Pavement Maintenance Systems LLC: ODOT bid record
Pavement Maintenance Systems LLC submitted 23 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 21 MAY 2026, and was the low bidder on 8 of them (35%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $12,280,749
- Latest bid
- 21 MAY 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 8 | 2 | 25% |
| 2021 | 2 | 0 | 0% |
| 2022 | 3 | 2 | 67% |
| 2023 | 2 | 0 | 0% |
| 2024 | 5 | 2 | 40% |
| 2025 | 2 | 1 | 50% |
| 2026 | 1 | 1 | 100% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| ALL | 3 | 1 | 33% |
| LOG | 2 | 0 | 0% |
| HAR | 2 | 1 | 50% |
| MOT | 1 | 0 | 0% |
| SAN | 1 | 0 | 0% |
| District 7 | 1 | 0 | 0% |
| POR | 1 | 1 | 100% |
| NOB | 1 | 0 | 0% |
| STA | 1 | 1 | 100% |
| WOO | 1 | 0 | 0% |
| MAH | 1 | 0 | 0% |
| MER | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Work zone marking sign | 614E12460 | EACH | 20 | 11 (55%) | $100.00 | $92.00 |
| Center line, type 1 | 642E00300 | MI | 15 | 10 (67%) | $875.00 | $5,500.00 |
| RPM | 621E00100 | EACH | 22 | 9 (41%) | $33.88 | $52.92 |
| Patching concrete bridge deck - type B | 519E12300 | SY | 11 | 9 (82%) | $975.00 | $800.00 |
| Edge line, 6", type 1 | 642E00104 | MI | 13 | 8 (62%) | $750.00 | $3,200.00 |
| Work zone center line, class III, 642 paint | 614E21550 | MI | 9 | 8 (89%) | $900.00 | $1,186.00 |
| Stop line | 646E10400 | FT | 9 | 8 (89%) | $10.25 | $13.00 |
| Erosion control | 832E30000 | EACH | 8 | 8 (100%) | $1.00 | $1.00 |
| Raised pavement marker removed | 621E54000 | EACH | 22 | 7 (32%) | $22.85 | $12.00 |
| Microsurfacing, surface course, as per plan | 421E10011 | SY | 12 | 6 (50%) | $3.17 | $3.16 |
| Lane arrow | 646E20300 | EACH | 8 | 6 (75%) | $157.50 | $175.00 |
| Work zone center line, class I | 614E21000 | MI | 8 | 6 (75%) | $837.50 | $1,632.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Strawser Construction Inc | 23 | 15 of 23 |
| American Pavements Inc | 12 | 7 of 12 |
| Microsurfacing Contractors LLC | 6 | 1 of 6 |
| Missouri Petroleum Products Company LLC | 4 | 1 of 4 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 21 MAY 2026 | 260264 | CRA | CRA-/WAY MICRO VAR FY2027 (MICROSURFACING) | 1 of 2 | $2,498,356 | Low, 8.0% under the second |
| 04 DEC 2025 | 250558 | HAR | HAR-SR 309/SR 235-00.00/Var. (MICROSURFACING) | 2 of 2 | $1,522,323 | +7.0% |
| 25 SEP 2025 | 250427 | ALL | ALL-/HAN-IR 75-00.00/14.10 (MICROSURFACING) | 1 of 2 | $3,185,151 | Low, 84% under the second |
| 05 DEC 2024 | 240545 | CLA | CLA-IR 70-00.51/20.86 (MICROSURFACING) | 2 of 2 | $7,277,049 | +32% |
| 14 NOV 2024 | 240533 | PAU | PAU-US/DEF US 127 11.78/0.00 (MICROSURFACING) | 1 of 2 | $1,796,478 | Low, 7.0% under the second |
| 17 OCT 2024 | 240470 | LOG | LOG-US-US 33-10.71 (MICROSURFACING) | 2 of 2 | $2,462,499 | +24% |
| 12 SEP 2024 | 240417 | HAN | HAN-SR 12-17.45 (MICROSURFACING) | 2 of 2 | $1,071,718 | +28% |
| 18 APR 2024 | 240256 | LUC | LUC-ODNR Maumee Bay St Pk FY24 (MICROSURFACING) | 1 of 2 | $470,687 | Low, 45% under the second |
| 30 NOV 2023 | 230560 | ALL | ALL-SR 309-00.00 (MICROSURFACING) | 2 of 2 | $970,854 | +11% |
| 30 NOV 2023 | 230578 | VAN | VAN-US 33/SR 49/SR 81-Var. (MICROSURFACING) | 2 of 2 | $512,373 | +4.0% |
| 01 DEC 2022 | 220633 | HAR | HAR-SR 31-00.00/02.75 (MICROSURFACING) | 1 of 3 | $898,458 | Low, 7.0% under the second |
| 27 JAN 2022 | 220057 | MER | MER-SR 29/SR 716-13.22/00.00 (MICROSURFACING) | 2 of 3 | $1,725,296 | +2.0% |
| 27 JAN 2022 | 220058 | MIA | MIA-SR 201-00.00 (MICROSURFACING) | 1 of 3 | $478,197 | Low, 4.0% under the second |
| 15 APR 2021 | 210222 | ALL | ALL-IR 75-01.00/02.94/04.60 (MICROSURFACING) | 3 of 3 | $261,192 | +21% |
| 15 APR 2021 | 210239 | MAH | MAH-/TRU MCRO FY2022 (MICROSURFACING) | 3 of 3 | $723,338 | +11% |
| 17 DEC 2020 | 200599 | LOG | LOG-US 33-15.66 (MICROSURFACING) | 4 of 4 | $1,877,335 | +17% |
| 19 NOV 2020 | 200554 | WOO | WOO-SR 199-06.80 Micro (MICROSURFACING) | 3 of 4 | $556,955 | +26% |
| 05 NOV 2020 | 200524 | NOB | NOB-SR 215-00.00 (MICROSURFACING) | 3 of 5 | $294,583 | +13% |
| 05 NOV 2020 | 200528 | STA | STA-SR MCRO FY2021(B) (MICROSURFACING) | 1 of 5 | $879,615 | Low, 2.0% under the second |
| 15 OCT 2020 | 200499 | POR | POR-/TRU MCRO FY2021(A) (MICROSURFACING) | 1 of 5 | $2,073,808 | Low, 8.0% under the second |
| 18 JUN 2020 | 200350 | District 7 | D07-MICRO-FY21 (MICROSURFACING) | 3 of 4 | $1,092,417 | +12% |
| 12 MAR 2020 | 200146 | SAN | SAN-SR 53-00.00 Resurf (MICROSURFACING) | 4 of 4 | $814,940 | +7.0% |
| 23 JAN 2020 | 200027 | MOT | MOT-SR 725-00.00 (MICROSURFACING) | 3 of 4 | $367,937 | +16% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.