ODOT contract 250097 bid tabulation

MOT-Sycamore Creek Bridge Replac (BRIDGE REPLACEMENT (1 BRIDGE)). Let by Ohio DOT on February 13, 2025, MOT. 7 bids received; low bid $473,959 by R B Jergens Contractors Inc, +0.4% against the engineer's estimate of $472,000.

Owner
Ohio DOT
Letting
13 FEB 2025
Pay items
48
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1R B Jergens Contractors Inc$473,959Low0.0%
2Double Z Construction Company$487,831+3.0%+3.0%
3Brumbaugh Construction Inc$530,000+12%+12%
4KT Holden Construction LLC$558,540+18%+18%
5John R Jurgensen Company$594,155+25%+26%
6Sunesis Construction Co$660,321+39%+40%
7Complete General Construction Company$672,604+42%+43%
ODOT contract 250097: bids by rank

Engineer's estimate: $472,000.

Bid tabulation

LinePay itemUnitQuantity1. R B Jergens Contractors Inc2. Double Z Construction Company3. Brumbaugh Construction Inc4. KT Holden Construction LLC5. John R Jurgensen Company6. Sunesis Construction Co
1Clearing and grubbing (201E11000)LS1$10,321$5,000.00$5,000.00$88,130$6,493.49$33,674
2Pavement removed (202E23000)SY314$8.76$7.00$10.00$5.70$6.92$12.41
3Excavation (203E10000)CY144$32.85$35.00$25.00$19.00$41.66$49.73
4Embankment (203E20000)CY436$14.86$36.00$25.00$21.50$38.13$41.39
5Subgrade compaction (204E10000)SY1,232$4.32$7.00$1.00$2.25$2.73$4.79
6Excavation of subgrade (204E13000)CY31$39.03$65.00$25.00$5.50$56.46$116.18
7Rock channel protection, type C with geotextile fabric (601E32204)CY27$242.35$135.00$100.00$200.00$244.65$198.46
8Topsoil (659E00300)CY231$67.53$65.00$60.00$35.00$50.19$65.00
9Seeding and mulching, as per plan (659E10001)SY1,139$3.95$8.50$5.00$2.30$5.75$5.03
10Repair seeding and mulching (659E14000)SY104$3.95$3.80$1.00$2.30$5.75$3.80
11Inter-seeding (659E15000)SY104$3.95$3.80$1.00$2.30$5.75$3.80
12Commercial fertilizer (659E20000)TON0.29$789.55$760.00$900.00$760.00$850.00$760.00
13Lime (659E31000)ACRE0.43$51.93$50.00$1.00$50.00$50.00$50.00
14Water (659E35000)MGAL12$51.94$50.00$1.00$50.00$1.00$50.00
15Storm water pollution prevention plan (832E15000)LS1$1,869.99$3,000.00$2,500.00$3,500.00$2,575.00$2,575.00
16Storm water pollution prevention inspections (832E15002)LS1$6,233.30$8,700.00$8,500.00$4,200.00$5,550.00$2,100.00
17Storm water pollution prevention inspection software (832E15010)LS1$6,233.30$6,000.00$6,000.00$5,400.00$5,316.91$5,316.91
18Erosion control (832E30000)EACH8,200$1.00$1.00$1.00$1.00$1.00$1.00
19Aggregate base (304E20000)CY142$72.44$105.00$75.00$85.00$110.13$96.36
20Tack coat (407E10000)GAL35$6.06$5.00$20.00$18.40$5.00$15.00
21Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000)CY18$624.51$515.00$450.00$482.35$515.00$580.00
22Asphalt concrete intermediate course, type 2, (449) (441E70300)CY36$588.13$485.00$450.00$351.55$485.00$580.00
23Structure removed, as per plan (202E11001)LS1$39,311$17,000$30,000$13,000$16,708$123,880
24Cofferdams and excavation bracing (503E11100)LS1$14,116$23,000$25,000$32,320$20,194$29,485
25Unclassified excavation (503E21300)LS1$15,121$12,000$5,000.00$14,500$6,517.91$8,093.75
26Pile driving equipment mobilization (505E11100)LS1$10,395$20,000$10,000$33,700$31,736$419.87
2712" cast-in-place reinforced concrete piles, driven (507E00500)FT160$15.16$35.00$5.00$10.70$115.51$63.95
2812" cast-in-place reinforced concrete piles, furnished (507E00550)FT200$49.14$50.00$90.00$76.00$62.98$50.46
29Epoxy coated steel reinforcement (509E10000)LB6,084$2.08$1.80$1.50$1.80$2.35$1.91
30Class QC2 concrete, superstructure (511E31610)CY24$1,510.76$1,850.00$2,200.00$1,550.00$2,685.03$2,371.68
31Class QC1 concrete, abutment not including footing (511E44110)CY11$1,258.73$1,300.00$1,500.00$1,670.00$1,918.31$1,471.14
32Class QC1 concrete, footing (511E46510)CY15$728.39$925.00$1,100.00$840.00$1,349.54$1,291.04
33Sealing of concrete surfaces (epoxy-urethane) (512E10100)SY49$77.92$41.00$25.00$65.00$75.00$75.00
34Prestressed concrete composite box beam bridge members, level 1, CB21-36 (515E12040)EACH5$17,733$17,150$30,000$17,000$19,468$19,702
351" preformed expansion joint filler (516E13600)SF27$6.93$11.00$4.00$5.80$17.16$4.96
36Semi-integral abutment expansion joint seal (516E14020)FT44$49.06$30.00$40.00$58.00$55.00$106.73
37Elastomeric bearing with internal laminates only (neoprene) (516E43100)EACH20$148.99$130.00$120.00$178.00$216.53$172.09
38Railing, misc.: wood fence with steel posts (517E76300)FT124$150.60$139.50$160.00$139.50$139.50$139.50
39Porous backfill with geotextile fabric (518E21200)CY25$121.58$115.00$80.00$95.00$177.30$119.57
40Special - steel drip strip (518E22300)FT124$31.85$21.00$15.00$29.20$18.00$18.00
416" perforated corrugated plastic pipe (518E40000)FT44$12.91$7.50$15.00$19.50$11.87$9.46
426" non-perforated corrugated plastic pipe, including specials (518E40010)FT48$17.37$7.50$15.00$29.00$46.19$4.89
43Dynamic load testing (523E20000)EACH1$3,568.57$5,000.00$8,000.00$3,435.00$3,435.00$6,207.15
44Premium for contract performance bond and for payment bond (103E05000)LS1$12,839$5,000.00$10,000$9,865.00$3,498.75$4,408.02
45Maintaining traffic (614E11000)LS1$8,830.25$7,000.00$2,000.00$5,400.00$63,266$3,969.11
46Field office, type A (619E16000)MNTH6$2,646.03$1,500.00$500.00$1,940.00$1,834.81$2,051.67
47Construction layout stakes and surveying (623E10000)LS1$6,752.75$9,000.00$7,500.00$13,000$4,884.12$5,300.00
48Mobilization (624E10000)LS1$11,738$30,000$26,968$27,900$20,000$44,472
ODOT contract 250097: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of February 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy