Brumbaugh Construction Inc: ODOT bid record
Brumbaugh Construction Inc submitted 80 bids on Ohio DOT contracts in the data, from 13 FEB 2020 to 29 OCT 2026, and was the low bidder on 27 of them (34%). When it was not low, its total sat a median +9.0% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $39,429,354
- Latest bid
- 29 OCT 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 11 | 3 | 27% |
| 2021 | 18 | 5 | 28% |
| 2022 | 14 | 7 | 50% |
| 2023 | 9 | 3 | 33% |
| 2024 | 6 | 3 | 50% |
| 2025 | 9 | 1 | 11% |
| 2026 | 13 | 5 | 38% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| MOT | 17 | 5 | 29% |
| PRE | 15 | 5 | 33% |
| MIA | 10 | 2 | 20% |
| BUT | 6 | 1 | 17% |
| MER | 6 | 3 | 50% |
| AUG | 6 | 3 | 50% |
| DAR | 5 | 2 | 40% |
| GRE | 3 | 0 | 0% |
| District 7 | 3 | 2 | 67% |
| CLA | 3 | 0 | 0% |
| SHE | 3 | 3 | 100% |
| WAR | 2 | 1 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 75 | 75 (100%) | $1.00 | $1.00 |
| Subgrade compaction | 204E10000 | SY | 61 | 47 (77%) | $1.50 | $3.00 |
| Aggregate base | 304E20000 | CY | 65 | 38 (58%) | $65.00 | $90.00 |
| Water | 616E10000 | MGAL | 28 | 25 (89%) | $5.00 | $20.00 |
| Water | 659E35000 | MGAL | 75 | 24 (32%) | $5.00 | $1.00 |
| Seeding and mulching | 659E10000 | SY | 50 | 24 (48%) | $3.00 | $2.60 |
| Commercial fertilizer | 659E20000 | TON | 76 | 23 (30%) | $750.00 | $850.00 |
| Special - steel drip strip | 518E22300 | FT | 36 | 23 (64%) | $14.00 | $16.50 |
| Porous backfill with geotextile fabric | 518E21200 | CY | 26 | 23 (88%) | $75.00 | $125.00 |
| Excavation | 203E10000 | CY | 63 | 21 (33%) | $22.00 | $27.00 |
| Pavement removed | 202E23000 | SY | 56 | 21 (38%) | $12.00 | $17.00 |
| Sealing of concrete surfaces (epoxy-urethane) | 512E10100 | SY | 42 | 19 (45%) | $30.00 | $34.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Complete General Construction Company | 51 | 11 of 51 |
| Eagle Bridge Co | 49 | 21 of 49 |
| Sunesis Construction Co | 35 | 5 of 35 |
| John R Jurgensen Company | 21 | 2 of 21 |
| Barrett Paving Materials Inc | 17 | 8 of 17 |
| R B Jergens Contractors Inc | 15 | 5 of 15 |
| BCC Ohio Inc | 13 | 9 of 13 |
| Outdoor Enterprise LLC | 11 | 4 of 11 |
| Double Jay Construction Inc | 11 | 7 of 11 |
| Miller Bros Const Inc | 9 | 5 of 9 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 29 OCT 2026 | 260469 | MOT | MOT-Johnson Station Rd Bridge (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 6 | $1,550,000 | +19% |
| 29 OCT 2026 | 260471 | MOT | MOT-SR 835-02.57 (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 5 | $5,990,000 | +8.0% |
| 01 OCT 2026 | 260430 | MOT | MOT-GMR Trail IMP CR22B (BIKEWAYS) | 7 of 8 | $1,842,662 | +12% |
| 01 OCT 2026 | 260450 | SHE | SHE-SR 119-03.60 (BRIDGE REPAIR) | 1 of 4 | $515,000 | Low, 4.0% under the second |
| 30 JUL 2026 | 268015 | PRE | PRE-IR 70 WB Truck Parking (PARKING AREAS) | 4 of 6 | $15,300,000 | +28% |
| 07 MAY 2026 | 260212 | PRE | PRE-SR 726-02.74 (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 5 | $1,215,000 | Low, 4.0% under the second |
| 07 MAY 2026 | 260243 | MIA | MIA-CR 15-05.57 BH (BRIDGE REPAIR) | 3 of 4 | $3,000,000 | +17% |
| 07 MAY 2026 | 260261 | MIA | MIA-SR 571/SR 718-VAR/07.62 (MISCELLANEOUS) | 1 of 2 | $1,394,852 | Low, 3.0% under the second |
| 23 APR 2026 | 260210 | MOT | MOT-Old N. Dayton Trail, Seg 2 (BIKEWAYS) | 1 of 5 | $1,083,094 | Low, 1.0% under the second |
| 23 APR 2026 | 260225 | WAR | WAR-Central Greenway SUP Seg D (BIKEWAYS) | 2 of 5 | $707,952 | +2.0% |
| 19 FEB 2026 | 260090 | MOT | MOT-Trotwood Olive Rd Walks SA22 (SPOT SAFETY) | 2 of 5 | $844,632 | +2.0% |
| 29 JAN 2026 | 260059 | MER | MER-FT RECOVERY SIDEWALKS SA22 (SIDEWALK) | 3 of 4 | $1,018,312 | +15% |
| 29 JAN 2026 | 260066 | PRE | PRE-MR 112-00.99 N Maple Ph 2 (MINOR RECONSTRUCTION) | 1 of 6 | $2,438,718 | Low, 4.0% under the second |
| 18 DEC 2025 | 250592 | MIA | MIA-SR 571-IMP 06.38 (BIKEWAYS) | 2 of 7 | $1,773,281 | +19% |
| 04 DEC 2025 | 250565 | MER | MER-SR 219-13.80 (BRIDGE REPAIR) | 1 of 3 | $1,450,000 | Low, 17% under the second |
| 13 NOV 2025 | 250538 | AUG | AUG-GLSM East Bank CR (CULVERT REPLACEMENT) | 2 of 4 | $116,140 | +1.0% |
| 09 OCT 2025 | 250455 | AUG | AUG-SR 219-09.27 (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 5 | $1,000,000 | +5.0% |
| 25 SEP 2025 | 250439 | MIA | MIA-SR 41-11.32 (INTERSECTION) | 6 of 6 | $4,097,216 | +23% |
| 11 SEP 2025 | 250405 | BUT | BUT-SR 122-06.50R (CULVERT REPLACEMENT) | 2 of 4 | $1,151,167 | +5.0% |
| 22 MAY 2025 | 258009 | AUG | AUG-St Marys Indiana Walks SA22 (SIGNALIZATION) | 2 of 5 | $1,415,587 | +8.0% |
| 10 APR 2025 | 250197 | PRE | PRE-SR 725-13.60 (CULVERT REPLACEMENT) | 2 of 6 | $969,889 | +4.0% |
| 13 FEB 2025 | 250097 | MOT | MOT-Sycamore Creek Bridge Replac (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 7 | $530,000 | +12% |
| 19 DEC 2024 | 240591 | AUG | AUG-SR 274-04.31 (CULVERT REPLACEMENT) | 1 of 6 | $173,639 | Low, 47% under the second |
| 05 DEC 2024 | 240550 | District 7 | D07-BH-FY25 (D) (BRIDGE REPAIR) | 3 of 6 | $2,333,872 | +13% |
| 14 NOV 2024 | 240515 | CLA | CLA-US 42-08.20 (BRIDGE REPLACEMENT (1 BRIDGE)) | 4 of 12 | $1,025,000 | +9.0% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.