ODOT contract 260216 bid tabulation
VAN-US 224-10.88 (PART 1, PART 2 AND PART 3) (INTERSECTION). Let by Ohio DOT on April 23, 2026, VAN. 2 bids received; low bid $6,451,324 by Vernon Nagel Inc, +2.9% against the engineer's estimate of $6,268,000.
- Owner
- Ohio DOT
- Letting
- 23 APR 2026
- Pay items
- 301
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Vernon Nagel Inc | $6,451,324 | Low | +3.0% |
| 2 | Fenson Contracting LLC | $7,206,817 | +12% | +15% |
Engineer's estimate: $6,268,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Vernon Nagel Inc | 2. Fenson Contracting LLC |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $11,200 | $17,000 |
| 2 | Pavement removed (202E23000) | SY | 8,914 | $9.70 | $13.50 |
| 3 | Guardrail removed (202E38000) | FT | 442 | $2.00 | $3.00 |
| 4 | Removal misc.: flag pole (202E98000) | LS | 1 | $550.00 | $500.00 |
| 5 | Excavation (203E10000) | CY | 6,698 | $13.80 | $17.25 |
| 6 | Embankment (203E20000) | CY | 4,327 | $4.05 | $17.25 |
| 7 | Subgrade compaction (204E10000) | SY | 12,237 | $0.75 | $2.15 |
| 8 | Excavation of subgrade (204E13000) | CY | 398 | $17.50 | $24.00 |
| 9 | Granular material, type C (204E30020) | CY | 398 | $60.50 | $50.00 |
| 10 | Proof rolling (204E45000) | HR | 4 | $280.00 | $150.00 |
| 11 | Geotextile fabric (204E50000) | SY | 1,195 | $3.00 | $2.65 |
| 12 | Guardrail, type MGS, as per plan (606E15051) | FT | 50 | $27.20 | $27.20 |
| 13 | Guardrail, type MGS with long posts, as per plan (606E15101) | FT | 275 | $29.40 | $29.40 |
| 14 | Anchor assembly, MGS type E (606E26150) | EACH | 1 | $2,720.00 | $2,720.00 |
| 15 | Fence, type 47 (607E15000) | FT | 149 | $27.00 | $32.00 |
| 16 | Right-of-way monument, type B (623E40520) | EACH | 7 | $1,050.00 | $290.00 |
| 17 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $1,850.00 | $1,885.00 |
| 18 | Post construction survey monument verification and report (623E51000) | LS | 1 | $1,850.00 | $1,885.00 |
| 19 | Special - mailbox removed and reset (690E50350) | EACH | 6 | $265.00 | $250.00 |
| 20 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 9 | $100.00 | $155.00 |
| 21 | Rock channel protection, type C with filter (601E32200) | CY | 1 | $190.00 | $600.00 |
| 22 | Topsoil (659E00300) | CY | 1,386 | $54.00 | $38.00 |
| 23 | Seeding and mulching (659E10000) | SY | 12,487 | $2.30 | $2.65 |
| 24 | Repair seeding and mulching (659E14000) | SY | 624 | $1.10 | $1.10 |
| 25 | Inter-seeding (659E15000) | SY | 624 | $1.00 | $1.00 |
| 26 | Commercial fertilizer (659E20000) | TON | 1.77 | $850.00 | $850.00 |
| 27 | Lime (659E31000) | ACRE | 2.58 | $35.00 | $35.00 |
| 28 | Water (659E35000) | MGAL | 69 | $1.00 | $1.00 |
| 29 | Slope erosion protection (670E00500) | SY | 2,459 | $1.80 | $1.80 |
| 30 | Ditch erosion protection mat, type B (670E00720) | SY | 130 | $1.80 | $1.80 |
| 31 | Storm water pollution prevention plan (832E15000) | LS | 1 | $3,100.00 | $1,000.00 |
| 32 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $2,480.00 | $22,000 |
| 33 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $6,650.00 | $8,000.00 |
| 34 | Erosion control (832E30000) | EACH | 45,000 | $1.00 | $1.00 |
