Rietschlin Construction Inc submitted 79 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 07 MAY 2026, and was the low bidder on 6 of them (8%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $12,769,569
- Latest bid
- 07 MAY 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 23 | 0 | 0% |
| 2021 | 25 | 1 | 4% |
| 2022 | 4 | 2 | 50% |
| 2023 | 4 | 1 | 25% |
| 2024 | 8 | 0 | 0% |
| 2025 | 8 | 0 | 0% |
| 2026 | 7 | 2 | 29% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| ASD | 11 | 0 | 0% |
| RIC | 6 | 2 | 33% |
| LIC | 5 | 1 | 20% |
| MED | 5 | 0 | 0% |
| CRA | 4 | 1 | 25% |
| WYA | 4 | 0 | 0% |
| MAR | 4 | 0 | 0% |
| HUR | 3 | 1 | 33% |
| WAY | 3 | 0 | 0% |
| DEL | 3 | 0 | 0% |
| HAN | 2 | 0 | 0% |
| HOL | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 78 | 78 (100%) | $1.00 | $1.00 |
| Water | 659E35000 | MGAL | 76 | 18 (24%) | $10.50 | $1.00 |
| Embankment | 203E20000 | CY | 74 | 18 (24%) | $20.50 | $25.00 |
| Excavation | 203E10000 | CY | 74 | 17 (23%) | $26.00 | $27.00 |
| Subgrade compaction | 204E10000 | SY | 69 | 16 (23%) | $2.50 | $3.00 |
| Water | 616E10000 | MGAL | 34 | 16 (47%) | $11.00 | $20.00 |
| Pavement removed | 202E23000 | SY | 61 | 12 (20%) | $14.00 | $17.00 |
| Soil analysis test | 659E00100 | EACH | 48 | 11 (23%) | $104.00 | $115.50 |
| Topsoil | 659E00300 | CY | 63 | 10 (16%) | $45.00 | $45.00 |
| Field office, type B | 619E16010 | MNTH | 36 | 10 (28%) | $1,487.50 | $2,000.00 |
| Porous backfill with geotextile fabric | 518E21200 | CY | 33 | 10 (30%) | $100.00 | $125.00 |
| Epoxy coated steel reinforcement | 509E10000 | LB | 27 | 10 (37%) | $1.30 | $1.75 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Shelly & Sands Inc | 29 | 20 of 29 |
| Eclipse Co LLC | 27 | 13 of 27 |
| Complete General Construction Company | 22 | 10 of 22 |
| Mosser Construction Inc | 11 | 8 of 11 |
| Miller Bros Const Inc | 11 | 6 of 11 |
| Great Lakes Demolition Company | 11 | 9 of 11 |
| Alan Stone Co Inc | 11 | 6 of 11 |
| R & I Construction Inc | 10 | 6 of 10 |
| Eagle Bridge Co | 10 | 8 of 10 |
| Black Horse Bridge Construction Inc | 10 | 9 of 10 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 07 MAY 2026 | 260240 | HUR | HUR-CR 11-02.96 (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 3 | $3,170,138 | Low, 18% under the second |
| 09 APR 2026 | 260188 | ASD | ASD-SR 60-14.97 (CULVERT REPLACEMENT) | 5 of 5 | $468,359 | +20% |
| 26 MAR 2026 | 260155 | LIC | LIC-CR 803-00.88 (PART 1 AND PART 2) (BIKEWAYS) | 1 of 3 | $2,696,421 | Low, 1.0% under the second |
| 26 MAR 2026 | 260157 | STA | STA-SR 241-14.58 (SRTS) (SIDEWALK) | 4 of 5 | $500,111 | +27% |
| 12 MAR 2026 | 268001 | WYA | WYA-US 30 Rest Areas TP (PARKING AREAS) | 10 of 10 | $4,212,312 | +24% |
| 19 FEB 2026 | 264006 | WAY | WAY-CULVERT FY2026 (CULVERT REPLACEMENT) | 3 of 3 | $1,222,337 | +39% |
| 29 JAN 2026 | 260067 | WAS | WAS-IR 77-09.58 (MISCELLANEOUS) | 3 of 4 | $2,842,742 | +29% |
| 18 DEC 2025 | 254032 | FAI | FAI-US 22-03.68 (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 4 | $1,823,052 | +2.0% |
| 18 DEC 2025 | 254033 | KNO | KNO-SR 3-25.94 (SIDEWALK) | 2 of 3 | $158,025 | +2.0% |
| 04 DEC 2025 | 250530 | MAR | MAR-SR 95-17.90 (at Jamesway) (INTERCHANGE) | 5 of 5 | $3,310,867 | +16% |
| 04 DEC 2025 | 250563 | MED | MED-US 42-09.45 (BRIDGE REPAIR) | 4 of 8 | $827,811 | +4.0% |
| 09 OCT 2025 | 250468 | MAR | MAR-SR 37-08.44 (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 4 | $2,989,969 | +16% |
| 25 SEP 2025 | 250435 | DEL | DEL-SR 315-05.00/06.40/08.10 (SLIDE REPAIR) | 5 of 6 | $4,267,515 | +28% |
| 11 SEP 2025 | 254023 | ASD | ASD-SR 39-05.20 (CULVERT REPLACEMENT) | 2 of 4 | $449,367 | +2.0% |
| 24 APR 2025 | 250237 | DEL | DEL-SR 315 Drainage Improvements (CULVERT REPLACEMENT) | 3 of 5 | $256,443 | +9.0% |
| 22 AUG 2024 | 240404 | MAR | MAR-SR 746-03.641 (CULVERT REPLACEMENT) | 6 of 7 | $201,465 | +44% |
| 08 AUG 2024 | 244018 | TUS | TUS-SR 212-07.84 (CULVERT REPLACEMENT) | 3 of 4 | $575,882 | +14% |
| 25 JUL 2024 | 240373 | COS | COS-CR 12-09.26 Buggy Lane (MINOR WIDENING) | 2 of 4 | $225,514 | +17% |
| 25 JUL 2024 | 240382 | WYA | WYA-US 23-06.63 (INTERSECTION) | 2 of 6 | $324,088 | +15% |
| 11 JUL 2024 | 240366 | WAY | WAY-SR 57-06.73 (CULVERT REPLACEMENT) | 3 of 6 | $309,491 | +11% |
| 13 JUN 2024 | 244016 | LIC | LIC-SR 37-09.63 (CULVERT REPLACEMENT) | 4 of 5 | $738,208 | +15% |
| 22 FEB 2024 | 244007 | MRW | MRW-SR 314-(08.11) (20.62) (CULVERT REPLACEMENT) | 3 of 4 | $1,072,286 | +36% |
| 11 JAN 2024 | 240019 | MAR | MAR-US 23-03.32/03.93, MAR-SR 423-01.60 (INTERSECTION) | 4 of 4 | $1,214,200 | +21% |
| 09 NOV 2023 | 230557 | ERI | ERI-SR 60-07.88 (SPOT SAFETY) | 1 of 3 | $812,157 | Low, 11% under the second |
| 11 MAY 2023 | 230298 | RIC | RIC-SR 603-13.57 (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 2 | $1,076,453 | +2.0% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.