ODOT contract 250530 bid tabulation

MAR-SR 95-17.90 (at Jamesway) (INTERCHANGE). Let by Ohio DOT on December 4, 2025, MAR. 5 bids received; low bid $2,859,334 by Shelly & Sands Inc, -0.6% against the engineer's estimate of $2,878,000.

Owner
Ohio DOT
Letting
04 DEC 2025
Pay items
141
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Shelly & Sands Inc$2,859,334Low-1.0%
2Helms and Sons Excavating$2,690,933-6.0%-6.0%
3Complete General Construction Company$3,053,707+7.0%+6.0%
4Double Z Construction Company$3,223,583+13%+12%
5Rietschlin Construction Inc$3,310,867+16%+15%
ODOT contract 250530: bids by rank

Engineer's estimate: $2,878,000.

Bid tabulation

LinePay itemUnitQuantity1. Shelly & Sands Inc2. Helms and Sons Excavating3. Complete General Construction Company4. Double Z Construction Company5. Rietschlin Construction Inc
1Clearing and grubbing (201E11000)LS1$14,000$50,000$4,000.00$8,000.00$20,000
2Pavement removed (202E23000)SY691$17.00$20.00$25.00$38.00$20.00
3Concrete barrier removed (202E30700)FT285$34.00$25.00$75.00$50.00$35.00
4Concrete barrier removed, as per plan (202E30701)FT216$45.00$35.00$75.00$65.00$66.00
5Gutter removed, as per plan (202E32601)FT79$35.00$30.00$12.00$20.00$68.00
6Pipe removed, 24" and under (202E35100)FT105$22.00$25.00$14.00$20.00$34.00
7Guardrail removed (202E38000)FT173$4.00$5.00$3.00$4.00$11.00
8Catch basin removed (202E58100)EACH1$330.00$750.00$750.00$600.00$800.00
9Fence removed (202E75000)FT10$78.00$10.00$15.00$15.00$55.00
10Removal misc.: bollard (202E98100)EACH2$145.00$250.00$100.00$150.00$880.00
11Removal misc.:exist wood post (202E98100)EACH1$295.00$40.00$40.00$150.00$350.00
12Excavation (203E10000)CY841$21.00$35.00$50.00$40.00$31.00
13Embankment (203E20000)CY1,166$17.00$35.00$20.00$45.00$27.00
14Subgrade compaction (204E10000)SY2,118$3.50$5.00$4.50$12.00$2.00
15Proof rolling (204E45000)HR2$260.00$120.00$350.00$200.00$460.00
16Full depth pavement sawing (255E20000)FT2,347$2.50$2.00$3.50$3.00$3.00
17Guardrail, type MGS (606E15050)FT25$32.00$60.00$48.40$30.00$33.00
18MGS bridge terminal assembly, type 1 (606E35002)EACH2$2,500.00$5,000.00$5,070.00$2,500.00$2,750.00
19Impact attenuator, type 2 (unidirectional) 35 MPH, (606E60022)EACH2$23,000$27,000$23,950$19,500$23,950
20Impact attenuator, type 2 (unidirectional) 35 MPH, (606E60022)EACH2$34,000$31,000$26,500$29,500$34,950
214" concrete walk (608E10000)SF3,736$6.60$10.00$13.00$15.00$9.00
22Curb ramp (608E52000)SF892$18.00$25.00$25.00$40.00$21.00
23Curb, type 6 (609E26000)FT30$30.00$90.00$60.00$90.00$80.00
24Inspection and compaction testing of unbound materials (878E25000)LS1$11,600$500.00$1,750.00$17,000$10,000
25Tied concrete block mat with type 1 underlayment (601E21050)SY3.60$160.00$250.00$150.00$300.00$150.00
26Rock channel protection, type B with filter (601E32100)CY272.60$212.00$125.00$185.00$90.00$120.00
27Soil analysis test (659E00100)EACH2$140.00$75.00$150.00$150.00$150.00
28Topsoil (659E00300)CY804$28.00$40.00$45.00$55.00$51.00
29Seeding and mulching, class 1 (659E00500)SY6,359$1.00$2.00$1.60$5.00$1.75
30Repair seeding and mulching (659E14000)SY318$0.80$2.00$1.60$1.60$1.75
31Inter-seeding (659E15000)SY318$0.80$1.00$1.60$1.60$1.75
32Commercial fertilizer (659E20000)TON0.89$900.00$770.00$1,250.00$1,250.00$1,300.00
33Lime (659E31000)ACRE1.32$160.00$40.00$150.00$150.00$150.00
34Water (659E35000)MGAL36$1.00$1.00$1.00$1.00$10.00
35Slope erosion protection (670E00500)SY884$1.60$2.00$2.50$2.50$4.00
36Storm water pollution prevention plan (832E15000)LS1$2,400.00$5,600.00$2,500.00$2,500.00$2,650.00
37Storm water pollution prevention inspections (832E15002)LS1$6,500.00$5,000.00$17,100$20,000$9,500.00
38Storm water pollution prevention inspection software (832E15010)LS1$12,500$11,000$12,180$15,000$15,500
39Erosion control (832E30000)EACH30,000$1.00$1.00$1.00$1.00$1.00
40Class QC1 concrete, headwall (511E46610)CY0.49$18,000$5,000.00$3,000.00$10,000$3,800.00
416" base pipe underdrains (605E14000)FT458$18.00$20.00$20.00$18.00$16.25
426" conduit, type F for underdrain outlets (611E00510)FT32$29.00$25.00$45.00$30.00$41.00
4312" conduit, type B (611E04400)FT144$115.00$100.00$125.00$190.00$130.00
4412" conduit, type C (611E04600)FT9$217.00$250.00$175.00$185.00$400.00
4514" X 23" conduit, type C, 706.04 (611E52204)FT249$187.00$235.00$190.00$200.00$200.00
46Catch basin, no. 3A (611E98180)EACH1$4,700.00$4,500.00$4,750.00$5,000.00$7,800.00
47Catch basin, no. 2-2B (611E98470)EACH4$3,100.00$3,000.00$2,750.00$3,500.00$2,760.00
48Catch basin reconstructed to grade, as per plan (611E98635)EACH5$2,000.00$1,500.00$2,000.00$1,300.00$3,350.00
49Manhole, no. 3 (611E99574)EACH4$4,200.00$5,500.00$4,500.00$4,500.00$3,650.00
50Manhole adjusted to grade (611E99654)EACH5$2,550.00$2,000.00$1,600.00$950.00$1,250.00
51Precast reinforced concrete outlet (611E99710)EACH2$290.00$1,000.00$550.00$500.00$325.00
52Pavement planing, asphalt concrete [T=3.25"] (254E01000)SY20,195$6.00$8.00$6.00$3.70$4.25
53Asphalt concrete base, PG64-22, (449) (301E56000)CY185$440.00$225.00$440.00$320.00$352.00
54Aggregate base (304E20000)CY209$98.00$60.00$80.00$135.00$134.00
55Aggregate base, as per plan (304E20001)CY192$93.00$60.00$80.00$135.00$149.00
56Non-tracking tack coat (407E20000)GAL3,029$3.50$3.00$3.50$3.00$3.50
57Asphalt concrete surface course, 12.5 MM, type A (449) (442E22100)CY931$280.00$290.00$280.00$278.00$306.00
58Asphalt concrete intermediate course, 19 MM, type B (449) (442E22450)CY1,086$210.00$255.00$210.00$240.00$264.00
59Bracket arm, 12' (625E18100)EACH16$1,250.00$280.00$1,250.00$1,100.00$1,210.00
60Luminaire, conventional, solid state (LED), as per plan (625E26253)EACH16$250.00$1,150.00$250.00$290.00$319.00
61Ground rod (625E32000)EACH29$300.00$500.00$300.00$265.00$292.00
62RPM (621E00100)EACH150$49.00$45.00$39.00$49.00$43.00
63Ground mounted support, no. 3 post (630E03100)FT1,138.92$15.00$20.00$15.00$17.50$20.50
64Sign hanger assembly, span wire (630E79000)EACH1$500.00$900.00$785.00$600.00$324.00
65Sign support assembly, pole mounted (630E79500)EACH13$150.00$300.00$265.00$175.00$121.50
66Sign, flat sheet (630E80100)SF969.73$24.00$25.00$20.00$24.00$23.00
67Removal of ground mounted sign and disposal (630E84900)EACH102$25.00$12.00$10.80$20.00$19.00
68Removal of ground mounted sign and reerection (630E85100)EACH4$100.00$70.00$65.00$150.00$37.00
69Removal of ground mounted post support and disposal (630E86002)EACH107$25.00$17.00$15.00$20.00$25.00
