ODOT contract 260226 bid tabulation
ALL-SR 117-10.78 (INTERSECTION). Let by Ohio DOT on May 7, 2026, ALL. 3 bids received; low bid $2,424,191 by Fenson Contracting LLC, -3.8% against the engineer's estimate of $2,521,000.
- Owner
- Ohio DOT
- Letting
- 07 MAY 2026
- Pay items
- 120
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Fenson Contracting LLC | $2,424,191 | Low | -4.0% |
| 2 | Helms and Sons Excavating | $2,534,904 | +5.0% | +1.0% |
| 3 | Vernon Nagel Inc | $2,877,284 | +19% | +14% |
Engineer's estimate: $2,521,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Fenson Contracting LLC | 2. Helms and Sons Excavating | 3. Vernon Nagel Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $9,500.00 | $85,000 | $10,000 |
| 2 | Pavement removed (202E23000) | SY | 7,357 | $14.00 | $9.00 | $20.00 |
| 3 | Pipe removed, 24" and under (202E35100) | FT | 492 | $30.00 | $50.00 | $65.00 |
| 4 | Pipe removed, over 24" diameter (202E35200) | FT | 15 | $50.00 | $190.00 | $90.00 |
| 5 | Catch basin removed (202E58100) | EACH | 5 | $670.00 | $600.00 | $500.00 |
| 6 | Monument assembly removed (202E60010) | EACH | 10 | $350.00 | $250.00 | $200.00 |
| 7 | Excavation (203E10000) | CY | 1,694 | $15.00 | $12.00 | $30.00 |
| 8 | Embankment (203E20000) | CY | 2,768 | $25.00 | $15.00 | $30.00 |
| 9 | Subgrade compaction (204E10000) | SY | 9,554 | $1.50 | $2.00 | $1.00 |
| 10 | Excavation of subgrade (204E13000) | CY | 623 | $11.75 | $27.00 | $30.00 |
| 11 | Granular material, type B (204E30010) | CY | 623 | $50.00 | $56.00 | $100.00 |
| 12 | Proof rolling (204E45000) | HR | 5 | $125.00 | $150.00 | $250.00 |
| 13 | Geogrid (204E51000) | SY | 1,867 | $5.88 | $4.00 | $3.50 |
| 14 | Monument assembly, type D (623E38550) | EACH | 6 | $1,500.00 | $2,500.00 | $2,000.00 |
| 15 | Monument assembly adjusted to grade (623E39500) | EACH | 1 | $1,000.00 | $550.00 | $1,000.00 |
| 16 | Right-of-way monument, type B (623E40520) | EACH | 1 | $400.00 | $1,250.00 | $1,000.00 |
| 17 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $3,200.00 | $8,500.00 | $3,500.00 |
| 18 | Post construction survey monument verification and report (623E51000) | LS | 1 | $3,200.00 | $8,500.00 | $2,500.00 |
| 19 | Special - mailbox support (690E50000) | EACH | 2 | $300.00 | $300.00 | $500.00 |
| 20 | Special - mailbox removed and reset (690E50350) | EACH | 2 | $300.00 | $300.00 | $250.00 |
| 21 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 3.56 | $210.00 | $2,200.00 | $350.00 |
| 22 | Topsoil (659E00300) | CY | 1,030 | $40.00 | $13.00 | $75.00 |
| 23 | Seeding and mulching (659E10000) | SY | 7,375 | $2.75 | $1.50 | $1.05 |
| 24 | Repair seeding and mulching (659E14000) | SY | 369 | $1.30 | $2.00 | $1.00 |
| 25 | Inter-seeding (659E15000) | SY | 369 | $1.00 | $2.00 | $0.80 |
| 26 | Commercial fertilizer (659E20000) | TON | 1.03 | $900.00 | $950.00 | $800.00 |
