ODOT contract 250530 bid tabulation
MAR-SR 95-17.90 (at Jamesway) (INTERCHANGE). Let by Ohio DOT on December 4, 2025, MAR. 5 bids received; low bid $2,859,334 by Shelly & Sands Inc, -0.6% against the engineer's estimate of $2,878,000.
- Owner
- Ohio DOT
- Letting
- 04 DEC 2025
- Pay items
- 141
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly & Sands Inc | $2,859,334 | Low | -1.0% |
| 2 | Helms and Sons Excavating | $2,690,933 | -6.0% | -6.0% |
| 3 | Complete General Construction Company | $3,053,707 | +7.0% | +6.0% |
| 4 | Double Z Construction Company | $3,223,583 | +13% | +12% |
| 5 | Rietschlin Construction Inc | $3,310,867 | +16% | +15% |
Engineer's estimate: $2,878,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly & Sands Inc | 2. Helms and Sons Excavating | 3. Complete General Construction Company | 4. Double Z Construction Company | 5. Rietschlin Construction Inc |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $14,000 | $50,000 | $4,000.00 | $8,000.00 | $20,000 |
| 2 | Pavement removed (202E23000) | SY | 691 | $17.00 | $20.00 | $25.00 | $38.00 | $20.00 |
| 3 | Concrete barrier removed (202E30700) | FT | 285 | $34.00 | $25.00 | $75.00 | $50.00 | $35.00 |
| 4 | Concrete barrier removed, as per plan (202E30701) | FT | 216 | $45.00 | $35.00 | $75.00 | $65.00 | $66.00 |
| 5 | Gutter removed, as per plan (202E32601) | FT | 79 | $35.00 | $30.00 | $12.00 | $20.00 | $68.00 |
| 6 | Pipe removed, 24" and under (202E35100) | FT | 105 | $22.00 | $25.00 | $14.00 | $20.00 | $34.00 |
| 7 | Guardrail removed (202E38000) | FT | 173 | $4.00 | $5.00 | $3.00 | $4.00 | $11.00 |
| 8 | Catch basin removed (202E58100) | EACH | 1 | $330.00 | $750.00 | $750.00 | $600.00 | $800.00 |
| 9 | Fence removed (202E75000) | FT | 10 | $78.00 | $10.00 | $15.00 | $15.00 | $55.00 |
| 10 | Removal misc.: bollard (202E98100) | EACH | 2 | $145.00 | $250.00 | $100.00 | $150.00 | $880.00 |
| 11 | Removal misc.:exist wood post (202E98100) | EACH | 1 | $295.00 | $40.00 | $40.00 | $150.00 | $350.00 |
| 12 | Excavation (203E10000) | CY | 841 | $21.00 | $35.00 | $50.00 | $40.00 | $31.00 |
| 13 | Embankment (203E20000) | CY | 1,166 | $17.00 | $35.00 | $20.00 | $45.00 | $27.00 |
| 14 | Subgrade compaction (204E10000) | SY | 2,118 | $3.50 | $5.00 | $4.50 | $12.00 | $2.00 |
| 15 | Proof rolling (204E45000) | HR | 2 | $260.00 | $120.00 | $350.00 | $200.00 | $460.00 |
| 16 | Full depth pavement sawing (255E20000) | FT | 2,347 | $2.50 | $2.00 | $3.50 | $3.00 | $3.00 |
| 17 | Guardrail, type MGS (606E15050) | FT | 25 | $32.00 | $60.00 | $48.40 | $30.00 | $33.00 |
| 18 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 2 | $2,500.00 | $5,000.00 | $5,070.00 | $2,500.00 | $2,750.00 |
| 19 | Impact attenuator, type 2 (unidirectional) 35 MPH, (606E60022) | EACH | 2 | $23,000 | $27,000 | $23,950 | $19,500 | $23,950 |
| 20 | Impact attenuator, type 2 (unidirectional) 35 MPH, (606E60022) | EACH | 2 | $34,000 | $31,000 | $26,500 | $29,500 | $34,950 |
| 21 | 4" concrete walk (608E10000) | SF | 3,736 | $6.60 | $10.00 | $13.00 | $15.00 | $9.00 |
| 22 | Curb ramp (608E52000) | SF | 892 | $18.00 | $25.00 | $25.00 | $40.00 | $21.00 |
| 23 | Curb, type 6 (609E26000) | FT | 30 | $30.00 | $90.00 | $60.00 | $90.00 | $80.00 |
| 24 | Inspection and compaction testing of unbound materials (878E25000) | LS | 1 | $11,600 | $500.00 | $1,750.00 | $17,000 | $10,000 |
| 25 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 3.60 | $160.00 | $250.00 | $150.00 | $300.00 | $150.00 |
| 26 | Rock channel protection, type B with filter (601E32100) | CY | 272.60 | $212.00 | $125.00 | $185.00 | $90.00 | $120.00 |
| 27 | Soil analysis test (659E00100) | EACH | 2 | $140.00 | $75.00 | $150.00 | $150.00 | $150.00 |
| 28 | Topsoil (659E00300) | CY | 804 | $28.00 | $40.00 | $45.00 | $55.00 | $51.00 |
| 29 | Seeding and mulching, class 1 (659E00500) | SY | 6,359 | $1.00 | $2.00 | $1.60 | $5.00 | $1.75 |
| 30 | Repair seeding and mulching (659E14000) | SY | 318 | $0.80 | $2.00 | $1.60 | $1.60 | $1.75 |
| 31 | Inter-seeding (659E15000) | SY | 318 | $0.80 | $1.00 | $1.60 | $1.60 | $1.75 |
| 32 | Commercial fertilizer (659E20000) | TON | 0.89 | $900.00 | $770.00 | $1,250.00 | $1,250.00 | $1,300.00 |
| 33 | Lime (659E31000) | ACRE | 1.32 | $160.00 | $40.00 | $150.00 | $150.00 | $150.00 |
| 34 | Water (659E35000) | MGAL | 36 | $1.00 | $1.00 | $1.00 | $1.00 | $10.00 |
| 35 | Slope erosion protection (670E00500) | SY | 884 | $1.60 | $2.00 | $2.50 | $2.50 | $4.00 |
| 36 | Storm water pollution prevention plan (832E15000) | LS | 1 | $2,400.00 | $5,600.00 | $2,500.00 | $2,500.00 | $2,650.00 |
| 37 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $6,500.00 | $5,000.00 | $17,100 | $20,000 | $9,500.00 |
| 38 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $12,500 | $11,000 | $12,180 | $15,000 | $15,500 |
| 39 | Erosion control (832E30000) | EACH | 30,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 40 | Class QC1 concrete, headwall (511E46610) | CY | 0.49 | $18,000 | $5,000.00 | $3,000.00 | $10,000 | $3,800.00 |
| 41 | 6" base pipe underdrains (605E14000) | FT | 458 | $18.00 | $20.00 | $20.00 | $18.00 | $16.25 |
| 42 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 32 | $29.00 | $25.00 | $45.00 | $30.00 | $41.00 |
| 43 | 12" conduit, type B (611E04400) | FT | 144 | $115.00 | $100.00 | $125.00 | $190.00 | $130.00 |
| 44 | 12" conduit, type C (611E04600) | FT | 9 | $217.00 | $250.00 | $175.00 | $185.00 | $400.00 |
| 45 | 14" X 23" conduit, type C, 706.04 (611E52204) | FT | 249 | $187.00 | $235.00 | $190.00 | $200.00 | $200.00 |
| 46 | Catch basin, no. 3A (611E98180) | EACH | 1 | $4,700.00 | $4,500.00 | $4,750.00 | $5,000.00 | $7,800.00 |
| 47 | Catch basin, no. 2-2B (611E98470) | EACH | 4 | $3,100.00 | $3,000.00 | $2,750.00 | $3,500.00 | $2,760.00 |
| 48 | Catch basin reconstructed to grade, as per plan (611E98635) | EACH | 5 | $2,000.00 | $1,500.00 | $2,000.00 | $1,300.00 | $3,350.00 |
| 49 | Manhole, no. 3 (611E99574) | EACH | 4 | $4,200.00 | $5,500.00 | $4,500.00 | $4,500.00 | $3,650.00 |
| 50 | Manhole adjusted to grade (611E99654) | EACH | 5 | $2,550.00 | $2,000.00 | $1,600.00 | $950.00 | $1,250.00 |
| 51 | Precast reinforced concrete outlet (611E99710) | EACH | 2 | $290.00 | $1,000.00 | $550.00 | $500.00 | $325.00 |
| 52 | Pavement planing, asphalt concrete [T=3.25"] (254E01000) | SY | 20,195 | $6.00 | $8.00 | $6.00 | $3.70 | $4.25 |
| 53 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 185 | $440.00 | $225.00 | $440.00 | $320.00 | $352.00 |
| 54 | Aggregate base (304E20000) | CY | 209 | $98.00 | $60.00 | $80.00 | $135.00 | $134.00 |
| 55 | Aggregate base, as per plan (304E20001) | CY | 192 | $93.00 | $60.00 | $80.00 | $135.00 | $149.00 |
