Fenson Contracting LLC: ODOT bid record

Fenson Contracting LLC submitted 23 bids on Ohio DOT contracts in the data, from 13 APR 2023 to 01 OCT 2026, and was the low bidder on 6 of them (26%). When it was not low, its total sat a median +28% above the low bid.

Owner
Ohio DOT
Low bid volume
$7,653,587
Latest bid
01 OCT 2026
Data through
12 NOV 2026
23Bids
6Low bids
26Win rate, percent
+28%Median gap to the low bid when not low, 17 bids

By year

YearBidsLow bidsWin rate
202311100%
20246117%
2025500%
202611436%
Fenson Contracting LLC, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
ALL6350%
PUT3267%
WYA200%
AUG200%
PAU200%
District 711100%
MIA100%
WOO100%
WIL100%
HAN100%
VAN100%
HAR100%
Fenson Contracting LLC, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH2424 (100%)$1.00$1.00
Water659E35000MGAL2317 (74%)$1.00$1.00
Repair seeding and mulching659E14000SY1710 (59%)$1.20$1.25
Non-tracking tack coat407E20000GAL218 (38%)$3.00$3.25
Commercial fertilizer659E20000TON208 (40%)$850.00$850.00
Lime659E31000ACRE138 (62%)$35.00$150.00
Ground mounted support, no. 3 post630E03100FT138 (62%)$16.50$15.20
Proof rolling204E45000HR108 (80%)$150.00$219.05
Embankment203E20000CY217 (33%)$21.55$25.00
Asphalt concrete base, PG64-22, (449)301E56000CY177 (41%)$235.00$300.00
Inter-seeding659E15000SY107 (70%)$1.00$1.00
Pavement removed202E23000SY215 (24%)$14.00$17.00
Fenson Contracting LLC, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Fenson Contracting LLC, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
01 OCT 2026260433PUTPUT-SR 115-05.23 AND VARIOUS (CULVERT REPLACEMENT)1 of 6$2,035,569Low, 6.0% under the second
30 JUL 2026260341ALLALL-Delphos S. Main St. Trail (SIDEWALK)1 of 5$466,218Low, 0.0% under the second
11 JUN 2026260286FULFUL-US 20-15.07 Culvert Repl (CULVERT REPLACEMENT)2 of 3$491,900+4.0%
07 MAY 2026260226ALLALL-SR 117-10.78 (INTERSECTION)1 of 3$2,424,191Low, 5.0% under the second
07 MAY 2026260239HARHAR-US 68/SR 31 Roundabout (INTERSECTION)3 of 3$4,934,520+37%
23 APR 2026260202HANHAN-McComb Ped Improvements (BIKEWAYS)2 of 2$229,009+11%
23 APR 2026260216VANVAN-US 224-10.88 (PART 1, PART 2 AND PART 3) (INTERSECTION)2 of 2$7,206,817+12%
09 APR 2026260187WYAWYA-Carey SRTS Phase 2 (SIDEWALK)4 of 6$344,718+32%
09 APR 2026264008PUTPUT-SR 190-05.71 (CULVERT REPLACEMENT)1 of 3$598,999Low, 40% under the second
26 MAR 2026260143AUGAUG-SR 501/SR 198-02.32/02.36 (INTERSECTION)2 of 2$2,166,924+28%
26 MAR 2026260166ALLALL-Lafayette Improvements (TWO LANE RESURFACING)2 of 2$1,581,469+33%
26 JUN 2025250324PUTPUT-Ottawa Ped. Improvements (SPOT SAFETY)2 of 4$281,751+52%
08 MAY 2025250258PAUPAU-SR 637-12.27 (SLIDE REPAIR)3 of 6$827,612+12%
08 MAY 2025254016PAUPAU-SR 111-01.65 (CULVERT REPLACEMENT)3 of 3$349,564+10%
24 APR 2025250209ALLALL-Harrod Improvements (MINOR RECONSTRUCTION)2 of 6$2,027,885+32%
13 FEB 2025254006ALLALL-SR 117-03.47/04.64 (CULVERT REPLACEMENT)3 of 4$918,215+5.0%
19 DEC 2024240591AUGAUG-SR 274-04.31 (CULVERT REPLACEMENT)4 of 6$273,268+57%
14 NOV 2024244025WILWIL-US 6-11.07 Bridge Repl. (CULVERT REPLACEMENT)2 of 5$687,7640.0%
25 JUL 2024240382WYAWYA-US 23-06.63 (INTERSECTION)5 of 6$384,988+37%
18 APR 2024244009District 7D07-CR-FY24 (CULVERT REPLACEMENT)1 of 1$1,707,790Low
18 APR 2024244010MIAMIA-/MER-IR 75/SR 119-16.91/13.74 (CULVERT REPLACEMENT)3 of 3$722,461+57%
18 APR 2024244011WOOWOO-SR 582-16.35 Bridge Repl. (CULVERT REPLACEMENT)3 of 4$348,532+7.0%
13 APR 2023238000ALLALL-SRTS Delphos (SIDEWALK)1 of 2$420,820Low, 17% under the second
Fenson Contracting LLC: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way