70Edge line, 6" (644E00104)MI0.61$6,000.00$7,150.00$4,000.00$4,000.00$4,400.00
71Edge line, 6" (644E00104)MI0.12$6,000.00$7,150.00$4,000.00$4,000.00$4,400.00
72Lane line, 6" (644E00204)MI0.45$2,500.00$6,050.00$3,300.00$3,300.00$3,700.00
73Center line (644E00300)MI0.46$8,500.00$8,800.00$5,100.00$5,100.00$5,700.00
74Channelizing line, 12" (644E00404)FT3,318$2.50$4.00$2.60$2.60$3.00
75Stop line (644E00500)FT465$8.00$7.50$10.00$10.00$11.00
76Crosswalk line, 12" (644E00620)FT1,241$4.00$4.00$11.00$11.00$12.25
77School symbol marking, 72" (644E01100)EACH2$350.00$880.00$500.00$500.00$550.00
78Lane arrow (644E01300)EACH27$110.00$110.00$120.00$120.00$132.00
79Dotted line, 6" (644E01510)FT92$2.00$3.50$2.00$2.00$2.25
80Bike lane symbol marking (644E01630)EACH11$275.00$330.00$110.00$110.00$121.00
81Conduit, 2", 725.04 (625E25400)FT366$18.00$5.50$18.00$21.00$23.25
82Conduit, 3", 725.04 (625E25500)FT112$50.00$11.00$50.00$32.00$35.25
83Conduit, 4", 725.04 (625E25600)FT101$60.00$11.50$60.00$42.00$46.25
84Conduit, jacked or drilled, 725.04, 2" (625E25902)FT134$35.00$44.00$35.00$43.00$47.50
85Trench (625E29000)FT478$16.00$9.00$16.00$12.00$13.25
86Pull box, 725.08, 18" (625E30700)EACH6$1,000.00$1,300.00$1,000.00$1,050.00$1,155.00
87Pull box, 725.08, 24" (625E30706)EACH4$1,400.00$1,650.00$1,400.00$1,350.00$1,485.00
88Arc flash calculations and label james way, US-23 (625E76000)EACH4$3,650.00$2,200.00$3,650.00$3,450.00$3,800.00
89Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate (632E05006)EACH23$950.00$1,250.00$950.00$1,350.00$1,485.00
90Vehicular signal head, (LED), 4-section, 12" lens, 1-way, polycarbonate (632E05064)EACH2$1,225.00$1,400.00$1,225.00$1,900.00$2,090.00
91Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate (632E05086)EACH11$1,600.00$1,900.00$1,600.00$2,150.00$2,365.00
92Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731)EACH20$625.00$850.00$625.00$850.00$935.00
93Covering of vehicular signal head (632E25000)EACH36$30.00$90.00$30.00$50.00$55.00
94Covering of pedestrian signal head (632E25010)EACH20$30.00$90.00$30.00$40.00$44.00
95Pedestrian pushbutton (632E26000)EACH4$325.00$950.00$325.00$265.00$292.00
96Messenger wire, 7 strand, 1/2" diameter with accessories (632E30400)FT1,518$21.00$5.00$21.00$22.00$24.25
97Tether wire, with accessories (632E30600)FT1,518$23.00$6.00$23.00$22.00$24.25
98Signal cable, 5 conductor, no. 14 AWG (632E40500)FT4,221$3.00$5.00$3.00$3.00$3.50
99Signal cable, 7 conductor, no. 14 AWG (632E40700)FT4,112$3.50$5.00$3.50$5.00$5.50
100Signal cable, 3 conductor, no. 12 AWG (632E42300)FT2,133$2.70$3.50$2.75$4.00$4.50
101Signal support foundation (632E64010)EACH16$10,000$3,800.00$10,000$8,700.00$9,570.00
102Pedestal foundation (632E64020)EACH5$1,000.00$1,300.00$1,000.00$1,350.00$1,485.00
103Test hole performed (632E64950)EACH8$3,000.00$2,200.00$3,000.00$800.00$880.00
104Loop detector lead-in cable (632E65200)FT1,244$2.00$5.50$2.00$2.50$2.75
105Service cable, 3 conductor, no. 6 AWG (632E69800)FT471$7.50$5.50$7.50$9.00$10.00
106Power service (632E70000)EACH4$2,000.00$1,100.00$2,000.00$1,600.00$1,760.00
107Conduit riser, 2" diameter (632E70400)EACH4$500.00$550.00$500.00$650.00$715.00
108Combination strain pole, type TC-81.11, design 12 (632E87140)EACH8$12,000$3,300.00$12,000$13,500$14,850