| 27 | Lime (659E31000) | ACRE | 1.52 | $35.00 | $120.00 | $1.00 |
| 28 | Water (659E35000) | MGAL | 41 | $1.00 | $1.00 | $1.00 |
| 29 | Slope erosion protection (670E00500) | SY | 1,894 | $2.00 | $3.00 | $1.85 |
| 30 | Storm water pollution prevention plan (832E15000) | LS | 1 | $2,500.00 | $2,500.00 | $3,900.00 |
| 31 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $17,500 | $11,000 | $2,500.00 |
| 32 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $17,000 | $17,000 | $8,500.00 |
| 33 | Erosion control (832E30000) | EACH | 60,000 | $1.00 | $1.00 | $1.00 |
| 34 | Concrete masonry (602E20000) | CY | 0.30 | $5,000.00 | $3,200.00 | $3,000.00 |
| 35 | 6" unclassified pipe underdrains with geotextile fabric (605E13410) | FT | 91 | $16.00 | $25.00 | $15.00 |
| 36 | 6" base pipe underdrains with geotextile fabric (605E14020) | FT | 2,978 | $16.00 | $12.00 | $22.00 |
| 37 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 260 | $38.00 | $44.00 | $20.00 |
| 38 | 6" conduit, type B, as per plan (611E00901) | FT | 55 | $35.00 | $96.00 | $22.00 |
| 39 | 6" conduit, type C (611E01100) | FT | 20 | $25.00 | $64.00 | $30.00 |
| 40 | 6" conduit, type E (611E01400) | FT | 50 | $25.00 | $80.00 | $20.00 |
| 41 | 6" conduit, type F (611E01500) | FT | 50 | $25.00 | $80.00 | $20.00 |
| 42 | 12" conduit, type B, as per plan (611E04401) | FT | 602 | $85.00 | $98.00 | $170.00 |
| 43 | 12" conduit, type C (611E04600) | FT | 437 | $60.00 | $84.00 | $125.00 |
| 44 | 15" conduit, type B, as per plan (611E05901) | FT | 135 | $135.00 | $133.00 | $155.00 |
| 45 | 15" conduit, type C (611E06100) | FT | 15 | $140.00 | $124.00 | $130.00 |
| 46 | 24" conduit, type B, as per plan (611E10401) | FT | 5 | $250.00 | $485.00 | $400.00 |
| 47 | 24" conduit, type C (611E10600) | FT | 336 | $85.00 | $119.00 | $140.00 |
| 48 | 27" conduit, type B, as per plan (611E11901) | FT | 76 | $225.00 | $176.00 | $350.00 |
| 49 | 36" conduit, type B, as per plan (611E16401) | FT | 15 | $225.00 | $448.00 | $500.00 |
| 50 | Catch basin, no. 3 (611E98150) | EACH | 6 | $5,500.00 | $5,000.00 | $6,500.00 |
| 51 | Catch basin, no. 3A (611E98180) | EACH | 7 | $4,700.00 | $3,750.00 | $6,000.00 |
| 52 | Catch basin, no. 6 (611E98370) | EACH | 2 | $4,900.00 | $3,600.00 | $5,200.00 |
| 53 | Catch basin, no. 2-2B (611E98470) | EACH | 3 | $3,300.00 | $3,350.00 | $4,500.00 |
| 54 | Catch basin, no. 2-3 (611E98510) | EACH | 3 | $3,500.00 | $3,800.00 | $5,000.00 |
| 55 | Manhole, no. 3 (611E99574) | EACH | 2 | $6,800.00 | $4,750.00 | $8,500.00 |
| 56 | Manhole, no. 3 (611E99574) | EACH | 2 | $14,000 | $6,650.00 | $9,000.00 |
| 57 | Precast reinforced concrete outlet (611E99710) | EACH | 2 | $300.00 | $1,300.00 | $1,247.41 |
| 58 | Pavement planing, asphalt concrete, 1 1/4" (254E01000) | SY | 818 | $3.70 | $7.00 | $4.00 |
