J D Williamson Construction Co Inc: ODOT bid record
J D Williamson Construction Co Inc submitted 66 bids on Ohio DOT contracts in the data, from 13 FEB 2020 to 12 NOV 2026, and was the low bidder on 22 of them (33%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $85,298,289
- Latest bid
- 12 NOV 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 19 | 6 | 32% |
| 2021 | 11 | 3 | 27% |
| 2022 | 8 | 2 | 25% |
| 2023 | 7 | 3 | 43% |
| 2024 | 2 | 1 | 50% |
| 2025 | 11 | 3 | 27% |
| 2026 | 8 | 4 | 50% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| CUY | 13 | 5 | 38% |
| LAK | 13 | 7 | 54% |
| MED | 6 | 2 | 33% |
| SUM | 5 | 1 | 20% |
| STA | 4 | 1 | 25% |
| POR | 3 | 0 | 0% |
| WAS | 2 | 0 | 0% |
| MAD | 2 | 1 | 50% |
| GEA | 2 | 1 | 50% |
| MAH | 2 | 1 | 50% |
| CAR | 2 | 0 | 0% |
| ATB | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 67 | 67 (100%) | $1.00 | $1.00 |
| Water | 616E10000 | MGAL | 44 | 44 (100%) | $5.00 | $20.00 |
| Porous backfill with geotextile fabric | 518E21200 | CY | 71 | 32 (45%) | $90.00 | $125.00 |
| Water | 659E35000 | MGAL | 62 | 31 (50%) | $1.00 | $1.00 |
| Excavation | 203E10000 | CY | 62 | 30 (48%) | $22.25 | $27.00 |
| Lime | 659E31000 | ACRE | 56 | 30 (54%) | $30.00 | $150.00 |
| 1" preformed expansion joint filler | 516E13600 | SF | 59 | 28 (47%) | $6.00 | $10.00 |
| Type 2 waterproofing | 512E33000 | SY | 49 | 26 (53%) | $25.00 | $30.00 |
| Sealing of concrete surfaces (epoxy-urethane) | 512E10100 | SY | 67 | 25 (37%) | $24.00 | $34.00 |
| Aggregate base | 304E20000 | CY | 58 | 25 (43%) | $90.00 | $90.00 |
| Embankment | 203E20000 | CY | 60 | 23 (38%) | $20.00 | $25.00 |
| Guardrail removed | 202E38000 | FT | 56 | 23 (41%) | $2.00 | $2.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Ruhlin Company | 40 | 17 of 40 |
| Great Lakes Construction Co | 37 | 10 of 37 |
| Shelly & Sands Inc | 32 | 12 of 32 |
| Black Horse Bridge Construction Inc | 13 | 9 of 13 |
| Beaver Excavating Company | 13 | 5 of 13 |
| Marucci & Gaffney Excavating Co | 11 | 8 of 11 |
| Stanley Miller Construction Company | 9 | 5 of 9 |
| Kokosing Construction Company Inc | 9 | 4 of 9 |
| Union Industrial Contractors Inc | 8 | 0 of 8 |
| Perk Company Inc | 8 | 4 of 8 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | 260501 | GEA | GEA-SR 87-03.18 Replace (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 4 | $2,236,334 | Low, 16% under the second |
| 12 NOV 2026 | 260512 | TRU | TRU-SR 534-22.36/26.04 (BRIDGE REPAIR) | 3 of 5 | $1,844,671 | +14% |
| 12 NOV 2026 | 264030 | CUY | CUY-SR 43-04.80 Replace (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 4 | $1,494,618 | Low, 26% under the second |
| 13 AUG 2026 | 260345 | CUY | CUY-SR 17-13.50 Replace (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 4 | $9,977,044 | +7.0% |
| 13 AUG 2026 | 260363 | HAS | HAS-Bridge St Bridge Replacement (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 5 | $2,087,391 | Low, 14% under the second |
| 13 AUG 2026 | 260371 | SUM | SUM-SR 21-01.07 (BRIDGE REPAIR) | 1 of 9 | $1,872,704 | Low, 7.0% under the second |
| 09 APR 2026 | 260183 | STA | STA-Sippo Valley Trail Bridge 8 (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 5 | $798,548 | +7.0% |
| 19 FEB 2026 | 260096 | SUM | SUM-IR 277-03.73 (BRIDGE REPAIR) | 3 of 4 | $16,096,593 | +4.0% |
| 04 DEC 2025 | 250563 | MED | MED-US 42-09.45 (BRIDGE REPAIR) | 8 of 8 | $1,099,746 | +38% |
| 23 OCT 2025 | 250500 | LAK | LAK-US 6-02.06 Super (BRIDGE REPAIR) | 1 of 3 | $7,000,047 | Low, 6.0% under the second |
| 09 OCT 2025 | 250467 | MAH | MAH-US 422-03.13 (BRIDGE REPAIR) | 3 of 4 | $2,695,318 | +29% |
| 25 SEP 2025 | 250441 | POR | POR-SR 305-02.43/02.58 (BRIDGE REPAIR) | 9 of 9 | $1,500,251 | +24% |
| 11 SEP 2025 | 250413 | LAK | LAK-IR 90-11.51 Deck (BRIDGE REPAIR) | 3 of 3 | $2,921,083 | +17% |
| 28 AUG 2025 | 254022 | LAK | LAK-SR 283-04.58 Replace (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 2 | $1,783,552 | +2.0% |
| 14 AUG 2025 | 250380 | LAK | LAK-SR 283-14.34 Deck (BRIDGE REPAIR) | 1 of 5 | $4,709,801 | Low, 6.0% under the second |
| 17 JUL 2025 | 250344 | District 4 | D04-BH FY2026 (BRIDGE REPAIR) | 4 of 4 | $1,696,529 | +44% |
| 12 JUN 2025 | 250317 | MED | MED-US 42-03.10 L Reconstr. (BRIDGE REPAIR) | 1 of 4 | $875,141 | Low, 15% under the second |
| 24 APR 2025 | 250227 | STA | STA-Minerva Bridge (BIKEWAYS) | 3 of 3 | $772,162 | +5.0% |
| 30 JAN 2025 | 250064 | SUM | SUM-IR 480-07.45 (BRIDGE REPAIR) | 2 of 2 | $9,999,387 | +36% |
| 26 SEP 2024 | 240416 | CUY | CUY-IR 77-04.79/Wallings Road (INTERCHANGE) | 1 of 5 | $8,035,650 | Low, 1.0% under the second |
| 23 MAY 2024 | 240306 | LAK | LAK-SR 91-04.23/04.49 (BRIDGE REPLACEMENT (2 BRIDGES)) | 2 of 4 | $16,256,748 | +5.0% |
| 12 OCT 2023 | 230494 | LAK | LAK-SR 2-16.77 Super (BRIDGE REPAIR) | 1 of 3 | $2,399,802 | Low, 6.0% under the second |
| 28 SEP 2023 | 230479 | RIC | RIC-SR 96-16.58 (BRIDGE REPLACEMENT (1 BRIDGE)) | 5 of 8 | $2,619,536 | +11% |
| 14 SEP 2023 | 230438 | SUM | SUM-IR 271-01.51 (BRIDGE REPAIR) | 2 of 5 | $1,879,815 | +9.0% |
| 10 AUG 2023 | 230404 | MED | MED-SR 18-01.72/01.93/02.42 (BRIDGE REPLACEMENT (3 BRIDGES)) | 1 of 5 | $4,023,006 | Low, 0.0% under the second |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.