Rietschlin Construction Inc: ODOT bid record

Rietschlin Construction Inc submitted 79 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 07 MAY 2026, and was the low bidder on 6 of them (8%). When it was not low, its total sat a median +14% above the low bid.

Owner
Ohio DOT
Low bid volume
$12,769,569
Latest bid
07 MAY 2026
Data through
12 NOV 2026
79Bids
6Low bids
8Win rate, percent
+14%Median gap to the low bid when not low, 73 bids

By year

YearBidsLow bidsWin rate
20202300%
20212514%
20224250%
20234125%
2024800%
2025800%
20267229%
Rietschlin Construction Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
ASD1100%
RIC6233%
LIC5120%
MED500%
CRA4125%
WYA400%
MAR400%
HUR3133%
WAY300%
DEL300%
HAN200%
HOL200%
Rietschlin Construction Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH7878 (100%)$1.00$1.00
Water659E35000MGAL7618 (24%)$10.50$1.00
Embankment203E20000CY7418 (24%)$20.50$25.00
Excavation203E10000CY7417 (23%)$26.00$27.00
Subgrade compaction204E10000SY6916 (23%)$2.50$3.00
Water616E10000MGAL3416 (47%)$11.00$20.00
Pavement removed202E23000SY6112 (20%)$14.00$17.00
Soil analysis test659E00100EACH4811 (23%)$104.00$115.50
Topsoil659E00300CY6310 (16%)$45.00$45.00
Field office, type B619E16010MNTH3610 (28%)$1,487.50$2,000.00
Porous backfill with geotextile fabric518E21200CY3310 (30%)$100.00$125.00
Epoxy coated steel reinforcement509E10000LB2710 (37%)$1.30$1.75
Rietschlin Construction Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Rietschlin Construction Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
07 MAY 2026260240HURHUR-CR 11-02.96 (BRIDGE REPLACEMENT (1 BRIDGE))1 of 3$3,170,138Low, 18% under the second
09 APR 2026260188ASDASD-SR 60-14.97 (CULVERT REPLACEMENT)5 of 5$468,359+20%
26 MAR 2026260155LICLIC-CR 803-00.88 (PART 1 AND PART 2) (BIKEWAYS)1 of 3$2,696,421Low, 1.0% under the second
26 MAR 2026260157STASTA-SR 241-14.58 (SRTS) (SIDEWALK)4 of 5$500,111+27%
12 MAR 2026268001WYAWYA-US 30 Rest Areas TP (PARKING AREAS)10 of 10$4,212,312+24%
19 FEB 2026264006WAYWAY-CULVERT FY2026 (CULVERT REPLACEMENT)3 of 3$1,222,337+39%
29 JAN 2026260067WASWAS-IR 77-09.58 (MISCELLANEOUS)3 of 4$2,842,742+29%
18 DEC 2025254032FAIFAI-US 22-03.68 (BRIDGE REPLACEMENT (1 BRIDGE))2 of 4$1,823,052+2.0%
18 DEC 2025254033KNOKNO-SR 3-25.94 (SIDEWALK)2 of 3$158,025+2.0%
04 DEC 2025250530MARMAR-SR 95-17.90 (at Jamesway) (INTERCHANGE)5 of 5$3,310,867+16%
04 DEC 2025250563MEDMED-US 42-09.45 (BRIDGE REPAIR)4 of 8$827,811+4.0%
09 OCT 2025250468MARMAR-SR 37-08.44 (BRIDGE REPLACEMENT (1 BRIDGE))2 of 4$2,989,969+16%
25 SEP 2025250435DELDEL-SR 315-05.00/06.40/08.10 (SLIDE REPAIR)5 of 6$4,267,515+28%
11 SEP 2025254023ASDASD-SR 39-05.20 (CULVERT REPLACEMENT)2 of 4$449,367+2.0%
24 APR 2025250237DELDEL-SR 315 Drainage Improvements (CULVERT REPLACEMENT)3 of 5$256,443+9.0%
22 AUG 2024240404MARMAR-SR 746-03.641 (CULVERT REPLACEMENT)6 of 7$201,465+44%
08 AUG 2024244018TUSTUS-SR 212-07.84 (CULVERT REPLACEMENT)3 of 4$575,882+14%
25 JUL 2024240373COSCOS-CR 12-09.26 Buggy Lane (MINOR WIDENING)2 of 4$225,514+17%
25 JUL 2024240382WYAWYA-US 23-06.63 (INTERSECTION)2 of 6$324,088+15%
11 JUL 2024240366WAYWAY-SR 57-06.73 (CULVERT REPLACEMENT)3 of 6$309,491+11%
13 JUN 2024244016LICLIC-SR 37-09.63 (CULVERT REPLACEMENT)4 of 5$738,208+15%
22 FEB 2024244007MRWMRW-SR 314-(08.11) (20.62) (CULVERT REPLACEMENT)3 of 4$1,072,286+36%
11 JAN 2024240019MARMAR-US 23-03.32/03.93, MAR-SR 423-01.60 (INTERSECTION)4 of 4$1,214,200+21%
09 NOV 2023230557ERIERI-SR 60-07.88 (SPOT SAFETY)1 of 3$812,157Low, 11% under the second
11 MAY 2023230298RICRIC-SR 603-13.57 (BRIDGE REPLACEMENT (1 BRIDGE))2 of 2$1,076,453+2.0%
Rietschlin Construction Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy