ODOT contract 250563 bid tabulation
MED-US 42-09.45 (BRIDGE REPAIR). Let by Ohio DOT on December 4, 2025, MED. 8 bids received; low bid $796,377 by V O Menuez & Son Inc, -17% against the engineer's estimate of $958,000.
- Owner
- Ohio DOT
- Letting
- 04 DEC 2025
- Pay items
- 69
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | V O Menuez & Son Inc | $796,377 | Low | -17% |
| 2 | BCC Ohio Inc | $806,250 | +1.0% | -16% |
| 3 | Black Horse Bridge Construction Inc | $818,448 | +3.0% | -15% |
| 4 | Rietschlin Construction Inc | $827,811 | +4.0% | -14% |
| 5 | Catts Construction Inc | $886,683 | +11% | -7.0% |
| 6 | Ohio Concrete Maintenance LLC | $914,826 | +15% | -5.0% |
| 7 | R & I Construction Inc | $933,695 | +17% | -3.0% |
| 8 | J D Williamson Construction Co Inc | $1,099,746 | +38% | +15% |
Engineer's estimate: $958,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. V O Menuez & Son Inc | 2. BCC Ohio Inc | 3. Black Horse Bridge Construction Inc | 4. Rietschlin Construction Inc | 5. Catts Construction Inc | 6. Ohio Concrete Maintenance LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $5,067.00 | $2,064.00 | $5,400.00 | $5,000.00 | $7,590.00 | $5,000.00 |
| 2 | Pavement removed (202E23000) | SY | 1,226 | $2.70 | $8.22 | $4.50 | $9.00 | $16.00 | $30.00 |
| 3 | Guardrail removed (202E38000) | FT | 200 | $3.20 | $2.10 | $2.00 | $6.00 | $2.50 | $4.00 |
| 4 | Anchor assembly removed, type T (202E42040) | EACH | 1 | $100.00 | $9.75 | $95.00 | $475.00 | $181.25 | $120.00 |
| 5 | Anchor assembly removed, type B (202E42050) | EACH | 3 | $100.00 | $131.25 | $125.00 | $475.00 | $181.25 | $160.00 |
| 6 | Bridge terminal assembly removed (202E47000) | EACH | 4 | $51.00 | $78.75 | $75.00 | $475.00 | $212.00 | $80.00 |
| 7 | Mailbox removed (202E53100) | EACH | 2 | $50.00 | $36.75 | $35.00 | $160.00 | $87.00 | $200.00 |
| 8 | Excavation (203E10000) | CY | 180 | $39.08 | $19.35 | $24.00 | $42.00 | $33.00 | $100.00 |
| 9 | Embankment (203E20000) | CY | 144 | $39.08 | $19.35 | $19.00 | $42.00 | $39.00 | $90.00 |
| 10 | Subgrade compaction (204E10000) | SY | 1,430 | $1.00 | $2.58 | $3.00 | $3.00 | $0.60 | $7.00 |
| 11 | Guardrail, type MGS (606E15050) | FT | 250 | $22.58 | $20.79 | $19.80 | $23.50 | $26.00 | $23.00 |
| 12 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 2 | $2,704.00 | $2,677.50 | $2,550.00 | $2,860.00 | $3,115.00 | $2,800.00 |
| 13 | Anchor assembly, MGS type T (606E26550) | EACH | 2 | $1,260.00 | $1,428.00 | $1,360.00 | $1,320.00 | $1,451.50 | $1,500.00 |
| 14 | MGS bridge terminal assembly, type TST-2 (606E34600) | EACH | 4 | $2,415.00 | $2,572.50 | $2,450.00 | $2,750.00 | $2,782.00 | $2,750.00 |
| 15 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $1,320.00 | $2,406.00 | $1,500.00 | $1,320.00 | $1,452.00 | $3,500.00 |
| 16 | Special - mailbox support system, single (690E50100) | EACH | 2 | $270.00 | $241.50 | $230.00 | $165.00 | $295.00 | $500.00 |
| 17 | Rock channel protection, type C without filter, as per plan (601E34201) | CY | 98 | $117.68 | $179.78 | $145.00 | $120.00 | $93.25 | $135.00 |
| 18 | Commercial fertilizer (654E11000) | TON | 0.10 | $902.00 | $703.50 | $1,500.00 | $1,250.00 | $1.00 | $1,000.00 |
| 19 | Soil analysis test (659E00100) | EACH | 2 | $148.50 | $106.58 | $400.00 | $150.00 | $1.00 | $500.00 |
| 20 | Topsoil (659E00300) | CY | 73 | $35.40 | $63.30 | $80.00 | $55.00 | $65.75 | $75.00 |
| 21 | Seeding and mulching (659E10000) | SY | 652 | $9.46 | $5.20 | $2.50 | $7.00 | $3.00 | $5.00 |
| 22 | Repair seeding and mulching (659E14000) | SY | 33 | $0.80 | $1.16 | $3.00 | $7.00 | $0.10 | $10.00 |
| 23 | Inter-seeding (659E15000) | SY | 33 | $0.80 | $0.11 | $1.00 | $7.00 | $1.00 | $10.00 |
| 24 | Lime (659E31000) | ACRE | 0.14 | $167.07 | $52.50 | $50.00 | $150.00 | $105.00 | $1,000.00 |
| 25 | Water (659E35000) | MGAL | 4 | $1.00 | $10.50 | $1.00 | $22.00 | $1.00 | $10.00 |
| 26 | Erosion control (832E30000) | EACH | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 27 | Aggregate drains (605E31100) | FT | 127 | $8.70 | $14.01 | $18.00 | $18.00 | $26.00 | $40.00 |
| 28 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 222 | $233.10 | $220.50 | $210.00 | $231.00 | $268.50 | $230.00 |
| 29 | Aggregate base (304E20000) | CY | 286 | $87.30 | $136.85 | $105.00 | $112.00 | $79.00 | $60.00 |
| 30 | Tack coat (407E10000) | GAL | 184 | $2.63 | $2.10 | $2.00 | $2.25 | $3.00 | $2.25 |
| 31 | Prime coat, as per plan (408E10001) | GAL | 85 | $5.25 | $4.20 | $4.00 | $4.50 | $6.00 | $4.50 |
| 32 | Asphalt concrete surface course, 9.5 MM, type A (4 (442E22001) | CY | 44 | $472.50 | $434.70 | $414.00 | $456.00 | $544.00 | $450.00 |
| 33 | Asphalt concrete intermediate course, 9.5 MM, type A (449), as per plan (442E22201) | CY | 43 | $472.50 | $345.45 | $329.00 | $362.00 | $544.00 | $375.00 |
| 34 | Raised pavement marker removed (621E54000) | EACH | 4 | $50.35 | $20.64 | $100.00 | $70.00 | $100.00 | $50.00 |
| 35 | Barrier reflector, type 1 (BI-directional) (626E00102) | EACH | 8 | $14.30 | $13.13 | $12.50 | $11.00 | $24.00 | $15.00 |
| 36 | Ground mounted support, no. 3 post (630E03100) | FT | 10 | $23.60 | $31.50 | $30.00 | $33.00 | $37.00 | $35.00 |
| 37 | Removal of ground mounted sign and reerection (630E85100) | EACH | 1 | $121.00 | $73.50 | $70.00 | $110.00 | $79.00 | $80.00 |
| 38 | Removal of ground mounted post support and disposal (630E86002) | EACH | 1 | $1.00 | $26.25 | $25.00 | $30.00 | $79.00 | $40.00 |
| 39 | Edge line, 6" (646E10010) | MI | 0.14 | $13,750 | $13,125 | $12,500 | $27,500 | $15,120 | $28,500 |
| 40 | Center line (646E10200) | MI | 0.07 | $27,500 | $26,250 | $25,000 | $38,500 | $30,240 | $40,000 |
| 41 | Detour signing (614E12420) | LS | 1 | $7,305.00 | $6,825.00 | $8,770.00 | $18,700 | $8,500.00 | $20,000 |
| 42 | Portable changeable message sign, as per plan (614E18601) | SNMT | 2 | $2,026.00 | $840.00 | $1,750.00 | $1,650.00 | $905.00 | $1,600.00 |
| 43 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $87,307 | $41,991 | $69,300 | $45,000 | $46,000 | $52,000 |
| 44 | Approach slab removed, as per plan (202E22901) | SY | 245 | $20.80 | $99.96 | $140.00 | $96.00 | $30.00 | $60.00 |
| 45 | Wearing course removed (202E23500) | SY | 448 | $5.22 | $3.88 | $9.00 | $8.00 | $11.00 | $34.00 |
