R B Jergens Contractors Inc: ODOT bid record
R B Jergens Contractors Inc submitted 30 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 01 OCT 2026, and was the low bidder on 10 of them (33%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $28,716,382
- Latest bid
- 01 OCT 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 5 | 1 | 20% |
| 2021 | 2 | 0 | 0% |
| 2022 | 1 | 1 | 100% |
| 2023 | 4 | 3 | 75% |
| 2024 | 4 | 1 | 25% |
| 2025 | 8 | 2 | 25% |
| 2026 | 6 | 2 | 33% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| AUG | 6 | 0 | 0% |
| MOT | 5 | 2 | 40% |
| GRE | 3 | 2 | 67% |
| BUT | 3 | 1 | 33% |
| CLI | 2 | 2 | 100% |
| PRE | 2 | 1 | 50% |
| MIA | 2 | 1 | 50% |
| HAR | 1 | 0 | 0% |
| MER | 1 | 0 | 0% |
| HAM | 1 | 1 | 100% |
| CLA | 1 | 0 | 0% |
| FAY | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 29 | 29 (100%) | $1.00 | $1.00 |
| Embankment | 203E20000 | CY | 25 | 11 (44%) | $16.63 | $25.00 |
| Excavation | 203E10000 | CY | 27 | 10 (37%) | $18.56 | $27.00 |
| Commercial fertilizer | 659E20000 | TON | 27 | 9 (33%) | $807.31 | $850.00 |
| Aggregate base | 304E20000 | CY | 27 | 8 (30%) | $66.67 | $90.00 |
| Repair seeding and mulching | 659E14000 | SY | 24 | 6 (25%) | $1.06 | $1.25 |
| Tied concrete block mat with type 1 underlayment | 601E21050 | SY | 13 | 6 (46%) | $90.21 | $152.00 |
| 4" concrete walk | 608E10000 | SF | 8 | 6 (75%) | $8.82 | $11.00 |
| Pavement removed | 202E23000 | SY | 22 | 5 (23%) | $10.81 | $17.00 |
| Excavation of subgrade | 204E13000 | CY | 20 | 5 (25%) | $32.38 | $27.00 |
| Ground rod | 625E32000 | EACH | 18 | 5 (28%) | $281.73 | $285.00 |
| Catch basin removed | 202E58100 | EACH | 13 | 5 (38%) | $280.65 | $500.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Eagle Bridge Co | 18 | 9 of 18 |
| John R Jurgensen Company | 18 | 5 of 18 |
| Sunesis Construction Co | 15 | 3 of 15 |
| Brumbaugh Construction Inc | 15 | 10 of 15 |
| Complete General Construction Company | 14 | 2 of 14 |
| Barrett Paving Materials Inc | 10 | 5 of 10 |
| Double Jay Construction Inc | 5 | 2 of 5 |
| Eclipse Co LLC | 4 | 0 of 4 |
| Helms and Sons Excavating | 4 | 3 of 4 |
| Milcon Concrete Inc | 4 | 2 of 4 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 01 OCT 2026 | 260430 | MOT | MOT-GMR Trail IMP CR22B (BIKEWAYS) | 1 of 8 | $1,642,320 | Low, 3.0% under the second |
| 01 OCT 2026 | 260440 | AUG | AUG-US 33 Rest Areas TP (PARKING AREAS) | 4 of 5 | $7,145,700 | +10% |
| 30 JUL 2026 | 268015 | PRE | PRE-IR 70 WB Truck Parking (PARKING AREAS) | 1 of 6 | $11,919,317 | Low, 7.0% under the second |
| 21 MAY 2026 | 268010 | District 8 | D08-Davids Drive Reconstruction (MINOR RECONSTRUCTION) | 5 of 5 | $2,346,410 | +14% |
| 07 MAY 2026 | 260227 | AUG | AUG-US 33-15.65 (INTERCHANGE) | 3 of 3 | $9,121,040 | +16% |
| 26 MAR 2026 | 260156 | LOG | LOG-US 33-09.58 (INTERSECTION) | 2 of 5 | $4,619,919 | +16% |
| 18 DEC 2025 | 250555 | FAY | FAY-US 22-06.21 (INTERSECTION) | 3 of 5 | $2,249,408 | 0.0% |
| 18 DEC 2025 | 250592 | MIA | MIA-SR 571-IMP 06.38 (BIKEWAYS) | 4 of 7 | $1,836,629 | +23% |
| 13 NOV 2025 | 250538 | AUG | AUG-GLSM East Bank CR (CULVERT REPLACEMENT) | 3 of 4 | $123,307 | +7.0% |
| 25 SEP 2025 | 250439 | MIA | MIA-SR 41-11.32 (INTERSECTION) | 1 of 6 | $3,326,915 | Low, 5.0% under the second |
| 22 MAY 2025 | 258009 | AUG | AUG-St Marys Indiana Walks SA22 (SIGNALIZATION) | 4 of 5 | $1,457,416 | +11% |
| 27 FEB 2025 | 250130 | MOT | MOT-SR 4-19.30 (MINOR RECONSTRUCTION) | 3 of 3 | $5,677,301 | +35% |
| 13 FEB 2025 | 250097 | MOT | MOT-Sycamore Creek Bridge Replac (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 7 | $473,959 | Low, 3.0% under the second |
| 30 JAN 2025 | 250060 | MOT | MOT-Woodman Dr Reconstruction (MINOR RECONSTRUCTION) | 3 of 7 | $5,326,833 | +12% |
| 19 DEC 2024 | 240591 | AUG | AUG-SR 274-04.31 (CULVERT REPLACEMENT) | 6 of 6 | $331,489 | +91% |
| 14 NOV 2024 | 240515 | CLA | CLA-US 42-08.20 (BRIDGE REPLACEMENT (1 BRIDGE)) | 10 of 12 | $1,156,923 | +23% |
| 09 MAY 2024 | 240277 | MOT | MOT-Vandalia Bike-way Connector (BIKEWAYS) | 2 of 5 | $4,649,499 | +7.0% |
| 25 JAN 2024 | 240051 | HAM | HAM-LMST Ext to Elstun Ph 2 (BIKEWAYS) | 1 of 5 | $2,935,718 | Low, 10% under the second |
| 14 DEC 2023 | 230603 | PRE | PRE-MR 112-01.316 N. Maple St. (MINOR RECONSTRUCTION) | 5 of 7 | $3,104,715 | +17% |
| 13 JUL 2023 | 230382 | GRE | GRE-Yellow Spgs Multi-Modal FY23 (SIDEWALK) | 1 of 3 | $962,731 | Low, 14% under the second |
| 27 APR 2023 | 230251 | BUT | BUT-CR 19-05.88 (BIKEWAYS) | 1 of 5 | $1,229,103 | Low, 9.0% under the second |
| 27 APR 2023 | 230274 | CLI | CLI-IR 71-11.21 Weigh Station (PARKING AREAS) | 1 of 5 | $1,573,811 | Low, 4.0% under the second |
| 01 DEC 2022 | 220598 | CLI | CLI-SR 73-02.66 (INTERSECTION) | 1 of 6 | $2,850,793 | Low, 10% under the second |
| 14 OCT 2021 | 210533 | AUG | AUG-St. Marys US 33 Ped Bridge (NEW BRIDGE) | 6 of 6 | $4,161,681 | +18% |
| 14 JAN 2021 | 210028 | MER | MER-SR 716-05.02 (BRIDGE REPAIR) | 7 of 9 | $396,825 | +16% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.