| 59 | Pavement planing, asphalt concrete, 3" (254E01000) | SY | 804 | $3.70 | $7.00 | $4.00 |
| 60 | Pavement planing, asphalt concrete, varies 0" to 3 (254E01000) | SY | 1,442 | $3.70 | $5.00 | $4.73 |
| 61 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 1,481 | $208.00 | $225.00 | $205.00 |
| 62 | Aggregate base (304E20000) | CY | 1,771 | $60.00 | $55.00 | $100.00 |
| 63 | Non-tracking tack coat (407E20000) | GAL | 1,359 | $3.00 | $3.00 | $3.00 |
| 64 | Asphalt concrete surface course, type 1, (448), PG70-22M (441E50100) | CY | 311 | $253.00 | $265.00 | $265.00 |
| 65 | Asphalt concrete intermediate course, type 2, (448) (441E50300) | CY | 395 | $222.00 | $245.00 | $230.00 |
| 66 | 6" non-reinforced concrete pavement, class QC MS (452E10050) | SY | 42 | $105.00 | $115.00 | $135.00 |
| 67 | Non-reinforced concrete pavement, misc.:9? concret (452E19200) | SY | 1,518 | $150.00 | $148.00 | $135.00 |
| 68 | Combination curb and gutter, type 2 (609E12000) | FT | 1,446 | $34.00 | $44.00 | $33.00 |
| 69 | Combination curb and gutter, type 2, as per plan (609E12001) | FT | 244 | $33.00 | $44.00 | $36.00 |
| 70 | Curb, type 6 (609E26000) | FT | 523 | $25.00 | $30.00 | $24.00 |
| 71 | Combination curb and gutter, type 9 (609E31000) | FT | 2,821 | $28.00 | $38.00 | $27.00 |
| 72 | Combination curb and gutter, type 9, as per plan (609E31001) | FT | 552 | $39.00 | $45.00 | $34.00 |
| 73 | Curb, misc.: combination curb and gutter, type 2, (609E98000) | FT | 264 | $35.00 | $44.00 | $33.00 |
| 74 | Compacted aggregate (617E10100) | CY | 17 | $75.00 | $80.00 | $150.00 |
| 75 | Rumble stripes, edge line (asphalt concrete) (618E40800) | FT | 1,466 | $12.00 | $5.00 | $4.50 |
| 76 | Connection, fused pull apart (625E00450) | EACH | 28 | $200.00 | $204.00 | $175.00 |
| 77 | Connection, unfused permanent (625E00480) | EACH | 39 | $185.00 | $197.00 | $175.00 |
| 78 | Light pole (installation only), as per plan (625E10503) | EACH | 14 | $1,250.00 | $1,450.00 | $2,450.00 |
| 79 | Light pole foundation, 24" X 8' deep (625E14100) | EACH | 14 | $2,500.00 | $2,750.00 | $4,200.00 |
| 80 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 2,025 | $7.50 | $8.00 | $8.00 |
| 81 | No. 10 AWG pole and bracket cable (625E23400) | FT | 2,226 | $2.80 | $3.00 | $5.00 |
| 82 | 1-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320) | FT | 1,699 | $18.00 | $20.00 | $25.00 |
| 83 | Conduit, 3", 725.04 (625E25500) | FT | 448 | $35.00 | $38.00 | $45.00 |
| 84 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 14 | $620.00 | $625.00 | $950.00 |
| 85 | Trench, 24" deep (625E29002) | FT | 1,880 | $14.00 | $15.00 | $26.00 |
| 86 | Pull box, 725.08, 18" (625E30700) | EACH | 2 | $1,400.00 | $1,500.00 | $2,500.00 |
| 87 | Pull box, 725.08, 24" (625E30706) | EACH | 6 | $1,600.00 | $1,750.00 | $2,800.00 |
| 88 | Pull box removed (625E31510) | EACH | 3 | $650.00 | $750.00 | $650.00 |