| 56 | Non-tracking tack coat (407E20000) | GAL | 3,029 | $3.50 | $3.00 | $3.50 | $3.00 | $3.50 |
| 57 | Asphalt concrete surface course, 12.5 MM, type A (449) (442E22100) | CY | 931 | $280.00 | $290.00 | $280.00 | $278.00 | $306.00 |
| 58 | Asphalt concrete intermediate course, 19 MM, type B (449) (442E22450) | CY | 1,086 | $210.00 | $255.00 | $210.00 | $240.00 | $264.00 |
| 59 | Bracket arm, 12' (625E18100) | EACH | 16 | $1,250.00 | $280.00 | $1,250.00 | $1,100.00 | $1,210.00 |
| 60 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 16 | $250.00 | $1,150.00 | $250.00 | $290.00 | $319.00 |
| 61 | Ground rod (625E32000) | EACH | 29 | $300.00 | $500.00 | $300.00 | $265.00 | $292.00 |
| 62 | RPM (621E00100) | EACH | 150 | $49.00 | $45.00 | $39.00 | $49.00 | $43.00 |
| 63 | Ground mounted support, no. 3 post (630E03100) | FT | 1,138.92 | $15.00 | $20.00 | $15.00 | $17.50 | $20.50 |
| 64 | Sign hanger assembly, span wire (630E79000) | EACH | 1 | $500.00 | $900.00 | $785.00 | $600.00 | $324.00 |
| 65 | Sign support assembly, pole mounted (630E79500) | EACH | 13 | $150.00 | $300.00 | $265.00 | $175.00 | $121.50 |
| 66 | Sign, flat sheet (630E80100) | SF | 969.73 | $24.00 | $25.00 | $20.00 | $24.00 | $23.00 |
| 67 | Removal of ground mounted sign and disposal (630E84900) | EACH | 102 | $25.00 | $12.00 | $10.80 | $20.00 | $19.00 |
| 68 | Removal of ground mounted sign and reerection (630E85100) | EACH | 4 | $100.00 | $70.00 | $65.00 | $150.00 | $37.00 |
| 69 | Removal of ground mounted post support and disposal (630E86002) | EACH | 107 | $25.00 | $17.00 | $15.00 | $20.00 | $25.00 |
| 70 | Edge line, 6" (644E00104) | MI | 0.61 | $6,000.00 | $7,150.00 | $4,000.00 | $4,000.00 | $4,400.00 |
| 71 | Edge line, 6" (644E00104) | MI | 0.12 | $6,000.00 | $7,150.00 | $4,000.00 | $4,000.00 | $4,400.00 |
| 72 | Lane line, 6" (644E00204) | MI | 0.45 | $2,500.00 | $6,050.00 | $3,300.00 | $3,300.00 | $3,700.00 |
| 73 | Center line (644E00300) | MI | 0.46 | $8,500.00 | $8,800.00 | $5,100.00 | $5,100.00 | $5,700.00 |
| 74 | Channelizing line, 12" (644E00404) | FT | 3,318 | $2.50 | $4.00 | $2.60 | $2.60 | $3.00 |
| 75 | Stop line (644E00500) | FT | 465 | $8.00 | $7.50 | $10.00 | $10.00 | $11.00 |
| 76 | Crosswalk line, 12" (644E00620) | FT | 1,241 | $4.00 | $4.00 | $11.00 | $11.00 | $12.25 |
| 77 | School symbol marking, 72" (644E01100) | EACH | 2 | $350.00 | $880.00 | $500.00 | $500.00 | $550.00 |
| 78 | Lane arrow (644E01300) | EACH | 27 | $110.00 | $110.00 | $120.00 | $120.00 | $132.00 |
| 79 | Dotted line, 6" (644E01510) | FT | 92 | $2.00 | $3.50 | $2.00 | $2.00 | $2.25 |
| 80 | Bike lane symbol marking (644E01630) | EACH | 11 | $275.00 | $330.00 | $110.00 | $110.00 | $121.00 |
| 81 | Conduit, 2", 725.04 (625E25400) | FT | 366 | $18.00 | $5.50 | $18.00 | $21.00 | $23.25 |
| 82 | Conduit, 3", 725.04 (625E25500) | FT | 112 | $50.00 | $11.00 | $50.00 | $32.00 | $35.25 |
| 83 | Conduit, 4", 725.04 (625E25600) | FT | 101 | $60.00 | $11.50 | $60.00 | $42.00 | $46.25 |
| 84 | Conduit, jacked or drilled, 725.04, 2" (625E25902) | FT | 134 | $35.00 | $44.00 | $35.00 | $43.00 | $47.50 |
| 85 | Trench (625E29000) | FT | 478 | $16.00 | $9.00 | $16.00 | $12.00 | $13.25 |
| 86 | Pull box, 725.08, 18" (625E30700) | EACH | 6 | $1,000.00 | $1,300.00 | $1,000.00 | $1,050.00 | $1,155.00 |