| 35 | Concrete masonry (602E20000) | CY | 0.90 | $5,070.00 | $5,600.00 |
| 36 | 6" shallow pipe underdrains with geotextile fabric (605E11110) | FT | 3,884 | $20.00 | $16.75 |
| 37 | 6" unclassified pipe underdrains with geotextile fabric (605E13410) | FT | 603 | $20.00 | $17.00 |
| 38 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 227 | $30.00 | $41.00 |
| 39 | 12" conduit, type B, as per plan (611E04401) | FT | 161 | $128.00 | $123.00 |
| 40 | 12" conduit, type C (611E04600) | FT | 66 | $104.00 | $98.00 |
| 41 | 12" conduit, type D (611E04900) | FT | 39 | $104.00 | $80.00 |
| 42 | 15" conduit, type C (611E06100) | FT | 33 | $110.00 | $83.00 |
| 43 | Catch basin, no. 3 (611E98150) | EACH | 5 | $4,800.00 | $5,500.00 |
| 44 | Catch basin, no. 6 (611E98370) | EACH | 3 | $3,200.00 | $4,800.00 |
| 45 | Precast reinforced concrete outlet (611E99710) | EACH | 5 | $680.00 | $490.00 |
| 46 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 1,397 | $213.00 | $213.00 |
| 47 | Asphalt concrete base, PG64-22, (449), (driveways) (301E56100) | CY | 18 | $500.00 | $500.00 |
| 48 | Aggregate base (304E20000) | CY | 1,993 | $62.00 | $72.50 |
| 49 | Non-tracking tack coat (407E20000) | GAL | 1,007 | $3.00 | $3.00 |
| 50 | Stabilized crushed aggregate, as per plan (411E10001) | CY | 75 | $110.00 | $82.00 |
| 51 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 347 | $245.00 | $245.00 |
| 52 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 404 | $225.00 | $225.00 |
| 53 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 6 | $750.00 | $750.00 |
| 54 | 6" non-reinforced concrete pavement, class QC 1P (452E10010) | SY | 115 | $125.00 | $93.00 |
| 55 | 8" non-reinforced concrete pavement, class QC 1P, as per plan (452E12011) | SY | 1,683 | $118.00 | $115.00 |
| 56 | Combination curb and gutter, type 2 (609E12000) | FT | 1,348 | $30.00 | $30.00 |
| 57 | Combination curb and gutter, type 2, as per plan (609E12001) | FT | 190 | $33.50 | $33.00 |
| 58 | Curb, type 6, as per plan (609E26001) | FT | 746 | $23.00 | $24.00 |
| 59 | Combination curb and gutter, type 9 (609E31000) | FT | 2,312 | $25.00 | $25.00 |
| 60 | Combination curb and gutter, type 9, as per plan (609E31001) | FT | 790 | $32.00 | $32.00 |
| 61 | Connection, fused pull apart (625E00450) | EACH | 18 | $134.75 | $135.00 |
| 62 | Connection, unfused permanent (625E00480) | EACH | 12 | $129.00 | $129.00 |
| 63 | Light pole, conventional, as per plan (installatio (625E10491) | EACH | 9 | $1,257.50 | $1,260.00 |
| 64 | Light pole foundation, 24" X 8' deep (625E14100) | EACH | 9 | $2,033.75 | $2,035.00 |
| 65 | No. 6 AWG 2400 volt distribution cable (625E23302) | FT | 4,887 | $4.40 | $4.40 |
| 66 | No. 10 AWG pole and bracket cable (625E23400) | FT | 936 | $2.27 | $2.27 |
| 67 | Conduit, 1-1/2", 725.04 (625E25300) | FT | 1,216 | $19.90 | $20.00 |
| 68 | Conduit, 2", 725.04 (625E25400) | FT | 30 | $24.60 | $24.60 |
| 69 | Conduit, jacked or drilled, 725.04, 3" (625E25902) | FT | 246 | $60.90 | $61.00 |
| 70 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 9 | $838.75 | $840.00 |
| 71 | Trench (625E29000) | FT | 1,246 | $11.06 | $11.15 |
