ODOT contract 250558 bid tabulation

HAR-SR 309/SR 235-00.00/Var. (MICROSURFACING). Let by Ohio DOT on December 4, 2025, HAR. 2 bids received; low bid $1,421,324 by Strawser Construction Inc, +10% against the engineer's estimate of $1,291,000.

Owner
Ohio DOT
Letting
04 DEC 2025
Pay items
17
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Strawser Construction Inc$1,421,324Low+10%
2Pavement Maintenance Systems LLC$1,522,323+7.0%+18%
ODOT contract 250558: bids by rank

Engineer's estimate: $1,291,000.

Bid tabulation

LinePay itemUnitQuantity1. Strawser Construction Inc2. Pavement Maintenance Systems LLC
1Microsurfacing, surface course, as per plan (421E10011)SY328,322$3.20$3.81
2RPM (621E00100)EACH1,166$40.00$38.50
3Raised pavement marker removed (621E54000)EACH1,166$20.00$21.80
4Edge line, 6", type 1 (642E00104)MI28.98$800.00$750.00
5Center line, type 1 (642E00300)MI14.49$900.00$600.00
6Removal of pavement marking (643E30030)MI43.47$1,050.00$990.00
7Channelizing line, 12" (644E00404)FT362$2.05$2.00
8Transverse/diagonal line (644E00700)FT292$6.25$8.00
9Lane arrow (644E01300)EACH4$120.00$120.00
10Removal of pavement marking (644E30000)FT654$1.00$1.25
11Removal of pavement marking (644E30020)EACH4$50.00$100.00
12Work zone marking sign (614E12460)EACH61$100.00$105.00
13Work zone center line, class I (614E21000)MI28.98$950.00$585.00
14Work zone center line, class II (614E21400)MI28.98$400.00$200.00
15Premium for contract performance bond, payment bond and maintenance bond (103E06000)LS1$6,500.00$7,880.00
16Maintaining traffic (614E11000)LS1$86,585$46,350
17Mobilization (624E10000)LS1$76,656$39,500
ODOT contract 250558: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of December 4, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy