Helms and Sons Excavating: ODOT bid record

Helms and Sons Excavating submitted 31 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 01 OCT 2026, and was the low bidder on 12 of them (39%). When it was not low, its total sat a median +5.0% above the low bid.

Owner
Ohio DOT
Low bid volume
$37,686,771
Latest bid
01 OCT 2026
Data through
12 NOV 2026
31Bids
12Low bids
39Win rate, percent
+5.0%Median gap to the low bid when not low, 19 bids

By year

YearBidsLow bidsWin rate
20202150%
20215240%
20225360%
20234125%
20243133%
20254250%
20268225%
Helms and Sons Excavating, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
HAR6233%
ALL6350%
AUG4250%
WYA4250%
HAN3267%
LOG200%
PAU2150%
UNI100%
WOO100%
VAN100%
MAR100%
Helms and Sons Excavating, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH2828 (100%)$1.00$1.00
Water659E35000MGAL2816 (57%)$1.00$1.00
Commercial fertilizer659E20000TON2712 (44%)$770.00$850.00
Aggregate base304E20000CY2512 (48%)$55.00$90.00
Proof rolling204E45000HR1911 (58%)$120.00$219.05
Non-tracking tack coat407E20000GAL2710 (37%)$2.75$3.25
Topsoil659E00300CY2510 (40%)$35.00$45.00
Embankment203E20000CY2310 (43%)$18.00$25.00
Excavation203E10000CY259 (36%)$18.00$27.00
Removal of ground mounted post support and disposal630E86002EACH189 (50%)$16.50$23.50
Removal of ground mounted sign and disposal630E84900EACH189 (50%)$15.50$20.00
Field office, type B619E16010MNTH139 (69%)$500.00$2,000.00
Helms and Sons Excavating, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Helms and Sons Excavating, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
01 OCT 2026260440AUGAUG-US 33 Rest Areas TP (PARKING AREAS)1 of 5$6,473,049Low, 2.0% under the second
30 JUL 2026260341ALLALL-Delphos S. Main St. Trail (SIDEWALK)4 of 5$650,213+39%
07 MAY 2026260226ALLALL-SR 117-10.78 (INTERSECTION)2 of 3$2,534,904+5.0%
07 MAY 2026260227AUGAUG-US 33-15.65 (INTERCHANGE)1 of 3$7,877,770Low, 5.0% under the second
07 MAY 2026260239HARHAR-US 68/SR 31 Roundabout (INTERSECTION)2 of 3$3,651,725+2.0%
09 APR 2026260176HARHAR-SR 67-Sidewalks (SIDEWALK)2 of 2$1,147,122+7.0%
26 MAR 2026260156LOGLOG-US 33-09.58 (INTERSECTION)3 of 5$4,727,601+18%
12 MAR 2026268001WYAWYA-US 30 Rest Areas TP (PARKING AREAS)2 of 10$3,440,241+1.0%
04 DEC 2025250530MARMAR-SR 95-17.90 (at Jamesway) (INTERCHANGE)2 of 5$2,690,933-6.0%
24 APR 2025250209ALLALL-Harrod Improvements (MINOR RECONSTRUCTION)6 of 6$2,600,035+69%
27 MAR 2025250159HARHAR-Detroit St. Reconstruction (MINOR RECONSTRUCTION)1 of 2$4,351,297Low, 1.0% under the second
27 FEB 2025250138WYAWYA-East Wyandot Ave. (TWO LANE RESURFACING)1 of 3$825,004Low, 4.0% under the second
21 MAR 2024240178HANHAN-US 68/SR 15 Interchange (INTERCHANGE)2 of 2$2,591,673+1.0%
25 JAN 2024240079WYAWYA-US 23-Rest Areas (MINOR RECONSTRUCTION)1 of 6$5,236,155Low, 4.0% under the second
11 JAN 2024240029WYAWYA-US 23-13.60 (MINOR RECONSTRUCTION)3 of 3$3,500,719+11%
14 DEC 2023230605VANVAN-CS-Leeson Avenue (MAJOR RECONSTRUCTION)2 of 3$6,808,7470.0%
11 MAY 2023230290HANHAN-SR 103-00.00 (SIDEWALK)1 of 1$1,425,359Low
09 FEB 2023230090HARHAR-SR 67-16.13 (TWO LANE RESURFACING)2 of 3$413,995+5.0%
26 JAN 2023230042AUGAUG-SR 65-10.62 (TWO LANE RESURFACING)2 of 2$832,000+25%
13 OCT 2022220542ALLALL-/HAN/WYA-SR 103/SR 117/SR 53-VAR. (TWO LANE RESURFACING)1 of 3$674,704Low, 6.0% under the second
10 MAR 2022220145HARHAR-SR 31/SR 53/SR 67-10.16/Var (TWO LANE RESURFACING)1 of 3$591,449Low, 10% under the second
17 FEB 2022220113AUGAUG-Bloody Bridge Parking Lot (PARKING AREAS)2 of 2$35,019+17%
27 JAN 2022220036ALLALL-SR 309-18.19/22.33 (PART 1 AND PART 2) (INTERSECTION)1 of 4$4,629,823Low, 7.0% under the second
27 JAN 2022220065WOOWOO-SR 25-00.75 Reconstruction (MAJOR RECONSTRUCTION)2 of 6$22,015,397+2.0%
25 FEB 2021210135PAUPAU-SR 49-00.00 (MINOR RECONSTRUCTION)1 of 5$1,284,580Low, 16% under the second
Helms and Sons Excavating: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy