J D Williamson Construction Co Inc: ODOT bid record

J D Williamson Construction Co Inc submitted 66 bids on Ohio DOT contracts in the data, from 13 FEB 2020 to 12 NOV 2026, and was the low bidder on 22 of them (33%). When it was not low, its total sat a median +11% above the low bid.

Owner
Ohio DOT
Low bid volume
$85,298,289
Latest bid
12 NOV 2026
Data through
12 NOV 2026
66Bids
22Low bids
33Win rate, percent
+11%Median gap to the low bid when not low, 44 bids

By year

YearBidsLow bidsWin rate
202019632%
202111327%
20228225%
20237343%
20242150%
202511327%
20268450%
J D Williamson Construction Co Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
CUY13538%
LAK13754%
MED6233%
SUM5120%
STA4125%
POR300%
WAS200%
MAD2150%
GEA2150%
MAH2150%
CAR200%
ATB100%
J D Williamson Construction Co Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH6767 (100%)$1.00$1.00
Water616E10000MGAL4444 (100%)$5.00$20.00
Porous backfill with geotextile fabric518E21200CY7132 (45%)$90.00$125.00
Water659E35000MGAL6231 (50%)$1.00$1.00
Excavation203E10000CY6230 (48%)$22.25$27.00
Lime659E31000ACRE5630 (54%)$30.00$150.00
1" preformed expansion joint filler516E13600SF5928 (47%)$6.00$10.00
Type 2 waterproofing512E33000SY4926 (53%)$25.00$30.00
Sealing of concrete surfaces (epoxy-urethane)512E10100SY6725 (37%)$24.00$34.00
Aggregate base304E20000CY5825 (43%)$90.00$90.00
Embankment203E20000CY6023 (38%)$20.00$25.00
Guardrail removed202E38000FT5623 (41%)$2.00$2.50
J D Williamson Construction Co Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

J D Williamson Construction Co Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
12 NOV 2026260501GEAGEA-SR 87-03.18 Replace (BRIDGE REPLACEMENT (1 BRIDGE))1 of 4$2,236,334Low, 16% under the second
12 NOV 2026260512TRUTRU-SR 534-22.36/26.04 (BRIDGE REPAIR)3 of 5$1,844,671+14%
12 NOV 2026264030CUYCUY-SR 43-04.80 Replace (BRIDGE REPLACEMENT (1 BRIDGE))1 of 4$1,494,618Low, 26% under the second
13 AUG 2026260345CUYCUY-SR 17-13.50 Replace (BRIDGE REPLACEMENT (1 BRIDGE))3 of 4$9,977,044+7.0%
13 AUG 2026260363HASHAS-Bridge St Bridge Replacement (BRIDGE REPLACEMENT (1 BRIDGE))1 of 5$2,087,391Low, 14% under the second
13 AUG 2026260371SUMSUM-SR 21-01.07 (BRIDGE REPAIR)1 of 9$1,872,704Low, 7.0% under the second
09 APR 2026260183STASTA-Sippo Valley Trail Bridge 8 (BRIDGE REPLACEMENT (1 BRIDGE))3 of 5$798,548+7.0%
19 FEB 2026260096SUMSUM-IR 277-03.73 (BRIDGE REPAIR)3 of 4$16,096,593+4.0%
04 DEC 2025250563MEDMED-US 42-09.45 (BRIDGE REPAIR)8 of 8$1,099,746+38%
23 OCT 2025250500LAKLAK-US 6-02.06 Super (BRIDGE REPAIR)1 of 3$7,000,047Low, 6.0% under the second
09 OCT 2025250467MAHMAH-US 422-03.13 (BRIDGE REPAIR)3 of 4$2,695,318+29%
25 SEP 2025250441PORPOR-SR 305-02.43/02.58 (BRIDGE REPAIR)9 of 9$1,500,251+24%
11 SEP 2025250413LAKLAK-IR 90-11.51 Deck (BRIDGE REPAIR)3 of 3$2,921,083+17%
28 AUG 2025254022LAKLAK-SR 283-04.58 Replace (BRIDGE REPLACEMENT (1 BRIDGE))2 of 2$1,783,552+2.0%
14 AUG 2025250380LAKLAK-SR 283-14.34 Deck (BRIDGE REPAIR)1 of 5$4,709,801Low, 6.0% under the second
17 JUL 2025250344District 4D04-BH FY2026 (BRIDGE REPAIR)4 of 4$1,696,529+44%
12 JUN 2025250317MEDMED-US 42-03.10 L Reconstr. (BRIDGE REPAIR)1 of 4$875,141Low, 15% under the second
24 APR 2025250227STASTA-Minerva Bridge (BIKEWAYS)3 of 3$772,162+5.0%
30 JAN 2025250064SUMSUM-IR 480-07.45 (BRIDGE REPAIR)2 of 2$9,999,387+36%
26 SEP 2024240416CUYCUY-IR 77-04.79/Wallings Road (INTERCHANGE)1 of 5$8,035,650Low, 1.0% under the second
23 MAY 2024240306LAKLAK-SR 91-04.23/04.49 (BRIDGE REPLACEMENT (2 BRIDGES))2 of 4$16,256,748+5.0%
12 OCT 2023230494LAKLAK-SR 2-16.77 Super (BRIDGE REPAIR)1 of 3$2,399,802Low, 6.0% under the second
28 SEP 2023230479RICRIC-SR 96-16.58 (BRIDGE REPLACEMENT (1 BRIDGE))5 of 8$2,619,536+11%
14 SEP 2023230438SUMSUM-IR 271-01.51 (BRIDGE REPAIR)2 of 5$1,879,815+9.0%
10 AUG 2023230404MEDMED-SR 18-01.72/01.93/02.42 (BRIDGE REPLACEMENT (3 BRIDGES))1 of 5$4,023,006Low, 0.0% under the second
J D Williamson Construction Co Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy