ODOT letting results, December 1, 2022
26 contracts let by Ohio DOT on December 1, 2022, $86,017,944 in low bids, a median of 3 bidders per contract. On the 26 with an engineer's estimate, the low bid came in under it 16 times; median low bid -6.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 26
- Low bids, total
- $86,017,944
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 220621 | SUM-IR 77-22.30 (BRIDGE REPLACEMENT (2 BRIDGES)) | SUM | 7 | Kenmore Construction Co Inc | $13,371,660 | $14,902,406 | +11% | -15% | ODOT |
| 220617 | RIC-US 30-13.06 (FOUR LANE RESURFACING) | RIC | 2 | Kokosing Construction Company Inc | $8,625,369 | $8,891,332 | +3.0% | -7.0% | ODOT |
| 220636 | LIC-US 40-13.15 (PART 1, PART 2, PART 3) (INTERSECTION) | LIC | 2 | Shelly Company | $7,746,005 | $8,887,266 | +15% | +16% | ODOT |
| 220627 | COL-US 30-31.21, COL-SR 39-19.83 (FOUR LANE RESURFACING) | COL | 3 | Shelly & Sands Inc | $6,940,095 | $7,484,597 | +8.0% | -13% | ODOT |
| 220604 | DEF-US 127-00.53 (BRIDGE REPLACEMENT (1 BRIDGE)) | DEF | 3 | Miller Bros Const Inc | $6,435,107 | $6,824,776 | +6.0% | -6.0% | ODOT |
| 220637 | LUC-SR 2-13.77 Intr Widen Grp A (PART 1 AND PART 2) (INTERSECTION) | LUC | 2 | Geddis Paving & Excavating Inc | $5,978,551 | $6,357,751 | +6.0% | +38% | ODOT |
| 220645 | VIN-US 50-10.68/HOC-SR 56-04.41 (TWO LANE RESURFACING) | VIN | 1 | Shelly & Sands Inc | $5,332,996 | +5.0% | ODOT | ||
| 220631 | D12-BH FY2022 Overlay (BRIDGE REPAIR) | District 12 | 3 | Great Lakes Construction Co | $3,927,863 | $4,097,942 | +4.0% | +28% | ODOT |
| 220632 | FAI-/LIC-SR 37-00.00/25.08 (TWO LANE RESURFACING) | FAI | 2 | Shelly Company | $3,350,612 | $3,429,064 | +2.0% | +5.0% | ODOT |
| 220647 | D02-PM FY2023 (PAVEMENT MARKING) | District 2 | 3 | Dura Mark Inc | $3,300,000 | $3,749,309 | +14% | -6.0% | ODOT |
| 220629 | D01-Erosion Repair FY23 (MISCELLANEOUS) | District 1 | 2 | Smith Paving & Excavating Inc | $3,190,484 | $4,837,796 | +52% | +17% | ODOT |
| 220598 | CLI-SR 73-02.66 (INTERSECTION) | CLI | 6 | R B Jergens Contractors Inc | $2,850,793 | $3,131,047 | +10% | +12% | ODOT |
| 220644 | STA-SR 687-01.40 (FOUR LANE RESURFACING) | STA | 3 | Karvo Companies Inc | $2,388,000 | $2,570,504 | +8.0% | -7.0% | ODOT |
| 220635 | LAW-SR 93-12.00 PV (TWO LANE RESURFACING) | LAW | 1 | Shelly Company | $2,296,547 | +25% | ODOT | ||
| 220646 | WAY-SR 94-08.18 (TWO LANE RESURFACING) | WAY | 3 | Kokosing Construction Company Inc | $2,155,879 | $2,828,000 | +31% | -24% | ODOT |
| 220638 | MRW-/MAR-SR 309/SR 61-29.20/02.47/22.86 (TWO LANE RESURFACING) | MRW | 2 | Kokosing Construction Company Inc | $1,730,801 | $2,186,930 | +26% | -16% | ODOT |
| 220643 | STA-SR 43-20.20 (MINOR RECONSTRUCTION) | STA | 7 | Shelly & Sands Inc | $1,228,025 | $1,358,014 | +11% | -15% | ODOT |
| 220630 | D11-TSG-FY2023 (SIGNALIZATION) | District 11 | 5 | Cornerstone Electric Inc | $1,138,935 | $1,196,796 | +5.0% | 0.0% | ODOT |
| 220633 | HAR-SR 31-00.00/02.75 (MICROSURFACING) | HAR | 3 | Pavement Maintenance Systems LLC | $898,458 | $963,870 | +7.0% | -4.0% | ODOT |
| 220642 | MUS-SR 146/SR 340-31.42/03.26 (PART 1 AND PART 2) (SLIDE REPAIR) | MUS | 6 | Cast & Baker Corporation | $683,211 | $709,684 | +4.0% | -22% | ODOT |
| 220640 | MEG-SR 7-07.61 (BRIDGE REPAIR) | MEG | 3 | Shelly & Sands Inc | $505,031 | $528,665 | +5.0% | -8.0% | ODOT |
| 220628 | CUY-SR 175-07.30 Safety (SIGNALIZATION) | CUY | 1 | Perram Electric Inc | $488,181 | -1.0% | ODOT | ||
| 220639 | MED-IR 71-15.29 (BRIDGE REPAIR) | MED | 3 | Suburban Maintenance & Construction Inc | $481,138 | $530,010 | +10% | -16% | ODOT |
| 220641 | MOT-Olentangy Drive Bridge Repl (CULVERT REPLACEMENT) | MOT | 6 | Brumbaugh Construction Inc | $480,000 | $519,755 | +8.0% | -14% | ODOT |
| 220634 | LAK-Kirtland Road (TWO LANE RESURFACING) | LAK | 3 | Ronyak Paving Inc | $299,550 | $311,034 | +4.0% | +2.0% | ODOT |
| 220648 | D03-TSG FY2023 (SIGNALIZATION) | District 3 | 5 | Perram Electric Inc | $194,655 | $197,792 | +2.0% | -37% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out.