| 72 | Pull box, 725.08, 18" (625E30700) | EACH | 6 | $1,026.25 | $1,075.00 |
| 73 | Ground rod (625E32000) | EACH | 9 | $263.75 | $265.00 |
| 74 | Power service, as per plan (625E34001) | EACH | 1 | $6,745.50 | $6,800.00 |
| 75 | Underground warning marking tape (625E36010) | FT | 1,246 | $2.03 | $2.03 |
| 76 | Arc flash calculations and label, cca (625E76000) | EACH | 1 | $3,355.00 | $3,400.00 |
| 77 | RPM (621E00100) | EACH | 144 | $52.50 | $56.00 |
| 78 | Raised pavement marker removed (621E54000) | EACH | 26 | $12.00 | $13.50 |
| 79 | Barrier reflector, type 3 (bidirectional) (626E00112) | EACH | 5 | $14.60 | $14.60 |
| 80 | Ground mounted support, no. 3 post (630E03100) | FT | 528.70 | $15.00 | $15.00 |
| 81 | Ground mounted support, no. 3 post, as per plan (630E03101) | FT | 167 | $17.10 | $17.10 |
| 82 | Sign post reflector (630E08600) | EACH | 27 | $45.00 | $45.00 |
| 83 | Sign, flat sheet (630E80100) | SF | 412.90 | $20.00 | $20.00 |
| 84 | Removal of ground mounted sign and disposal (630E84900) | EACH | 24 | $10.00 | $10.00 |
| 85 | Removal of ground mounted sign and storage, as per plan (630E85001) | EACH | 6 | $195.00 | $195.00 |
| 86 | Removal of ground mounted post support and disposal (630E86002) | EACH | 36 | $20.00 | $20.00 |
| 87 | Edge line, 6" (644E00104) | MI | 1.28 | $6,000.00 | $6,000.00 |
| 88 | Center line (644E00300) | MI | 0.37 | $8,000.00 | $8,000.00 |
| 89 | Transverse/diagonal line (644E00700) | FT | 283 | $9.00 | $9.00 |
| 90 | Dotted line, 12" (644E01520) | FT | 152 | $2.00 | $2.00 |
| 91 | Yield line (644E20800) | FT | 65 | $20.00 | $20.00 |
| 92 | Planting, misc.: 10" gray washed river stone mulch (661E99930) | SY | 309 | $35.00 | $26.60 |
| 93 | Pavement repair (253E02000) | CY | 20 | $450.00 | $450.00 |
| 94 | Non-tracking tack coat (407E20000) | GAL | 20 | $3.00 | $3.00 |
| 95 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 10 | $500.00 | $500.00 |
| 96 | Detour signing (614E12420) | LS | 1 | $8,500.00 | $8,500.00 |
| 97 | Portable changeable message sign, as per plan (614E18601) | SNMT | 20 | $1,000.00 | $1,375.00 |
| 98 | Water (616E10000) | MGAL | 22 | $1.00 | $50.00 |
| 99 | Compacted aggregate (617E10100) | CY | 50 | $95.00 | $250.00 |
| 100 | Clearing and grubbing (201E11000) | LS | 1 | $940.00 | $5,000.00 |
| 101 | Pavement removed (202E23000) | SY | 1,080 | $12.60 | $18.00 |
| 102 | Wearing course removed (202E23500) | SY | 419 | $4.45 | $7.00 |
| 103 | Curb removed (202E32000) | FT | 644 | $5.85 | $6.00 |
| 104 | Pipe removed, 24" and under (202E35100) | FT | 428 | $10.50 | $11.00 |
| 105 | Guardrail removed for reuse (202E38200) | FT | 625 | $2.40 | $2.40 |
| 106 | Bridge terminal assembly removed (202E47000) | EACH | 4 | $14.60 | $75.00 |
| 107 | Catch basin removed (202E58100) | EACH | 7 | $200.00 | $300.00 |
| 108 | Excavation (203E10000) | CY | 219 | $13.80 | $60.00 |
| 109 | Embankment (203E20000) | CY | 23 | $4.05 | $100.00 |
| 110 | Guardrail, type MGS, as per plan (606E15051) | FT | 50 | $27.20 | $27.20 |
| 111 | Guardrail rebuilt, type MGS (606E16050) | FT | 625 | $19.60 | $19.60 |
| 112 | Anchor assembly rebuilt, type E (606E27850) | EACH | 1 | $1,660.00 | $1,660.00 |
| 113 | MGS bridge terminal assembly, type 1, as per plan (606E35003) | EACH | 4 | $2,680.00 | $2,680.00 |
| 114 | Fence rebuilt, type 47, as per plan (607E16001) | FT | 64 | $35.50 | $45.00 |
| 115 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $1,850.00 | $1,305.00 |
| 116 | Post construction survey monument verification and report (623E51000) | LS | 1 | $1,850.00 | $1,305.00 |
| 117 | Rock channel protection, type C with filter (601E32200) | CY | 12 | $190.00 | $250.00 |
| 118 | Rock channel protection, type D with filter (601E32300) | CY | 138 | $140.00 | $100.00 |
| 119 | Topsoil (659E00300) | CY | 67 | $54.00 | $10.00 |
| 120 | Seeding and mulching (659E10000) | SY | 610 | $2.30 | $7.00 |
| 121 | Repair seeding and mulching (659E14000) | SY | 31 | $3.80 | $2.00 |
| 122 | Commercial fertilizer (659E20000) | TON | 0.08 | $850.00 | $1,500.00 |
| 123 | Water (659E35000) | MGAL | 4 | $1.00 | $10.00 |
| 124 | Slope erosion protection (670E00500) | SY | 610 | $1.80 | $3.00 |
| 125 | Erosion control (832E30000) | EACH | 20,000 | $1.00 | $1.00 |
| 126 | Concrete masonry (602E20000) | CY | 2.31 | $4,280.00 | $3,500.00 |
| 127 | 4" unclassified pipe underdrains with geotextile fabric (605E05210) | FT | 195 | $16.00 | $12.00 |
| 128 | 4" base pipe underdrains with geotextile fabric (605E06020) | FT | 164 | $20.00 | $12.00 |
| 129 | Aggregate drains (605E31100) | FT | 40 | $15.00 | $10.00 |
| 130 | 4" conduit, type F (611E00406) | FT | 175 | $20.00 | $15.00 |
| 131 | 12" conduit, type B, as per plan (611E04401) | FT | 88 | $128.00 | $110.00 |
| 132 | 12" conduit, type F (611E05200) | FT | 610 | $104.00 | $80.00 |
| 133 | Catch basin, no. 3A (611E98180) | EACH | 11 | $3,200.00 | $3,500.00 |
| 134 | Pavement planing, asphalt concrete (1 1/2") (254E01000) | SY | 134 | $15.80 | $18.00 |
| 135 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 161 | $290.00 | $290.00 |
| 136 | Aggregate base (304E20000) | CY | 252 | $62.00 | $100.00 |
| 137 | Non-tracking tack coat (407E20000) | GAL | 118 | $3.00 | $3.00 |
| 138 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 81 | $400.00 | $400.00 |
| 139 | Curb, type 4-A (609E24000) | FT | 106 | $20.00 | $22.00 |
| 140 | Curb, type 4-C (609E24510) | FT | 538 | $39.00 | $32.50 |
| 141 | Delineator, post ground mounted (620E00500) | EACH | 1 | $115.00 | $115.00 |
| 142 | RPM (621E00100) | EACH | 5 | $320.00 | $350.00 |
| 143 | Raised pavement marker removed (621E54000) | EACH | 4 | $12.00 | $15.00 |
| 144 | Barrier reflector, type 1 (two-way) (626E00102) | EACH | 8 | $13.00 | $13.00 |
| 145 | Barrier reflector, type 2 (two-way) (626E00110) | EACH | 19 | $14.00 | $14.00 |
| 146 | Removal of ground mounted sign and reerection (630E85100) | EACH | 1 | $65.00 | $65.00 |
| 147 | Edge line, 6", type 1 (642E00104) | MI | 0.23 | $5,000.00 | $5,500.00 |
| 148 | Center line, type 1 (642E00300) | MI | 0.08 | $5,000.00 | $5,500.00 |
| 149 | Portions of structure removed, as per plan (202E11201) | LS | 1 | $156,940 | $230,000 |
| 150 | Approach slab removed (202E22900) | SY | 133 | $45.00 | $45.00 |
| 151 | Wearing course removed (202E23500) | SY | 133 | $10.75 | $7.00 |
| 152 | Unclassified excavation (503E21300) | LS | 1 | $34,600 | $45,000 |
| 153 | Pile driving equipment mobilization (505E11100) | LS | 1 | $10,000 | $35,000 |
| 154 | Steel piles HP12X53, furnished (507E00200) | FT | 1,150 | $56.00 | $65.00 |
| 155 | Steel piles HP12X53, driven (507E00250) | FT | 1,050 | $88.00 | $5.00 |
| 156 | Steel points or shoes (507E93300) | EACH | 20 | $180.00 | $150.00 |
| 157 | Epoxy coated steel reinforcement (509E10000) | LB | 87,401 | $1.63 | $1.45 |
| 158 | No. 4 deformed GFRP reinforcement (509E30020) | FT | 5,214 | $1.80 | $1.40 |
| 159 | Class QC2 concrete with QC/QA, bridge deck (511E34446) | CY | 274 | $1,050.00 | $1,250.00 |
| 160 | Class QC2 concrete with QC/QA, bridge deck (parapet) (511E34450) | CY | 51 | $765.00 | $1,100.00 |
| 161 | Class QC1 concrete, abutment including footing (511E43510) | CY | 103 | $705.00 | $850.00 |
| 162 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 420 | $36.00 | $30.00 |
| 163 | Welded stud shear connectors (513E20000) | EACH | 3,636 | $4.00 | $4.45 |
| 164 | Surface preparation of existing structural steel (514E00050) | SF | 11,587 | $7.00 | $7.00 |
| 165 | Field painting of existing structural steel, prime coat (514E00056) | SF | 11,241 | $4.00 | $4.00 |
| 166 | Field painting structural steel, intermediate coat (514E00060) | SF | 11,241 | $4.00 | $4.00 |
| 167 | Field painting structural steel, finish coat (514E00066) | SF | 11,241 | $3.00 | $3.00 |
| 168 | Grinding fins, tears, slivers on existing structural steel (514E00504) | MNHR | 10 | $150.00 | $150.00 |
| 169 | Final inspection repair (514E10000) | EACH | 11 | $500.00 | $500.00 |
| 170 | 1/2" preformed expansion joint filler (516E13200) | SF | 86 | $12.47 | $7.00 |
| 171 | 1" preformed expansion joint filler (516E13600) | SF | 94 | $13.16 | $8.00 |
| 172 | 2" preformed expansion joint filler (516E13900) | SF | 61 | $9.00 | $12.00 |
| 173 | Integral abutment expansion joint seal (516E14014) | FT | 120 | $46.00 | $45.00 |
| 174 | 2" deep joint sealer (516E31010) | FT | 96 | $23.60 | $20.00 |
| 175 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44101) | EACH | 6 | $1,700.00 | $1,250.00 |
| 176 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44101) | EACH | 6 | $2,400.00 | $1,750.00 |
| 177 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44201) | EACH | 12 | $2,740.00 | $1,750.00 |
| 178 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $50,690 | $85,000 |
| 179 | Porous backfill with geotextile fabric (518E21200) | CY | 92 | $92.50 | $120.00 |
| 180 | 6" perforated corrugated plastic pipe (518E40000) | FT | 136 | $16.00 | $12.00 |
| 181 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 60 | $16.00 | $15.00 |
| 182 | Reinforced concrete approach slabs with QC/QA (T=1 (526E25011) | SY | 244 | $365.00 | $410.00 |
| 183 | Type C installation, as per plan (526E90031) | FT | 96 | $360.00 | $350.00 |
| 184 | Water (616E10000) | MGAL | 3 | $1.00 | $10.00 |
| 185 | Clearing and grubbing (201E11000) | LS | 1 | $860.00 | $5,800.00 |
| 186 | Pavement removed (202E23000) | SY | 4,706 | $12.60 | $27.00 |