| 46 | Epoxy coated reinforcing steel, as per plan (509E10001) | LB | 5,874 | $1.45 | $1.85 | $2.00 | $1.75 | $2.25 | $2.50 |
| 47 | Concrete reinforcement, replacement of existing concrete reinforcement, as per plan (509E20001) | LB | 101 | $4.94 | $1.83 | $12.00 | $4.00 | $1.00 | $6.00 |
| 48 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 6 | $42.10 | $312.45 | $85.00 | $65.00 | $26.00 | $200.00 |
| 49 | Class QC2 concrete, superstructure (511E31610) | CY | 38 | $1,132.00 | $1,311.21 | $1,650.00 | $1,800.00 | $1,826.00 | $1,400.00 |
| 50 | Class QC1 concrete, abutment (511E45710) | CY | 4 | $5,413.00 | $1,440.00 | $1,150.00 | $1,700.00 | $3,140.00 | $2,200.00 |
| 51 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 74 | $31.35 | $42.24 | $50.00 | $61.00 | $39.00 | $50.00 |
| 52 | Type B waterproofing (512E44400) | SY | 16 | $55.70 | $104.70 | $150.00 | $140.00 | $25.00 | $210.00 |
| 53 | Prestressed concrete composite box beam bridge members, level 1, CB17-48 (515E12030) | EACH | 11 | $14,708 | $14,305 | $15,000 | $13,300 | $16,500 | $15,000 |
| 54 | 1" preformed expansion joint filler (516E13600) | SF | 204 | $4.16 | $9.45 | $14.00 | $10.00 | $7.00 | $10.00 |
| 55 | 2" deep joint sealer (516E31010) | FT | 102 | $7.40 | $20.71 | $12.00 | $33.00 | $8.00 | $10.00 |
| 56 | 1/8" preformed bearing pad, type CDP (516E41100) | EACH | 44 | $45.90 | $63.90 | $43.00 | $98.00 | $30.00 | $124.00 |
| 57 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44001) | EACH | 22 | $661.00 | $501.30 | $575.00 | $404.00 | $588.00 | $800.00 |
| 58 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44001) | EACH | 22 | $539.00 | $501.30 | $475.00 | $404.00 | $588.00 | $675.00 |
| 59 | Railing (three steel tube bridge railing) (517E70100) | FT | 96 | $473.30 | $483.00 | $500.00 | $484.00 | $544.00 | $510.00 |
| 60 | Special - steel drip strip (518E22300) | FT | 100 | $22.90 | $30.21 | $23.00 | $19.00 | $28.00 | $31.00 |
| 61 | Patching concrete structure, as per plan (519E11101) | SF | 136 | $62.00 | $149.13 | $150.00 | $115.00 | $165.00 | $125.00 |
| 62 | Reinforced concrete approach slabs (T=13"), as per plan (526E15001) | SY | 196 | $276.60 | $461.01 | $380.00 | $320.00 | $400.00 | $420.00 |
| 63 | Type A installation (526E90010) | FT | 102 | $137.46 | $264.56 | $208.00 | $190.00 | $115.00 | $160.00 |
| 64 | Structure grounding system, as per plan (625E33001) | EACH | 1 | $4,601.00 | $9,960.00 | $10,500 | $10,500 | $11,490 | $10,250 |
| 65 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $9,511.00 | $9,960.37 | $7,500.00 | $10,000 | $9,300.00 | $17,000 |
| 66 | Maintaining traffic (614E11000) | LS | 1 | $3,250.00 | $2,838.00 | $3,000.00 | $2,000.00 | $8,100.00 | $10,000 |
| 67 | Field office, type C (619E16020) | MNTH | 6 | $3,767.50 | $4,417.00 | $1,000.00 | $1,650.00 | $2,000.00 | $500.00 |
| 68 | Construction layout stakes and surveying (623E10000) | LS | 1 | $3,918.00 | $3,180.00 | $12,000 | $6,500.00 | $11,100 | $5,000.00 |
| 69 | Mobilization (624E10000) | LS | 1 | $54,000 | $20,723 | $20,000 | $60,000 | $58,000 | $44,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of December 4, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.