| 89 | Ground rod (625E32000) | EACH | 14 | $300.00 | $320.00 | $450.00 |
| 90 | Power service, as per plan (625E34001) | EACH | 1 | $2,200.00 | $2,300.00 | $8,500.00 |
| 91 | Control center cabinet, complete (625E34450) | EACH | 1 | $7,800.00 | $8,000.00 | $25,000 |
| 92 | Underground warning marking tape (625E36010) | FT | 1,880 | $2.15 | $2.50 | $4.00 |
| 93 | Light pole removed (625E75400) | EACH | 2 | $950.00 | $1,050.00 | $1,200.00 |
| 94 | Light pole foundation removed (625E75500) | EACH | 2 | $1,250.00 | $1,450.00 | $1,800.00 |
| 95 | Removal of delineator (620E31200) | EACH | 4 | $28.00 | $75.00 | $10.00 |
| 96 | RPM (621E00100) | EACH | 156 | $52.00 | $70.00 | $39.85 |
| 97 | Ground mounted support, no. 3 post (630E03100) | FT | 643.50 | $18.00 | $14.00 | $12.00 |
| 98 | Sign post reflector (630E08600) | EACH | 18 | $65.00 | $50.00 | $45.00 |
| 99 | Sign, flat sheet (630E80100) | SF | 325.20 | $23.00 | $28.00 | $25.00 |
| 100 | Removal of ground mounted sign and disposal (630E84900) | EACH | 43 | $20.00 | $28.00 | $25.00 |
| 101 | Removal of ground mounted post support and disposal (630E86002) | EACH | 34 | $25.00 | $28.00 | $25.00 |
| 102 | Signing, misc.: ground mounted support, with 12 in (630E97700) | EACH | 12 | $115.00 | $120.00 | $22.50 |
| 103 | Edge line, 6" (644E00104) | MI | 1.41 | $5,150.00 | $9,000.00 | $6,000.00 |
| 104 | Center line (644E00300) | MI | 0.35 | $6,000.00 | $11,000 | $8,000.00 |
| 105 | Transverse/diagonal line (644E00700) | FT | 542 | $10.00 | $10.00 | $7.00 |
| 106 | Dotted line, 12" (644E01520) | FT | 157 | $1.35 | $4.00 | $3.00 |
| 107 | Yield line (644E20800) | FT | 63 | $7.85 | $28.00 | $15.00 |
| 108 | Planting, misc.:10" gray washed river stone mulch (661E99930) | SY | 597 | $40.00 | $50.00 | $34.00 |
| 109 | Pavement repair (253E02000) | CY | 40 | $400.00 | $850.00 | $450.00 |
| 110 | Non-tracking tack coat (407E20000) | GAL | 40 | $5.00 | $5.00 | $3.00 |
| 111 | Asphalt concrete surface course, type 1, (448), PG64-22 (441E50000) | CY | 20 | $400.00 | $375.00 | $550.00 |
| 112 | Detour signing (614E12420) | LS | 1 | $18,000 | $20,000 | $15,000 |
| 113 | Water (616E10000) | MGAL | 40 | $40.00 | $2.00 | $1.00 |
| 114 | Compacted aggregate (617E10100) | CY | 100 | $70.00 | $150.00 | $125.00 |
| 115 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $25,000 | $38,000 | $30,000 |
| 116 | Maintaining traffic (614E11000) | LS | 1 | $40,000 | $25,000 | $25,000 |
| 117 | Field office, type B (619E16010) | MNTH | 9 | $3,500.00 | $500.00 | $2,000.00 |
| 118 | Construction layout stakes and surveying (623E10000) | LS | 1 | $45,000 | $35,000 | $40,000 |
| 119 | Mobilization (624E10000) | LS | 1 | $100,000 | $95,000 | $135,000 |
| 200 | Glare shield (625E28000) | EACH | 2 | $200.00 | $250.00 | $450.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 7, 2026. Compiled by Mirage Metrics.