R & I Construction Inc: ODOT bid record

R & I Construction Inc submitted 40 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 6 of them (15%). When it was not low, its total sat a median +14% above the low bid.

Owner
Ohio DOT
Low bid volume
$4,499,462
Latest bid
12 NOV 2026
Data through
12 NOV 2026
40Bids
6Low bids
15Win rate, percent
+14%Median gap to the low bid when not low, 34 bids

By year

YearBidsLow bidsWin rate
202014321%
20219222%
2022300%
2023400%
20244125%
2025200%
2026400%
R & I Construction Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
SAN400%
HUR300%
ASD300%
WYA300%
PAU300%
RIC300%
HAN2150%
CRA22100%
MED200%
VAN200%
OTT200%
HAR200%
R & I Construction Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH4141 (100%)$1.00$1.00
Water659E35000MGAL4135 (85%)$1.00$1.00
Excavation203E10000CY3928 (72%)$10.00$27.00
Aggregate base304E20000CY4127 (66%)$50.00$90.00
Pavement removed202E23000SY3324 (73%)$7.00$17.00
Subgrade compaction204E10000SY4023 (57%)$1.50$3.00
Guardrail removed202E38000FT3023 (77%)$1.50$2.50
1" preformed expansion joint filler516E13600SF3122 (71%)$4.00$10.00
Lime659E31000ACRE2722 (81%)$10.00$150.00
Special - steel drip strip518E22300FT2622 (85%)$10.00$16.50
Asphalt concrete surface course, type 1, (448), PG64-22441E50000CY3221 (66%)$246.50$300.00
Repair seeding and mulching659E14000SY2920 (69%)$1.00$1.25
R & I Construction Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

R & I Construction Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
12 NOV 2026260508RICRIC-SR 13-28.73 (CULVERT REPLACEMENT)6 of 8$444,288+25%
29 OCT 2026260476WOOWOO-SR 281-11.91 Structure Repl (BRIDGE REPLACEMENT (1 BRIDGE))2 of 7$1,003,615+5.0%
25 JUN 2026260314RICRIC-US 42-03.22 (Lexington) (CULVERT REPLACEMENT)3 of 3$317,951+48%
19 FEB 2026260092PAUPAU-TR 33-04.75 (BRIDGE REPLACEMENT (1 BRIDGE))2 of 3$1,169,790+3.0%
04 DEC 2025250563MEDMED-US 42-09.45 (BRIDGE REPAIR)7 of 8$933,695+17%
25 SEP 2025250445WOOWOO-MR 746-00.05 Pemberville Brdg (BRIDGE REPLACEMENT (1 BRIDGE))5 of 7$1,677,592+11%
26 SEP 2024240442HARHAR-SR 81-06.36 (BRIDGE REPLACEMENT (1 BRIDGE))4 of 5$1,223,547+3.0%
23 MAY 2024240309OTTOTT-SR 51-03.85 (BRIDGE REPLACEMENT (1 BRIDGE))2 of 6$1,299,560+14%
09 MAY 2024240285UNIUNI-SR 736-04.06 Part 1 & 2 (BRIDGE REPAIR)7 of 7$4,102,642+12%
11 JAN 2024240006CHPCHP-SR 29-31.24 (BRIDGE REPAIR)1 of 2$763,960Low, 16% under the second
12 OCT 2023230483ASDASD-US 42-12.46 (BRIDGE REPAIR)4 of 4$1,300,403+34%
28 SEP 2023230479RICRIC-SR 96-16.58 (BRIDGE REPLACEMENT (1 BRIDGE))7 of 8$2,817,504+20%
11 MAY 2023230304WYAWYA-SR 67-24.06 (CULVERT REPLACEMENT)2 of 3$370,224+26%
13 APR 2023238001HARHAR-CR 75-18.00 (BRIDGE REPLACEMENT (1 BRIDGE))3 of 3$1,333,917+4.0%
17 NOV 2022220613MARMAR-SR 95-22.64 (BRIDGE REPAIR)5 of 5$2,036,481+36%
29 SEP 2022220522HURHUR-SR 547-07.25 (BRIDGE REPLACEMENT (1 BRIDGE))3 of 5$1,143,028+23%
12 MAY 2022220327OTTOTT-SR 105-04.90 Clvt replace (CULVERT REPLACEMENT)3 of 3$289,209+42%
16 DEC 2021210669VANVAN-SR 49-05.24 (BRIDGE REPLACEMENT (1 BRIDGE))7 of 7$1,073,897+16%
14 OCT 2021210550SANSAN-SR 19-15.31/17.15 Rehab (BRIDGE REPAIR)2 of 5$1,681,213+13%
27 MAY 2021210336CRACRA-SR 100-22.23 (BRIDGE REPAIR)1 of 9$748,431Low, 4.0% under the second
15 APR 2021210243SENSEN-SR 19/SR 101-09.96/11.82/10.15 Stru (PART 1 AND PART 2) (CULVERT REPLACEMENT)8 of 8$1,038,164+24%
01 APR 2021210211SANSAN-US 6-23.58 Str Rplmnt (BRIDGE REPLACEMENT (1 BRIDGE))2 of 6$635,961+17%
11 MAR 2021218001ALLALL-US 30-14.93 (BRIDGE REPAIR)6 of 6$692,888+40%
11 FEB 2021210090HURHUR-CULVERT FY2021 (CULVERT REPLACEMENT)5 of 6$642,449+53%
14 JAN 2021210003ASDASD-SR 302-09.34 (BRIDGE REPLACEMENT (1 BRIDGE))2 of 12$749,475+6.0%
R & I Construction Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.