109Combination strain pole, type TC-81.11, design 13 (632E87150)EACH8$14,000$4,400.00$14,000$15,600$17,160
110Pedestal, 5', transformer base (632E89802)EACH4$850.00$1,980.00$850.00$900.00$990.00
111Removal of traffic signal installation (632E90100)EACH4$5,000.00$10,000$5,000.00$3,500.00$3,850.00
112Cabinet, type TS-2, as per plan (633E65511)EACH4$14,500$13,200$17,500$16,600$18,260
113Cabinet foundation (633E67100)EACH4$5,000.00$2,200.00$5,000.00$3,200.00$3,520.00
114Controller work pad (633E67200)EACH4$3,000.00$660.00$3,000.00$750.00$825.00
115Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001)EACH4$7,000.00$7,700.00$7,000.00$8,700.00$9,570.00
116Ethernet cable, outdoor-rated (809E64550)FT232$3.00$2.50$3.00$3.50$4.00
117ITS device, misc.:2" ITS pull box W/ pad & standar (809E65990)EACH3$3,200.00$440.00$3,200.00$3,425.00$3,768.00
118ITS device, misc.:relocate existing communications (809E65990)EACH4$1,500.00$330.00$1,500.00$850.00$935.00
119Advance radar detection, as per plan (809E69001)EACH8$9,000.00$5,500.00$9,000.00$10,050$11,055
120Stop line radar detection, as per plan (809E69101)EACH12$8,750.00$6,600.00$8,750.00$9,700.00$10,669
121Atc controller, as per plan (809E69123)EACH4$500.00$4,400.00$500.00$1,000.00$1,100.00
122Maintaining ITS during construction (809E70000)LS1$640.00$6,600.00$640.00$28,000$28,000
123Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380)EACH1$2,200.00$2,300.00$2,440.00$2,200.00$2,308.00
124Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384)EACH8$2,300.00$2,400.00$2,480.00$2,250.00$2,418.00
125Barrier reflector, type 1, one way (614E13310)EACH65$13.00$11.00$14.00$15.00$12.00
126Object marker, one way (614E13350)EACH65$17.00$20.00$18.00$18.00$21.00
127Work zone lane line, class I, 6", 642 paint (614E20110)MI0.24$3,500.00$5,500.00$9,800.00$9,800.00$10,800
128Work zone center line, class I, 642 paint (614E21100)MI0.10$16,500$7,700.00$9,800.00$9,800.00$10,800
129Work zone edge line, class I, 4", 642 paint (614E22100)MI0.47$6,400.00$6,600.00$9,800.00$9,800.00$10,800
130Work zone channelizing line, class I, 8", 642 paint (614E23200)FT440$4.00$3.50$1.00$1.00$1.10
131Work zone dotted line, class I, 4", 642 paint (614E24200)FT188$7.00$2.50$0.90$0.90$1.00
132Water (616E10000)MGAL50$100.00$1.50$44.00$15.00$11.00
133Portable barrier, unanchored (622E41100)FT3,234$17.00$20.00$25.00$25.00$26.50
134Concrete barrier, single slope, type C, as per plan (622E10121)FT290$350.00$450.00$545.00$500.00$370.00
135Premium for contract performance bond and for payment bond (103E05000)LS1$11,500$45,000$20,500$20,000$35,000
136Maintaining traffic (614E11000)LS1$66,000$75,000$95,000$190,000$170,000
137Construction layout stakes and surveying (623E10000)LS1$15,900$37,500$20,000$34,500$25,000
138Mobilization (624E10000)LS1$142,000$75,000$140,000$100,000$150,000
200Fence removed for reuse (202E75200)FT20$160.00$20.00$30.00$50.00$55.00
201Paved gutter, type 1-4 (601E38000)FT273$95.00$65.00$80.00$100.00$80.00
202Law enforcement officer with patrol car for assistance (614E11110)HR160$106.00$55.00$130.00$70.00$94.00
ODOT contract 250530: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of December 4, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way