| 87 | Pull box, 725.08, 24" (625E30706) | EACH | 4 | $1,400.00 | $1,650.00 | $1,400.00 | $1,350.00 | $1,485.00 |
| 88 | Arc flash calculations and label james way, US-23 (625E76000) | EACH | 4 | $3,650.00 | $2,200.00 | $3,650.00 | $3,450.00 | $3,800.00 |
| 89 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate (632E05006) | EACH | 23 | $950.00 | $1,250.00 | $950.00 | $1,350.00 | $1,485.00 |
| 90 | Vehicular signal head, (LED), 4-section, 12" lens, 1-way, polycarbonate (632E05064) | EACH | 2 | $1,225.00 | $1,400.00 | $1,225.00 | $1,900.00 | $2,090.00 |
| 91 | Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate (632E05086) | EACH | 11 | $1,600.00 | $1,900.00 | $1,600.00 | $2,150.00 | $2,365.00 |
| 92 | Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731) | EACH | 20 | $625.00 | $850.00 | $625.00 | $850.00 | $935.00 |
| 93 | Covering of vehicular signal head (632E25000) | EACH | 36 | $30.00 | $90.00 | $30.00 | $50.00 | $55.00 |
| 94 | Covering of pedestrian signal head (632E25010) | EACH | 20 | $30.00 | $90.00 | $30.00 | $40.00 | $44.00 |
| 95 | Pedestrian pushbutton (632E26000) | EACH | 4 | $325.00 | $950.00 | $325.00 | $265.00 | $292.00 |
| 96 | Messenger wire, 7 strand, 1/2" diameter with accessories (632E30400) | FT | 1,518 | $21.00 | $5.00 | $21.00 | $22.00 | $24.25 |
| 97 | Tether wire, with accessories (632E30600) | FT | 1,518 | $23.00 | $6.00 | $23.00 | $22.00 | $24.25 |
| 98 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 4,221 | $3.00 | $5.00 | $3.00 | $3.00 | $3.50 |
| 99 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 4,112 | $3.50 | $5.00 | $3.50 | $5.00 | $5.50 |
| 100 | Signal cable, 3 conductor, no. 12 AWG (632E42300) | FT | 2,133 | $2.70 | $3.50 | $2.75 | $4.00 | $4.50 |
| 101 | Signal support foundation (632E64010) | EACH | 16 | $10,000 | $3,800.00 | $10,000 | $8,700.00 | $9,570.00 |
| 102 | Pedestal foundation (632E64020) | EACH | 5 | $1,000.00 | $1,300.00 | $1,000.00 | $1,350.00 | $1,485.00 |
| 103 | Test hole performed (632E64950) | EACH | 8 | $3,000.00 | $2,200.00 | $3,000.00 | $800.00 | $880.00 |
| 104 | Loop detector lead-in cable (632E65200) | FT | 1,244 | $2.00 | $5.50 | $2.00 | $2.50 | $2.75 |
| 105 | Service cable, 3 conductor, no. 6 AWG (632E69800) | FT | 471 | $7.50 | $5.50 | $7.50 | $9.00 | $10.00 |
| 106 | Power service (632E70000) | EACH | 4 | $2,000.00 | $1,100.00 | $2,000.00 | $1,600.00 | $1,760.00 |
| 107 | Conduit riser, 2" diameter (632E70400) | EACH | 4 | $500.00 | $550.00 | $500.00 | $650.00 | $715.00 |
| 108 | Combination strain pole, type TC-81.11, design 12 (632E87140) | EACH | 8 | $12,000 | $3,300.00 | $12,000 | $13,500 | $14,850 |
| 109 | Combination strain pole, type TC-81.11, design 13 (632E87150) | EACH | 8 | $14,000 | $4,400.00 | $14,000 | $15,600 | $17,160 |
| 110 | Pedestal, 5', transformer base (632E89802) | EACH | 4 | $850.00 | $1,980.00 | $850.00 | $900.00 | $990.00 |
| 111 | Removal of traffic signal installation (632E90100) | EACH | 4 | $5,000.00 | $10,000 | $5,000.00 | $3,500.00 | $3,850.00 |
| 112 | Cabinet, type TS-2, as per plan (633E65511) | EACH | 4 | $14,500 | $13,200 | $17,500 | $16,600 | $18,260 |
| 113 | Cabinet foundation (633E67100) | EACH | 4 | $5,000.00 | $2,200.00 | $5,000.00 | $3,200.00 | $3,520.00 |
| 114 | Controller work pad (633E67200) | EACH | 4 | $3,000.00 | $660.00 | $3,000.00 | $750.00 | $825.00 |
| 115 | Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001) | EACH | 4 | $7,000.00 | $7,700.00 | $7,000.00 | $8,700.00 | $9,570.00 |
| 116 | Ethernet cable, outdoor-rated (809E64550) | FT | 232 | $3.00 | $2.50 | $3.00 | $3.50 | $4.00 |
| 117 | ITS device, misc.:2" ITS pull box W/ pad & standar (809E65990) | EACH | 3 | $3,200.00 | $440.00 | $3,200.00 | $3,425.00 | $3,768.00 |
| 118 | ITS device, misc.:relocate existing communications (809E65990) | EACH | 4 | $1,500.00 | $330.00 | $1,500.00 | $850.00 | $935.00 |
| 119 | Advance radar detection, as per plan (809E69001) | EACH | 8 | $9,000.00 | $5,500.00 | $9,000.00 | $10,050 | $11,055 |
| 120 | Stop line radar detection, as per plan (809E69101) | EACH | 12 | $8,750.00 | $6,600.00 | $8,750.00 | $9,700.00 | $10,669 |
| 121 | Atc controller, as per plan (809E69123) | EACH | 4 | $500.00 | $4,400.00 | $500.00 | $1,000.00 | $1,100.00 |
| 122 | Maintaining ITS during construction (809E70000) | LS | 1 | $640.00 | $6,600.00 | $640.00 | $28,000 | $28,000 |
| 123 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 1 | $2,200.00 | $2,300.00 | $2,440.00 | $2,200.00 | $2,308.00 |
| 124 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 8 | $2,300.00 | $2,400.00 | $2,480.00 | $2,250.00 | $2,418.00 |
| 125 | Barrier reflector, type 1, one way (614E13310) | EACH | 65 | $13.00 | $11.00 | $14.00 | $15.00 | $12.00 |
| 126 | Object marker, one way (614E13350) | EACH | 65 | $17.00 | $20.00 | $18.00 | $18.00 | $21.00 |
| 127 | Work zone lane line, class I, 6", 642 paint (614E20110) | MI | 0.24 | $3,500.00 | $5,500.00 | $9,800.00 | $9,800.00 | $10,800 |
| 128 | Work zone center line, class I, 642 paint (614E21100) | MI | 0.10 | $16,500 | $7,700.00 | $9,800.00 | $9,800.00 | $10,800 |
| 129 | Work zone edge line, class I, 4", 642 paint (614E22100) | MI | 0.47 | $6,400.00 | $6,600.00 | $9,800.00 | $9,800.00 | $10,800 |
| 130 | Work zone channelizing line, class I, 8", 642 paint (614E23200) | FT | 440 | $4.00 | $3.50 | $1.00 | $1.00 | $1.10 |
| 131 | Work zone dotted line, class I, 4", 642 paint (614E24200) | FT | 188 | $7.00 | $2.50 | $0.90 | $0.90 | $1.00 |
| 132 | Water (616E10000) | MGAL | 50 | $100.00 | $1.50 | $44.00 | $15.00 | $11.00 |
| 133 | Portable barrier, unanchored (622E41100) | FT | 3,234 | $17.00 | $20.00 | $25.00 | $25.00 | $26.50 |
| 134 | Concrete barrier, single slope, type C, as per plan (622E10121) | FT | 290 | $350.00 | $450.00 | $545.00 | $500.00 | $370.00 |
| 135 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $11,500 | $45,000 | $20,500 | $20,000 | $35,000 |
| 136 | Maintaining traffic (614E11000) | LS | 1 | $66,000 | $75,000 | $95,000 | $190,000 | $170,000 |
| 137 | Construction layout stakes and surveying (623E10000) | LS | 1 | $15,900 | $37,500 | $20,000 | $34,500 | $25,000 |
| 138 | Mobilization (624E10000) | LS | 1 | $142,000 | $75,000 | $140,000 | $100,000 | $150,000 |
| 200 | Fence removed for reuse (202E75200) | FT | 20 | $160.00 | $20.00 | $30.00 | $50.00 | $55.00 |
| 201 | Paved gutter, type 1-4 (601E38000) | FT | 273 | $95.00 | $65.00 | $80.00 | $100.00 | $80.00 |
| 202 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 160 | $106.00 | $55.00 | $130.00 | $70.00 | $94.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of December 4, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.