3.0%ODOT
260203HUR-AC&Y Trail Phase II (BIKEWAYS)HUR3Mark Haynes Construction Inc$1,583,058$1,911,054+21%-11%ODOT
260206MAR-SR 746-09.05 (BRIDGE REPAIR)MAR3Double Z Construction Company$1,340,165$1,372,124+2.0%+12%ODOT
260213ROS-SR 180-02.11 (CULVERT REPLACEMENT)ROS6Fillmore Construction$1,188,876$1,242,899+5.0%-13%ODOT
260210MOT-Old N. Dayton Trail, Seg 2 (BIKEWAYS)MOT5Brumbaugh Construction Inc$1,083,094$1,097,584+1.0%+10%ODOT
260219D07-PPM FY26 (PAVEMENT MARKING)District 72Oglesby Construction Inc$894,981$1,040,000+16%-26%ODOT
260217CUY-IR 480-16.56 Slide (SLIDE REPAIR)CUY4Eclipse Co LLC$803,461$860,890+7.0%+12%ODOT
260225WAR-Central Greenway SUP Seg D (BIKEWAYS)WAR5Fillmore Construction$697,462$707,952+2.0%-3.0%ODOT
260209MOT-MCD South River Walk (MISCELLANEOUS)MOT2Double Jay Construction Inc$561,768$675,186+20%+3.0%ODOT
264009MOT-/CLA BH FY26 (BRIDGE REPAIR)MOT2BCC Ohio Inc$537,104$964,835+80%-13%ODOT
260218D02-TSG FY2026 (SIGNALIZATION)District 23Perram Electric Inc$459,710$597,133+30%+3.0%ODOT
260224VIN-Tar Hollow Culvert (CULVERT REPLACEMENT)VIN6D G M Inc$399,890$443,526+11%-12%ODOT
260200HAM-Madeira SRTS 2023 (SIDEWALK)HAM2Prus Construction Company$393,935$423,923+8.0%+5.0%ODOT
260205MAH-Sheridan Rd (Poland) (BIKEWAYS)MAH4Eclipse Co LLC$350,000$380,561+9.0%+27%ODOT
260220D10-RPM FY2026 (RAISED PAVEMENT MARKERS)District 102W L Markers Inc$305,340$326,170+7.0%-19%ODOT
264010JEF-Wintersville Sidewalk Improv (SIDEWALK)JEF3Bog Construction Inc$291,808$399,862+37%-8.0%ODOT
260222ROS-Tar Hollow SF PV (SPOT PATCHING / PAVEMENT REPAIR)ROS5Fillmore Construction$278,815$309,250+11%-10%ODOT
260223SCI-Shawnee SF Bridges (BRIDGE REPAIR)SCI3Axis Civil Construction LLC$267,440$293,575+10%-1.0%ODOT
260202HAN-McComb Ped Improvements (BIKEWAYS)HAN2Advanced Excavating & Demolition LLC$206,097$229,009+11%+6.0%ODOT
260196BEL-SR 7-00.94 (CULVERT REPLACEMENT)BEL4Double B Excavating LLC$199,388$219,167+10%-9.0%ODOT
ODOT contracts let on April 23, 2026, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy