R & I Construction Inc: ODOT bid record
R & I Construction Inc submitted 40 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 6 of them (15%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $4,499,462
- Latest bid
- 12 NOV 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 14 | 3 | 21% |
| 2021 | 9 | 2 | 22% |
| 2022 | 3 | 0 | 0% |
| 2023 | 4 | 0 | 0% |
| 2024 | 4 | 1 | 25% |
| 2025 | 2 | 0 | 0% |
| 2026 | 4 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| SAN | 4 | 0 | 0% |
| HUR | 3 | 0 | 0% |
| ASD | 3 | 0 | 0% |
| WYA | 3 | 0 | 0% |
| PAU | 3 | 0 | 0% |
| RIC | 3 | 0 | 0% |
| HAN | 2 | 1 | 50% |
| CRA | 2 | 2 | 100% |
| MED | 2 | 0 | 0% |
| VAN | 2 | 0 | 0% |
| OTT | 2 | 0 | 0% |
| HAR | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 41 | 41 (100%) | $1.00 | $1.00 |
| Water | 659E35000 | MGAL | 41 | 35 (85%) | $1.00 | $1.00 |
| Excavation | 203E10000 | CY | 39 | 28 (72%) | $10.00 | $27.00 |
| Aggregate base | 304E20000 | CY | 41 | 27 (66%) | $50.00 | $90.00 |
| Pavement removed | 202E23000 | SY | 33 | 24 (73%) | $7.00 | $17.00 |
| Subgrade compaction | 204E10000 | SY | 40 | 23 (57%) | $1.50 | $3.00 |
| Guardrail removed | 202E38000 | FT | 30 | 23 (77%) | $1.50 | $2.50 |
| 1" preformed expansion joint filler | 516E13600 | SF | 31 | 22 (71%) | $4.00 | $10.00 |
| Lime | 659E31000 | ACRE | 27 | 22 (81%) | $10.00 | $150.00 |
| Special - steel drip strip | 518E22300 | FT | 26 | 22 (85%) | $10.00 | $16.50 |
| Asphalt concrete surface course, type 1, (448), PG64-22 | 441E50000 | CY | 32 | 21 (66%) | $246.50 | $300.00 |
| Repair seeding and mulching | 659E14000 | SY | 29 | 20 (69%) | $1.00 | $1.25 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Miller Bros Const Inc | 25 | 9 of 25 |
| Vernon Nagel Inc | 18 | 8 of 18 |
| Mosser Construction Inc | 17 | 6 of 17 |
| Eagle Bridge Co | 16 | 8 of 16 |
| Great Lakes Demolition Company | 12 | 10 of 12 |
| R G Zachrich Construction Inc | 11 | 6 of 11 |
| Rietschlin Construction Inc | 10 | 4 of 10 |
| Shelly & Sands Inc | 10 | 5 of 10 |
| Complete General Construction Company | 9 | 5 of 9 |
| BCC Ohio Inc | 8 | 6 of 8 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | 260508 | RIC | RIC-SR 13-28.73 (CULVERT REPLACEMENT) | 6 of 8 | $444,288 | +25% |
| 29 OCT 2026 | 260476 | WOO | WOO-SR 281-11.91 Structure Repl (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 7 | $1,003,615 | +5.0% |
| 25 JUN 2026 | 260314 | RIC | RIC-US 42-03.22 (Lexington) (CULVERT REPLACEMENT) | 3 of 3 | $317,951 | +48% |
| 19 FEB 2026 | 260092 | PAU | PAU-TR 33-04.75 (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 3 | $1,169,790 | +3.0% |
| 04 DEC 2025 | 250563 | MED | MED-US 42-09.45 (BRIDGE REPAIR) | 7 of 8 | $933,695 | +17% |
| 25 SEP 2025 | 250445 | WOO | WOO-MR 746-00.05 Pemberville Brdg (BRIDGE REPLACEMENT (1 BRIDGE)) | 5 of 7 | $1,677,592 | +11% |
| 26 SEP 2024 | 240442 | HAR | HAR-SR 81-06.36 (BRIDGE REPLACEMENT (1 BRIDGE)) | 4 of 5 | $1,223,547 | +3.0% |
| 23 MAY 2024 | 240309 | OTT | OTT-SR 51-03.85 (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 6 | $1,299,560 | +14% |
| 09 MAY 2024 | 240285 | UNI | UNI-SR 736-04.06 Part 1 & 2 (BRIDGE REPAIR) | 7 of 7 | $4,102,642 | +12% |
| 11 JAN 2024 | 240006 | CHP | CHP-SR 29-31.24 (BRIDGE REPAIR) | 1 of 2 | $763,960 | Low, 16% under the second |
| 12 OCT 2023 | 230483 | ASD | ASD-US 42-12.46 (BRIDGE REPAIR) | 4 of 4 | $1,300,403 | +34% |
| 28 SEP 2023 | 230479 | RIC | RIC-SR 96-16.58 (BRIDGE REPLACEMENT (1 BRIDGE)) | 7 of 8 | $2,817,504 | +20% |
| 11 MAY 2023 | 230304 | WYA | WYA-SR 67-24.06 (CULVERT REPLACEMENT) | 2 of 3 | $370,224 | +26% |
| 13 APR 2023 | 238001 | HAR | HAR-CR 75-18.00 (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 3 | $1,333,917 | +4.0% |
| 17 NOV 2022 | 220613 | MAR | MAR-SR 95-22.64 (BRIDGE REPAIR) | 5 of 5 | $2,036,481 | +36% |
| 29 SEP 2022 | 220522 | HUR | HUR-SR 547-07.25 (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 5 | $1,143,028 | +23% |
| 12 MAY 2022 | 220327 | OTT | OTT-SR 105-04.90 Clvt replace (CULVERT REPLACEMENT) | 3 of 3 | $289,209 | +42% |
| 16 DEC 2021 | 210669 | VAN | VAN-SR 49-05.24 (BRIDGE REPLACEMENT (1 BRIDGE)) | 7 of 7 | $1,073,897 | +16% |
| 14 OCT 2021 | 210550 | SAN | SAN-SR 19-15.31/17.15 Rehab (BRIDGE REPAIR) | 2 of 5 | $1,681,213 | +13% |
| 27 MAY 2021 | 210336 | CRA | CRA-SR 100-22.23 (BRIDGE REPAIR) | 1 of 9 | $748,431 | Low, 4.0% under the second |
| 15 APR 2021 | 210243 | SEN | SEN-SR 19/SR 101-09.96/11.82/10.15 Stru (PART 1 AND PART 2) (CULVERT REPLACEMENT) | 8 of 8 | $1,038,164 | +24% |
| 01 APR 2021 | 210211 | SAN | SAN-US 6-23.58 Str Rplmnt (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 6 | $635,961 | +17% |
| 11 MAR 2021 | 218001 | ALL | ALL-US 30-14.93 (BRIDGE REPAIR) | 6 of 6 | $692,888 | +40% |
| 11 FEB 2021 | 210090 | HUR | HUR-CULVERT FY2021 (CULVERT REPLACEMENT) | 5 of 6 | $642,449 | +53% |
| 14 JAN 2021 | 210003 | ASD | ASD-SR 302-09.34 (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 12 | $749,475 | +6.0% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.