ODOT contract 250138 bid tabulation
WYA-East Wyandot Ave. (TWO LANE RESURFACING). Let by Ohio DOT on February 27, 2025, WYA. 3 bids received; low bid $825,004 by Helms and Sons Excavating, +7.4% against the engineer's estimate of $768,000.
- Owner
- Ohio DOT
- Letting
- 27 FEB 2025
- Pay items
- 59
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Helms and Sons Excavating | $825,004 | Low | +7.0% |
| 2 | Kokosing Construction Company Inc | $860,343 | +4.0% | +12% |
| 3 | Shelly Company | $876,302 | +6.0% | +14% |
Engineer's estimate: $768,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Helms and Sons Excavating | 2. Kokosing Construction Company Inc | 3. Shelly Company |
|---|---|---|---|---|---|---|
| 1 | Curb removed (202E32000) | FT | 10 | $108.00 | $12.00 | $20.00 |
| 2 | Curb and gutter removed (202E32500) | FT | 33 | $50.00 | $16.00 | $20.00 |
| 3 | Excavation (203E10000) | CY | 127 | $45.00 | $55.00 | $60.00 |
| 4 | Reshaping under guardrail, as per plan (209E15001) | STA | 7.05 | $2,000.00 | $550.00 | $250.00 |
| 5 | Topsoil furnished and placed (653E10000) | CY | 57 | $125.00 | $125.00 | $150.00 |
| 6 | Seeding and mulching, class 2, as per plan (659E00511) | SY | 1,018 | $2.00 | $1.50 | $5.00 |
| 7 | Catch basin adjusted to grade (611E98630) | EACH | 2 | $2,000.00 | $1,100.00 | $1,500.00 |
| 8 | Pavement repair, as per plan (253E01001) | SY | 2,889 | $65.00 | $70.00 | $100.00 |
| 9 | Pavement planing, asphalt concrete, 1.5" (254E01000) | SY | 22,478 | $3.00 | $1.10 | $2.88 |
| 10 | Aggregate base (304E20000) | CY | 19 | $150.00 | $145.00 | $120.00 |
| 11 | Non-tracking tack coat (407E20000) | GAL | 1,958 | $3.00 | $2.75 | $2.00 |
| 12 | Asphalt concrete surface course, 12.5 MM, type A (448) (442E20000) | CY | 849.10 | $325.00 | $320.00 | $260.00 |
| 13 | Asphalt concrete intermediate course, 9.5 MM, type A (448), as per plan (442E20101) | CY | 75 | $310.00 | $320.00 | $280.00 |
| 14 | Asphalt concrete surface course, 12.5 MM, type A (449) (driveways) (442E22120) | CY | 10.10 | $500.00 | $1,200.00 | $1,000.00 |
| 15 | 6" non-reinforced concrete pavement, class QC MS (452E10050) | SY | 68 | $132.00 | $97.18 | $118.50 |
| 16 | Combination curb and gutter, type 2 (609E12000) | FT | 33 | $97.00 | $42.00 | $79.00 |
| 17 | Curb, type 6 (609E26000) | FT | 10 | $162.00 | $37.00 | $69.00 |
| 18 | Compacted aggregate (617E10100) | CY | 77 | $109.00 | $30.00 | $120.00 |
| 19 | Rumble stripes, edge line (asphalt concrete) (618E41000) | MI | 1.30 | $5,500.00 | $5,300.00 | $5,300.00 |
| 20 | Valve box adjusted to grade, as per plan (638E10801) | EACH | 1 | $2,000.00 | $900.00 | $725.00 |
| 21 | Manhole adjusted to grade (611E99654) | EACH | 2 | $3,000.00 | $975.00 | $1,400.00 |
| 22 | RPM (621E00100) | EACH | 100 | $85.00 | $65.00 | $67.70 |
| 23 | Raised pavement marker removed (621E54000) | EACH | 100 | $9.00 | $1.00 | $9.00 |
| 24 | Ground mounted support, no. 3 post (630E03100) | FT | 883 | $12.00 | $12.00 | $12.00 |
| 25 | Street name sign support, no. 3 post (630E08520) | FT | 2 | $12.00 | $12.00 | $12.00 |
| 26 | Sign, flat sheet, as per plan (630E80101) | SF | 436.10 | $25.00 | $25.00 | $25.00 |
| 27 | Sign, double faced, street name (630E80500) | EACH | 4 | $125.00 | $125.00 | $125.00 |
| 28 | Removal of ground mounted sign and disposal (630E84900) | EACH | 111 | $20.00 | $20.00 | $20.00 |
| 29 | Removal of ground mounted post support and disposal (630E86002) | EACH | 77 | $20.00 | $20.00 | $20.00 |
| 30 | Edge line, 4", type 1 (642E00100) | MI | 0.16 | $5,000.00 | $2,000.00 | $5,000.00 |
| 31 | Center line, type 1 (642E00300) | MI | 0.09 | $10,000 | $2,000.00 | $10,000 |
| 32 | Channelizing line, 8", type 1 (642E00400) | FT | 320 | $1.00 | $1.00 | $1.00 |
| 33 | Stop line, type 1 (642E00500) | FT | 36 | $3.00 | $3.00 | $3.00 |
| 34 | Transverse/diagonal line, type 1 (642E00700) | FT | 242 | $3.00 | $3.00 | $3.00 |
| 35 | Island marking, type 1 (642E00900) | SF | 96 | $5.00 | $3.00 | $5.00 |
| 36 | Lane arrow, type 1 (642E01300) | EACH | 6 | $50.00 | $55.00 | $50.00 |
| 37 | Word on pavement, 96", type 1 (642E01410) | EACH | 3 | $100.00 | $75.00 | $100.00 |
| 38 | Edge line, 4" (644E00100) | MI | 1.30 | $2,750.00 | $4,000.00 | $2,750.00 |
| 39 | Center line (644E00300) | MI | 1.25 | $5,500.00 | $7,000.00 | $5,500.00 |
| 40 | Channelizing line, 8" (644E00400) | FT | 824 | $2.00 | $2.00 | $2.00 |
| 41 | Stop line (644E00500) | FT | 84 | $8.00 | $7.00 | $8.00 |
| 42 | Transverse/diagonal line (644E00700) | FT | 196 | $7.00 | $7.00 | $7.00 |
| 43 | Island marking (644E00900) | SF | 157 | $10.00 | $5.00 | $10.00 |
| 44 | Lane arrow (644E01300) | EACH | 16 | $85.00 | $100.00 | $85.00 |
| 45 | Asphalt concrete for maintaining traffic (614E13000) | CY | 2 | $600.00 | $1,500.00 | $300.00 |
| 46 | Work zone center line, class III, 642 paint (614E21550) | MI | 2.72 | $1,400.00 | $2,000.00 | $1,400.00 |
| 47 | Work zone edge line, class III, 4", 642 paint (614E22350) | MI | 1.10 | $700.00 | $2,000.00 | $700.00 |
| 48 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 1,648 | $0.50 | $1.00 | $0.50 |
| 49 | Work zone transverse/diagonal line, class III, 642 paint (614E25620) | FT | 196 | $3.00 | $3.00 | $3.00 |
| 50 | Work zone stop line, class III, 642 paint (614E26610) | FT | 168 | $3.00 | $3.00 | $3.00 |
| 51 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 28 | $30.00 | $55.00 | $30.00 |
| 52 | Work zone island marking, class III, 642 paint (614E32800) | SF | 157 | $5.00 | $3.00 | $5.00 |
| 53 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $12,000 | $3,500.00 | $2,103.68 |
| 54 | Maintaining traffic (614E11000) | LS | 1 | $35,750 | $150,325 | $90,000 |
| 55 | Construction layout stakes and surveying (623E10000) | LS | 1 | $12,500 | $1,100.00 | $2,430.00 |
| 56 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $7,500.00 | $1,250.00 | $3,000.00 |
| 57 | Post construction survey monument verification and report (623E51000) | LS | 1 | $7,500.00 | $1,250.00 | $3,000.00 |
| 58 | Mobilization (624E10000) | LS | 1 | $40,000 | $43,000 | $40,000 |
| 100 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 40 | $75.00 | $100.00 | $75.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of February 27, 2025. Compiled by Mirage Metrics.