43 contracts let by Ohio DOT on January 27, 2022, $80,717,852 in low bids, a median of 3 bidders per contract. On the 43 with an engineer's estimate, the low bid came in under it 23 times; median low bid -3.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 43
- Low bids, total
- $80,717,852
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 220065 | WOO-SR 25-00.75 Reconstruction (MAJOR RECONSTRUCTION) | WOO | 6 | Vernon Nagel Inc | $21,670,127 | $22,015,397 | +2.0% | -12% | ODOT |
| 220053 | HAM-IR 75-00.22 (FOUR LANE RESURFACING) | HAM | 2 | Barrett Paving Materials Inc | $8,655,598 | $9,241,419 | +7.0% | +38% | ODOT |
| 220036 | ALL-SR 309-18.19/22.33 (PART 1 AND PART 2) (INTERSECTION) | ALL | 4 | Helms and Sons Excavating | $4,629,823 | $4,939,875 | +7.0% | -7.0% | ODOT |
| 220041 | CLE-SR 28-01.76 (INTERCHANGE) | CLE | 5 | Eagle Bridge Co | $3,903,419 | $4,067,682 | +4.0% | +27% | ODOT |
| 220073 | LAK-SR 2-14.76/VAR Paint (BRIDGE PAINTING) | LAK | 9 | Vimas Painting Company Inc | $3,237,193 | $3,574,578 | +10% | -23% | ODOT |
| 220039 | CLE-SR 32-02.88 (MINOR RECONSTRUCTION) | CLE | 3 | Complete General Construction Company | $2,736,016 | $2,761,000 | +1.0% | +20% | ODOT |
| 220064 | WIL-SR 15-00.00 Resurf (TWO LANE RESURFACING) | WIL | 1 | Gerken Paving Inc | $2,484,031 | +3.0% | ODOT | ||
| 220038 | CHP-PAVE-FY22 (TWO LANE RESURFACING) | CHP | 3 | Barrett Paving Materials Inc | $2,266,000 | $2,280,511 | +1.0% | +13% | ODOT |
| 220066 | WOO-SR 25-11.94 Resurf (FOUR LANE RESURFACING) | WOO | 3 | Shelly Company | $2,023,273 | $2,179,787 | +8.0% | -11% | ODOT |
| 220044 | CUY-/LAK-PM FY2022 Safety (PAVEMENT MARKING) | CUY | 2 | The Aero-Mark Company LLC | $1,786,000 | $1,993,011 | +12% | +6.0% | ODOT |
| 220045 | D08-R/WR PM-FY2022 (PAVEMENT MARKING) | District 8 | 2 | A & A Safety Inc | $1,740,003 | $2,074,383 | +19% | -13% | ODOT |
| 220051 | FRA-US 270-06.17 (BRIDGE REPAIR) | FRA | 5 | Ruhlin Company | $1,735,434 | $1,766,137 | +2.0% | -15% | ODOT |
| 220057 | MER-SR 29/SR 716-13.22/00.00 (MICROSURFACING) | MER | 3 | Strawser Construction Inc | $1,697,592 | $1,725,296 | +2.0% | +7.0% | ODOT |
| 220061 | TRU-Hallock-Young Rd (FOUR LANE RESURFACING) | TRU | 5 | Shelly & Sands Inc | $1,621,691 | $1,757,002 | +8.0% | -11% | ODOT |
| 220070 | D05-PM FY2022 (A) Fast Dry East (PAVEMENT MARKING) | District 5 | 3 | Dura Mark Inc | $1,522,614 | $1,694,638 | +11% | -3.0% | ODOT |
| 220056 | LAK-US 6-02.60 (TWO LANE RESURFACING) | LAK | 5 | Ronyak Paving Inc | $1,515,192 | $1,537,341 | +1.0% | -4.0% | ODOT |
| 220043 | CUY-US 6-03.85 (TWO LANE RESURFACING) | CUY | 6 | Ronyak Paving Inc | $1,319,555 | $1,382,610 | +5.0% | 0.0% | ODOT |
| 220055 | JAC-SR 93 & SR 139-Urban Paving (TWO LANE RESURFACING) | JAC | 1 | Shelly & Sands Inc | $1,253,353 | +17% | ODOT | ||
| 224004 | CUY-SR 82-09.66 Replace (CULVERT REPLACEMENT) | CUY | 2 | Black Horse Bridge Construction Inc | $1,232,655 | $1,637,451 | +33% | +12% | ODOT |
| 220059 | ROS-SR 772-10.30 OH18-01 (SLIDE REPAIR) | ROS | 3 | Allard Excavation LLC | $1,121,755 | $1,433,331 | +28% | -27% | ODOT |
| 220049 | FAI-SR 37-21.55 (BRIDGE REPAIR) | FAI | 4 | George J Igel & Co Inc | $1,064,219 | $1,065,985 | 0.0% | +10% | ODOT |
| 220074 | LAW-SR 7-00.58 Slide Repair (SLIDE REPAIR) | LAW | 5 | Ohio-West Virginia Excavating Co | $990,101 | $1,070,964 | +8.0% | -14% | ODOT |
| 220063 | WAS-IR 77-00.84 (CULVERT REPLACEMENT) | WAS | 3 | Axis Civil Construction LLC | $922,256 | $996,235 | +8.0% | +39% | ODOT |
| 220072 | FRA-MOW FY22 (MOWING) | FRA | 1 | Tom Mayle & Sons Construction Inc | $850,310 | +2.0% | ODOT | ||
| 220075 | LAW-SR 7-01.62 Slide Repair (SLIDE REPAIR) | LAW | 5 | Ohio-West Virginia Excavating Co | $849,308 | $886,862 | +4.0% | -28% | ODOT |
| 220046 | D10-Extrusheet Sign FY2022 (SIGNING) | District 10 | 2 | Lake Erie Construction Company | $806,125 | $909,938 | +13% | +4.0% | ODOT |
| 220042 | CUY-Ashton Lane Bridge (BRIDGE REPLACEMENT (1 BRIDGE)) | CUY | 6 | Union Industrial Contractors Inc | $689,193 | $534,109 | -23% | +3.0% | ODOT |
| 220037 | BUT-SR 4-21.48 (FOUR LANE RESURFACING) | BUT | 2 | John R Jurgensen Company | $684,236 | $769,170 | +12% | -4.0% | ODOT |
| 220067 | ADA-SR 770-10.25 (BRIDGE REPLACEMENT (1 BRIDGE)) | ADA | 7 | Coopers Excavating LLC | $574,953 | $575,674 | 0.0% | -5.0% | ODOT |
| 224005 | GEA-SR 528-15.26 Replace (CULVERT REPLACEMENT) | GEA | 3 | Bog Construction Inc | $544,307 | $592,637 | +9.0% | +10% | ODOT |
| 220040 | CLE-SR 125-04.11 (INTERSECTION) | CLE | 3 | Complete General Construction Company | $538,006 | $685,083 | +27% | +28% | ODOT |
| 220062 | VAN-Rotary Soccer Park Trail (BIKEWAYS) | VAN | 3 | Shelly Company | $498,779 | $503,036 | +1.0% | -12% | ODOT |
| 220058 | MIA-SR 201-00.00 (MICROSURFACING) | MIA | 3 | Pavement Maintenance Systems LLC | $478,197 | $499,371 | +4.0% | -3.0% | ODOT |
| 220071 | D08-/D07 Mowing FY2022 (B) (MOWING) | District 8 | 2 | Linkel Company | $466,290 | $590,900 | +27% | -15% | ODOT |
| 220054 | HAM-SR 126-16.81 (SLIDE REPAIR) | HAM | 2 | Sunesis Construction Co | $461,037 | $745,831 | +62% | +38% | ODOT |
| 220068 | BEL-SR 149-06.23 (SLIDE REPAIR) | BEL | 6 | Ohio-West Virginia Excavating Co | $444,395 | $470,168 | +6.0% | -21% | ODOT |
| 220047 | DAR-SR 118/SR 502-08.25/09.01 (BRIDGE REPAIR) | DAR | 4 | Complete General Construction Company | $421,078 | $439,792 | +4.0% | -2.0% | ODOT |
| 220060 | STA-SR 43-09.08 Drainage (CULVERT REPLACEMENT) | STA | 7 | Tucson Inc | $335,647 | $361,248 | +8.0% | -13% | ODOT |
| 224006 | JAC-SR 776-06.18 Bridge Replacement (CULVERT REPLACEMENT) | JAC | 5 | Parker Corporation | $287,241 | $308,623 | +7.0% | -11% | ODOT |
| 220077 | MAD-SSR FY22 (SIGNING) | MAD | 3 | Cleveland Barricading Systems LLC | $220,608 | $229,493 | +4.0% | -8.0% | ODOT |
| 220048 | DEF-US 127-05.56 (BRIDGE REPAIR) | DEF | 3 | Vernon Nagel Inc | $207,031 | $231,677 | +12% | +1.0% | ODOT |
| 220052 | GAL-SR 7-02.45 (CULVERT REPLACEMENT) | GAL | 3 | Ohio-West Virginia Excavating Co | $143,480 | $200,607 | +40% | +4.0% | ODOT |
| 220069 | D01-HS FY22 (HERBICIDAL SPRAYING) | District 1 | 3 | Naturchem Inc | $89,732 | $232,404 | +159% | -39% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out.