ODOT letting results, October 12, 2023
25 contracts let by Ohio DOT on October 12, 2023, $78,298,570 in low bids, a median of 3 bidders per contract. On the 25 with an engineer's estimate, the low bid came in under it 9 times; median low bid +2.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 25
- Low bids, total
- $78,298,570
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 230457 | CLE-SR 32-02.33 (PART 1) (INTERCHANGE) | CLE | 3 | Sunesis Construction Co | $30,046,957 | $30,160,468 | 0.0% | +3.0% | ODOT |
| 230484 | ATB-SR 11-22.16 (FOUR LANE RESURFACING) | ATB | 3 | Karvo Companies Inc | $13,138,190 | $13,648,000 | +4.0% | +9.0% | ODOT |
| 230495 | LOR-SR 2-07.97 (FOUR LANE RESURFACING) | LOR | 2 | Karvo Companies Inc | $5,008,000 | $5,586,993 | +12% | -4.0% | ODOT |
| 230502 | WAS-US 50-03.58 (FOUR LANE RESURFACING) | WAS | 1 | Shelly & Sands Inc | $3,813,894 | +3.0% | ODOT | ||
| 230492 | HOL-/WAY-SR 83/VAR-14.70/VAR (TWO LANE RESURFACING) | HOL | 4 | Melway Paving Co Inc | $2,547,223 | $2,777,744 | +9.0% | -9.0% | ODOT |
| 230494 | LAK-SR 2-16.77 Super (BRIDGE REPAIR) | LAK | 3 | J D Williamson Construction Co Inc | $2,399,802 | $2,550,647 | +6.0% | +5.0% | ODOT |
| 230496 | MOT-IR 70-06.03 (BRIDGE REPAIR) | MOT | 3 | Eagle Bridge Co | $2,395,956 | $2,423,315 | +1.0% | +2.0% | ODOT |
| 230500 | VAN-US 224-16.08 (TWO LANE RESURFACING) | VAN | 2 | Shelly Company | $2,381,403 | $2,459,169 | +3.0% | +2.0% | ODOT |
| 230493 | HUR-SR 547-00.00 (TWO LANE RESURFACING) | HUR | 2 | Erie Blacktop Inc | $2,375,864 | $2,582,942 | +9.0% | -18% | ODOT |
| 230491 | HOC-SR 664-15.88 (TWO LANE RESURFACING) | HOC | 2 | Shelly Company | $2,360,399 | $2,451,516 | +4.0% | +6.0% | ODOT |
| 230467 | HAM-IR 74-14.20 (SLIDE REPAIR) | HAM | 3 | Sunesis Construction Co | $2,117,187 | $2,612,062 | +23% | +36% | ODOT |
| 230498 | SHE-SR 47-03.97 (BRIDGE REPAIR) | SHE | 3 | Brumbaugh Construction Inc | $1,645,000 | $1,752,900 | +7.0% | -21% | ODOT |
| 230499 | TRU-SR 5-14.36 (TWO LANE RESURFACING) | TRU | 5 | Shelly & Sands Inc | $1,505,126 | $1,617,887 | +7.0% | +2.0% | ODOT |
| 230489 | GAL-US 35-00.00 (MICROSURFACING) | GAL | 1 | Strawser Construction Inc | $1,201,405 | -9.0% | ODOT | ||
| 230483 | ASD-US 42-12.46 (BRIDGE REPAIR) | ASD | 4 | Black Horse Bridge Construction Inc | $967,353 | $986,610 | +2.0% | +15% | ODOT |
| 233009 | PIK-CR 8-05.75 (BRIDGE REPLACEMENT (1 BRIDGE)) | PIK | 5 | Shelly & Sands Inc | $676,450 | $713,314 | +5.0% | -23% | ODOT |
| 230501 | WAR-CR 119-00.00 Clearcreek-Frank (TWO LANE RESURFACING) | WAR | 2 | John R Jurgensen Company | $636,973 | $744,600 | +17% | -3.0% | ODOT |
| 234023 | JEF-SR 7-22.93 (SLIDE REPAIR) | JEF | 3 | Alan Stone Co Inc | $609,772 | $618,773 | +1.0% | +5.0% | ODOT |
| 230488 | D07-BH-FY24 (B) (BRIDGE REPAIR) | District 7 | 3 | BCC Ohio Inc | $532,693 | $845,416 | +59% | +1.0% | ODOT |
| 230504 | D02-RPM FY2024 (RAISED PAVEMENT MARKERS) | District 2 | 2 | A & A Safety Inc | $455,835 | $512,368 | +12% | +39% | ODOT |
| 230506 | D06-ELEC FY24 (LIGHTING) | District 6 | 3 | Perram Electric Inc | $437,000 | $480,635 | +10% | +3.0% | ODOT |
| 230485 | ATH-Hockhocking Adena Bikeway (BIKEWAYS) | ATH | 2 | Alan Stone Co Inc | $418,450 | $438,998 | +5.0% | +10% | ODOT |
| 230490 | HAM-CR 90-03.89 (SIDEWALK) | HAM | 3 | Rack & Ballauer Excavating Co Inc | $312,497 | $361,638 | +16% | +11% | ODOT |
| 230487 | D07-GR Type A Replacement (GUARDRAIL REBUILDING) | District 7 | 4 | M P Dory Co | $241,934 | $242,125 | 0.0% | -13% | ODOT |
| 230497 | ROS-US 50-19.39 (Safety) (SIGNALIZATION) | ROS | 4 | Complete General Construction Company | $73,208 | $79,974 | +9.0% | -5.0% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out.