ODOT contract 250558 bid tabulation
HAR-SR 309/SR 235-00.00/Var. (MICROSURFACING). Let by Ohio DOT on December 4, 2025, HAR. 2 bids received; low bid $1,421,324 by Strawser Construction Inc, +10% against the engineer's estimate of $1,291,000.
- Owner
- Ohio DOT
- Letting
- 04 DEC 2025
- Pay items
- 17
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Strawser Construction Inc | $1,421,324 | Low | +10% |
| 2 | Pavement Maintenance Systems LLC | $1,522,323 | +7.0% | +18% |
Engineer's estimate: $1,291,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Strawser Construction Inc | 2. Pavement Maintenance Systems LLC |
|---|---|---|---|---|---|
| 1 | Microsurfacing, surface course, as per plan (421E10011) | SY | 328,322 | $3.20 | $3.81 |
| 2 | RPM (621E00100) | EACH | 1,166 | $40.00 | $38.50 |
| 3 | Raised pavement marker removed (621E54000) | EACH | 1,166 | $20.00 | $21.80 |
| 4 | Edge line, 6", type 1 (642E00104) | MI | 28.98 | $800.00 | $750.00 |
| 5 | Center line, type 1 (642E00300) | MI | 14.49 | $900.00 | $600.00 |
| 6 | Removal of pavement marking (643E30030) | MI | 43.47 | $1,050.00 | $990.00 |
| 7 | Channelizing line, 12" (644E00404) | FT | 362 | $2.05 | $2.00 |
| 8 | Transverse/diagonal line (644E00700) | FT | 292 | $6.25 | $8.00 |
| 9 | Lane arrow (644E01300) | EACH | 4 | $120.00 | $120.00 |
| 10 | Removal of pavement marking (644E30000) | FT | 654 | $1.00 | $1.25 |
| 11 | Removal of pavement marking (644E30020) | EACH | 4 | $50.00 | $100.00 |
| 12 | Work zone marking sign (614E12460) | EACH | 61 | $100.00 | $105.00 |
| 13 | Work zone center line, class I (614E21000) | MI | 28.98 | $950.00 | $585.00 |
| 14 | Work zone center line, class II (614E21400) | MI | 28.98 | $400.00 | $200.00 |
| 15 | Premium for contract performance bond, payment bond and maintenance bond (103E06000) | LS | 1 | $6,500.00 | $7,880.00 |
| 16 | Maintaining traffic (614E11000) | LS | 1 | $86,585 | $46,350 |
| 17 | Mobilization (624E10000) | LS | 1 | $76,656 | $39,500 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of December 4, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.