R B Jergens Contractors Inc: ODOT bid record

R B Jergens Contractors Inc submitted 30 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 01 OCT 2026, and was the low bidder on 10 of them (33%). When it was not low, its total sat a median +15% above the low bid.

Owner
Ohio DOT
Low bid volume
$28,716,382
Latest bid
01 OCT 2026
Data through
12 NOV 2026
30Bids
10Low bids
33Win rate, percent
+15%Median gap to the low bid when not low, 20 bids

By year

YearBidsLow bidsWin rate
20205120%
2021200%
202211100%
20234375%
20244125%
20258225%
20266233%
R B Jergens Contractors Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
AUG600%
MOT5240%
GRE3267%
BUT3133%
CLI22100%
PRE2150%
MIA2150%
HAR100%
MER100%
HAM11100%
CLA100%
FAY100%
R B Jergens Contractors Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH2929 (100%)$1.00$1.00
Embankment203E20000CY2511 (44%)$16.63$25.00
Excavation203E10000CY2710 (37%)$18.56$27.00
Commercial fertilizer659E20000TON279 (33%)$807.31$850.00
Aggregate base304E20000CY278 (30%)$66.67$90.00
Repair seeding and mulching659E14000SY246 (25%)$1.06$1.25
Tied concrete block mat with type 1 underlayment601E21050SY136 (46%)$90.21$152.00
4" concrete walk608E10000SF86 (75%)$8.82$11.00
Pavement removed202E23000SY225 (23%)$10.81$17.00
Excavation of subgrade204E13000CY205 (25%)$32.38$27.00
Ground rod625E32000EACH185 (28%)$281.73$285.00
Catch basin removed202E58100EACH135 (38%)$280.65$500.00
R B Jergens Contractors Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Eagle Bridge Co189 of 18
John R Jurgensen Company185 of 18
Sunesis Construction Co153 of 15
Brumbaugh Construction Inc1510 of 15
Complete General Construction Company142 of 14
Barrett Paving Materials Inc105 of 10
Double Jay Construction Inc52 of 5
Eclipse Co LLC40 of 4
Helms and Sons Excavating43 of 4
Milcon Concrete Inc42 of 4
R B Jergens Contractors Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
01 OCT 2026260430MOTMOT-GMR Trail IMP CR22B (BIKEWAYS)1 of 8$1,642,320Low, 3.0% under the second
01 OCT 2026260440AUGAUG-US 33 Rest Areas TP (PARKING AREAS)4 of 5$7,145,700+10%
30 JUL 2026268015PREPRE-IR 70 WB Truck Parking (PARKING AREAS)1 of 6$11,919,317Low, 7.0% under the second
21 MAY 2026268010District 8D08-Davids Drive Reconstruction (MINOR RECONSTRUCTION)5 of 5$2,346,410+14%
07 MAY 2026260227AUGAUG-US 33-15.65 (INTERCHANGE)3 of 3$9,121,040+16%
26 MAR 2026260156LOGLOG-US 33-09.58 (INTERSECTION)2 of 5$4,619,919+16%
18 DEC 2025250555FAYFAY-US 22-06.21 (INTERSECTION)3 of 5$2,249,4080.0%
18 DEC 2025250592MIAMIA-SR 571-IMP 06.38 (BIKEWAYS)4 of 7$1,836,629+23%
13 NOV 2025250538AUGAUG-GLSM East Bank CR (CULVERT REPLACEMENT)3 of 4$123,307+7.0%
25 SEP 2025250439MIAMIA-SR 41-11.32 (INTERSECTION)1 of 6$3,326,915Low, 5.0% under the second
22 MAY 2025258009AUGAUG-St Marys Indiana Walks SA22 (SIGNALIZATION)4 of 5$1,457,416+11%
27 FEB 2025250130MOTMOT-SR 4-19.30 (MINOR RECONSTRUCTION)3 of 3$5,677,301+35%
13 FEB 2025250097MOTMOT-Sycamore Creek Bridge Replac (BRIDGE REPLACEMENT (1 BRIDGE))1 of 7$473,959Low, 3.0% under the second
30 JAN 2025250060MOTMOT-Woodman Dr Reconstruction (MINOR RECONSTRUCTION)3 of 7$5,326,833+12%
19 DEC 2024240591AUGAUG-SR 274-04.31 (CULVERT REPLACEMENT)6 of 6$331,489+91%
14 NOV 2024240515CLACLA-US 42-08.20 (BRIDGE REPLACEMENT (1 BRIDGE))10 of 12$1,156,923+23%
09 MAY 2024240277MOTMOT-Vandalia Bike-way Connector (BIKEWAYS)2 of 5$4,649,499+7.0%
25 JAN 2024240051HAMHAM-LMST Ext to Elstun Ph 2 (BIKEWAYS)1 of 5$2,935,718Low, 10% under the second
14 DEC 2023230603PREPRE-MR 112-01.316 N. Maple St. (MINOR RECONSTRUCTION)5 of 7$3,104,715+17%
13 JUL 2023230382GREGRE-Yellow Spgs Multi-Modal FY23 (SIDEWALK)1 of 3$962,731Low, 14% under the second
27 APR 2023230251BUTBUT-CR 19-05.88 (BIKEWAYS)1 of 5$1,229,103Low, 9.0% under the second
27 APR 2023230274CLICLI-IR 71-11.21 Weigh Station (PARKING AREAS)1 of 5$1,573,811Low, 4.0% under the second
01 DEC 2022220598CLICLI-SR 73-02.66 (INTERSECTION)1 of 6$2,850,793Low, 10% under the second
14 OCT 2021210533AUGAUG-St. Marys US 33 Ped Bridge (NEW BRIDGE)6 of 6$4,161,681+18%
14 JAN 2021210028MERMER-SR 716-05.02 (BRIDGE REPAIR)7 of 9$396,825+16%
R B Jergens Contractors Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.