| 187 | Pipe removed, 24" and under (202E35100) | FT | 195 | $35.00 | $51.00 |
| 188 | Catch basin removed (202E58100) | EACH | 3 | $200.00 | $750.00 |
| 189 | Special - fill and plug existing conduit (202E70000) | FT | 91 | $20.50 | $60.00 |
| 190 | Excavation (203E10000) | CY | 2,472 | $13.80 | $25.00 |
| 191 | Embankment (203E20000) | CY | 4,254 | $4.05 | $26.00 |
| 192 | Subgrade compaction (204E10000) | SY | 10,498 | $0.75 | $2.00 |
| 193 | Excavation of subgrade (204E13000) | CY | 1,097 | $17.50 | $30.00 |
| 194 | Granular material, type C (204E30020) | CY | 1,097 | $60.50 | $65.00 |
| 195 | Proof rolling (204E45000) | HR | 5 | $280.00 | $150.00 |
| 196 | Geotextile fabric (204E50000) | SY | 4,222 | $3.00 | $2.90 |
| 197 | Full depth pavement sawing (252E01500) | FT | 3,359 | $1.75 | $6.50 |
| 198 | Guardrail, type MGS, as per plan (606E15051) | FT | 538 | $26.00 | $26.00 |
| 199 | Anchor assembly, MGS type E (606E26150) | EACH | 2 | $2,720.00 | $2,720.00 |
| 200 | Right-of-way monument, type B (623E40520) | EACH | 1 | $1,050.00 | $290.00 |
| 201 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $1,850.00 | $1,305.00 |
| 202 | Post construction survey monument verification and report (623E51000) | LS | 1 | $1,850.00 | $1,305.00 |
| 203 | Commercial fertilizer (654E11000) | TON | 1.58 | $850.00 | $850.00 |
| 204 | Topsoil (659E00300) | CY | 1,466 | $54.00 | $38.00 |
| 205 | Seeding and mulching, class 1 (659E00500) | SY | 11,320 | $2.30 | $2.30 |
| 206 | Repair seeding and mulching (659E14000) | SY | 556 | $1.10 | $1.10 |
| 207 | Inter-seeding (659E15000) | SY | 556 | $1.00 | $1.00 |
| 208 | Lime (659E31000) | ACRE | 2.34 | $35.00 | $35.00 |
| 209 | Water (659E35000) | MGAL | 63 | $1.00 | $1.00 |
| 210 | Ditch erosion protection mat, type B (670E00720) | SY | 926 | $1.80 | $1.80 |
| 211 | Storm water pollution prevention plan (832E15000) | LS | 1 | $2,300.00 | $1,000.00 |
| 212 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $2,480.00 | $10,500 |
| 213 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $6,650.00 | $8,000.00 |
| 214 | Erosion control (832E30000) | EACH | 37,990 | $1.00 | $1.00 |
| 215 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 27.80 | $100.00 | $152.00 |
| 216 | Rock channel protection, type C with filter (601E32200) | CY | 4 | $190.00 | $350.00 |
| 217 | Concrete masonry (602E20000) | CY | 2 | $2,580.00 | $2,700.00 |
| 218 | 6" unclassified pipe underdrains with geotextile fabric (605E13410) | FT | 1,135 | $16.00 | $20.00 |
| 219 | 6" base pipe underdrains with geotextile fabric (605E14020) | FT | 4,152 | $16.00 | $19.00 |
| 220 | Aggregate drains (605E31100) | FT | 250 | $15.00 | $17.50 |
| 221 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 134 | $30.00 | $40.00 |
| 222 | 6" conduit, type B (611E00900) | FT | 50 | $34.00 | $35.00 |
| 223 | 6" conduit, type E (611E01400) | FT | 100 | $30.00 | $26.00 |
| 224 | 6" conduit, type F (611E01500) | FT | 260 | $30.00 | $35.00 |
| 225 | 15" conduit, type B, as per plan (611E05901) | FT | 88 | $134.00 | $180.00 |
| 226 | 15" conduit, type C (611E06100) | FT | 5 | $110.00 | $300.00 |
| 227 | 18" conduit, type B, as per plan (611E07401) | FT | 181 | $140.00 | $195.00 |
| 228 | 18" conduit, type C (611E07600) | FT | 94 | $116.00 | $105.00 |
| 229 | 21" conduit, type B (611E08900) | FT | 103 | $210.00 | $150.00 |
| 230 | 24" conduit, type A, as per plan (611E10201) | FT | 90 | $180.00 | $260.00 |
| 231 | Conduit, bored or jacked, 18" (611E96600) | FT | 79 | $685.00 | $600.00 |
| 232 | Conduit, bored or jacked, 21" (611E96600) | FT | 103 | $685.00 | $605.00 |
| 233 | Catch basin, no. 2-2B (611E98470) | EACH | 4 | $2,600.00 | $3,700.00 |
| 234 | Manhole, no. 3 (611E99574) | EACH | 1 | $5,249.62 | $5,500.00 |
| 235 | Precast reinforced concrete outlet (611E99710) | EACH | 15 | $680.00 | $490.00 |
| 236 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 2,062 | $219.00 | $219.00 |
| 237 | Aggregate base (304E20000) | CY | 1,900 | $62.00 | $74.00 |
| 238 | Non-tracking tack coat (407E20000) | GAL | 1,106 | $3.00 | $3.00 |
| 239 | Asphalt concrete surface course, 12.5 MM, type B (449) (442E22150) | CY | 381 | $300.00 | $300.00 |
| 240 | Asphalt concrete intermediate course, 12.5 MM, type B (449) (442E22350) | CY | 445 | $270.00 | $270.00 |
| 241 | Connection, fused pull apart (625E00450) | EACH | 12 | $164.75 | $165.00 |
| 242 | Connection, unfused pull apart (625E00460) | EACH | 12 | $164.75 | $165.00 |
| 243 | Connection, unfused permanent (625E00480) | EACH | 24 | $159.00 | $159.00 |
| 244 | Light pole (installation only), as per plan (625E10503) | EACH | 6 | $1,315.00 | $1,315.00 |
| 245 | Light pole foundation, 24" X 8' deep (625E14100) | EACH | 6 | $2,033.75 | $2,040.00 |
| 246 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 423 | $6.45 | $6.50 |
| 247 | No. 10 AWG pole and bracket cable (625E23400) | FT | 240 | $2.27 | $2.30 |
| 248 | 1-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320) | FT | 1,974 | $16.60 | $16.60 |
| 249 | Conduit, 3", 725.052 (625E25506) | FT | 18 | $13.05 | $13.15 |
| 250 | Conduit, jacked or drilled, 3", 725.052 (625E25900) | FT | 365 | $60.90 | $61.00 |
| 251 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 6 | $542.05 | $545.00 |
| 252 | Trench, 24" deep (625E29002) | FT | 1,842 | $11.06 | $11.10 |
| 253 | Pull box, 725.08, 18" (625E30700) | EACH | 12 | $1,026.25 | $1,100.00 |
| 254 | Ground rod (625E32000) | EACH | 7 | $263.75 | $265.00 |
| 255 | Power service (625E34000) | EACH | 1 | $6,596.00 | $6,600.00 |
| 256 | Control center cabinet, complete (625E34450) | EACH | 1 | $9,360.00 | $9,400.00 |
| 257 | Underground warning marking tape (625E36010) | FT | 1,842 | $2.03 | $2.05 |
| 258 | RPM (621E00100) | EACH | 136 | $52.50 | $55.00 |
| 259 | Ground mounted support, no. 2 post (630E02100) | FT | 140.50 | $15.60 | $15.60 |
| 260 | Ground mounted support, no. 3 post (630E03100) | FT | 202 | $16.50 | $16.50 |
| 261 | Ground mounted structural beam support, S4X7.7 (630E06400) | FT | 262 | $39.00 | $39.00 |
| 262 | Ground mounted structural beam support, W8X18 (630E07000) | FT | 58 | $60.00 | $60.00 |
| 263 | Ground mounted structural beam support, W10X12 (630E07600) | FT | 48 | $49.00 | $49.00 |
| 264 | Sign post reflector (630E08600) | EACH | 13 | $45.00 | $45.00 |
| 265 | Breakaway structural beam connection (630E09000) | EACH | 28 | $520.00 | $520.00 |
| 266 | Sign, flat sheet (630E80100) | SF | 428.80 | $20.00 | $20.00 |
| 267 | Sign, ground mounted extrusheet (630E80200) | SF | 620 | $25.00 | $25.00 |
| 268 | Ground mounted structural beam support foundation (630E84500) | EACH | 28 | $870.00 | $870.00 |
| 269 | Removal of ground mounted sign and disposal (630E84900) | EACH | 41 | $10.00 | $10.00 |
| 270 | Removal of ground mounted sign and reerection (630E85100) | EACH | 9 | $55.00 | $55.00 |
| 271 | Edge line, 6" (644E00104) | MI | 0.78 | $6,000.00 | $6,000.00 |
| 272 | Edge line, 6" (644E00104) | MI | 0.78 | $6,000.00 | $6,000.00 |
| 273 | Lane line, 6" (644E00204) | MI | 0.18 | $5,000.00 | $5,000.00 |
| 274 | Center line (644E00300) | MI | 0.04 | $8,000.00 | $8,000.00 |
| 275 | Channelizing line, 12" (644E00404) | FT | 2,243 | $3.00 | $3.00 |
| 276 | Stop line (644E00500) | FT | 61 | $9.00 | $9.00 |
| 277 | Transverse/diagonal line (644E00700) | FT | 692 | $9.00 | $9.00 |
| 278 | Chevron marking (644E00720) | FT | 313 | $9.00 | $9.00 |
| 279 | Lane arrow (644E01300) | EACH | 33 | $200.00 | $200.00 |
| 280 | Wrong way arrow (644E01360) | EACH | 8 | $200.00 | $200.00 |
| 281 | Dotted line, 6" (644E01510) | FT | 275 | $1.00 | $1.00 |
| 282 | Yield line (644E20800) | FT | 34 | $34.00 | $20.00 |
| 283 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 80 | $85.00 | $125.00 |
| 284 | Increased barrier delineation (614E11630) | FT | 8,274 | $0.50 | $1.25 |
| 285 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 4 | $1,500.00 | $2,400.00 |
| 286 | Work zone raised pavement marker, as per plan (614E12801) | EACH | 186 | $7.00 | $8.25 |
| 287 | Barrier reflector, type 1, one way (614E13310) | EACH | 170 | $7.00 | $10.00 |
| 288 | Object marker, one way (614E13350) | EACH | 166 | $18.00 | $20.00 |
| 289 | Portable changeable message sign, as per plan (614E18601) | SNMT | 6 | $1,000.00 | $1,380.00 |
| 290 | Work zone edge line, class I, 6" (614E22010) | MI | 4.41 | $1,000.00 | $1,250.00 |
| 291 | Work zone dotted line, class I (614E24000) | FT | 2,447 | $1.00 | $1.00 |
| 292 | Water (616E10000) | MGAL | 0.06 | $2,000.00 | $50.00 |
| 293 | Portable barrier, unanchored (622E41100) | FT | 8,274 | $39.00 | $21.00 |
| 294 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 12 | $850.00 | $1,230.00 |
| 295 | Premium on railroads' protective public liability and property damage liability insurance (100E00300) | LS | 1 | $12,350 | $7,500.00 |
| 296 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $38,305 | $55,000 |
| 297 | Maintaining traffic (614E11000) | LS | 1 | $147,500 | $401,500 |
| 299 | Construction layout stakes and surveying (623E10000) | LS | 1 | $76,800 | $65,000 |
| 300 | Mobilization (624E10000) | LS | 1 | $262,899 | $320,000 |
| 301 | Field painting, misc.:coating of beam ends (514E27700) | SF | 346 | $186.00 | $186.00 |
| 302 | Subgrade compaction (204E10000) | SY | 1,334 | $0.75 | $6.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of April 23, 2026. Compiled by Mirage Metrics.