Cleveland Barricading Systems LLC: ODOT bid record
Cleveland Barricading Systems LLC submitted 32 bids on Ohio DOT contracts in the data, from 27 FEB 2020 to 12 NOV 2026, and was the low bidder on 12 of them (38%). When it was not low, its total sat a median +9.0% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $5,727,068
- Latest bid
- 12 NOV 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 9 | 1 | 11% |
| 2021 | 2 | 1 | 50% |
| 2022 | 4 | 2 | 50% |
| 2023 | 6 | 3 | 50% |
| 2024 | 5 | 1 | 20% |
| 2025 | 3 | 1 | 33% |
| 2026 | 3 | 3 | 100% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| District 3 | 6 | 4 | 67% |
| CUY | 3 | 0 | 0% |
| District 4 | 3 | 1 | 33% |
| FAY | 2 | 1 | 50% |
| WOO | 2 | 1 | 50% |
| SUM | 1 | 0 | 0% |
| LOR | 1 | 0 | 0% |
| SAN | 1 | 0 | 0% |
| MOT | 1 | 0 | 0% |
| WAR | 1 | 0 | 0% |
| STA | 1 | 0 | 0% |
| ATB | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Sign, flat sheet | 630E80100 | SF | 30 | 22 (73%) | $10.85 | $24.00 |
| Erosion control | 832E30000 | EACH | 20 | 20 (100%) | $1.00 | $1.00 |
| Sign attachment assembly | 630E75000 | EACH | 19 | 15 (79%) | $515.00 | $600.00 |
| Ground mounted support, no. 3 post, as per plan | 630E03101 | FT | 18 | 15 (83%) | $7.97 | $16.55 |
| Sign post reflector | 630E08600 | EACH | 15 | 15 (100%) | $21.75 | $47.25 |
| Sign, ground mounted extrusheet | 630E80200 | SF | 21 | 13 (62%) | $19.50 | $24.00 |
| Sign backing assembly | 630E82000 | EACH | 20 | 13 (65%) | $130.50 | $165.00 |
| Ground mounted support, no. 3 post | 630E03100 | FT | 14 | 13 (93%) | $7.90 | $15.20 |
| Removal of ground mounted sign and disposal | 630E84900 | EACH | 26 | 11 (42%) | $12.15 | $20.00 |
| Sign support assembly, pole mounted | 630E79500 | EACH | 19 | 11 (58%) | $95.50 | $145.00 |
| Removal of ground mounted post support and disposal | 630E86002 | EACH | 24 | 9 (38%) | $14.68 | $23.50 |
| Ground mounted support, no. 2 post | 630E02100 | FT | 12 | 9 (75%) | $6.82 | $15.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Lake Erie Construction Company | 32 | 17 of 32 |
| M P Dory Co | 21 | 8 of 21 |
| Trafftech Inc | 4 | 0 of 4 |
| A & A Safety Inc | 2 | 1 of 2 |
| Bansal Construction Inc | 1 | 1 of 1 |
| J Ranck Electric Inc | 1 | 0 of 1 |
| Security Fence Group Inc | 1 | 0 of 1 |
| Hydratech Engineered Products LLC | 1 | 0 of 1 |
| Awp Inc DBA Area Wide Protective | 1 | 0 of 1 |
| American Roadway Logistics | 1 | 0 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | 260499 | DEL | DEL-/UNI-SIGN-FY2027 (SIGNING) | 1 of 3 | $413,173 | Low, 62% under the second |
| 15 JAN 2026 | 260030 | WYA | WYA-US 23-09.28 (SIGNING) | 1 of 3 | $252,068 | Low, 26% under the second |
| 15 JAN 2026 | 260034 | District 3 | D03-SYSSIGN FY2026 (SIGNING) | 1 of 2 | $525,537 | Low, 10% under the second |
| 23 OCT 2025 | 250514 | MAH | MAH-/TRU SIGN FY2026 (Systematic) (SIGNING) | 2 of 2 | $2,129,611 | +10% |
| 09 OCT 2025 | 250483 | GUE | GUE-Flat Sheet Signs 2026 (SIGNING) | 3 of 3 | $1,600,782 | +13% |
| 13 FEB 2025 | 250106 | District 3 | D03-SYSSIGN FY2025 (SIGNING) | 1 of 2 | $336,162 | Low, 18% under the second |
| 17 OCT 2024 | 240479 | District 4 | D04-SIGN FY2025 (Systematic) (SIGNING) | 1 of 3 | $1,264,262 | Low, 13% under the second |
| 08 AUG 2024 | 240399 | MOE | MOE-Sign Flatsheet FY2025 (SIGNING) | 2 of 4 | $1,156,764 | +16% |
| 23 MAY 2024 | 240317 | KNO | KNO-Flat Sheet Signs 2024 (SIGNING) | 3 of 3 | $1,262,655 | +10% |
| 21 MAR 2024 | 240193 | CUY | CUY-/LAK SIGN FY2024 (SIGNING) | 3 of 3 | $994,401 | +13% |
| 22 FEB 2024 | 240134 | District 3 | D03-SYSSIGN FY2024 (SIGNING) | 2 of 2 | $517,633 | 0.0% |
| 14 DEC 2023 | 230609 | District 3 | D03-SYSSIGN FY2024(B) (SIGNING) | 1 of 3 | $438,097 | Low, 1.0% under the second |
| 09 NOV 2023 | 230551 | District 1 | D01-STW USBR Signage (SIGNING) | 1 of 2 | $233,436 | Low, 69% under the second |
| 09 NOV 2023 | 230558 | WOO | WOO-SIGN FY2024 (SIGNING) | 2 of 2 | $827,286 | +12% |
| 28 SEP 2023 | 230481 | District 4 | D04-SIGN FY2024 (Systematic) (SIGNING) | 2 of 2 | $1,187,548 | +2.0% |
| 30 MAR 2023 | 230199 | District 4 | D04-SIGN FY2023 (Systematic) (SIGNING) | 2 of 2 | $1,108,552 | +3.0% |
| 09 FEB 2023 | 230110 | WOO | WOO-SIGN FY2023 (SIGNING) | 1 of 2 | $651,814 | Low, 23% under the second |
| 13 OCT 2022 | 220565 | RIC | RIC-SYSSIGN FY2023 (SIGNING) | 2 of 2 | $478,187 | +2.0% |
| 31 MAR 2022 | 220221 | CUY | CUY-/LAK SIGN FY2022 (SIGNING) | 3 of 3 | $761,279 | +7.0% |
| 17 FEB 2022 | 220116 | District 3 | D03-SYSSIGN FY2022 (SIGNING) | 1 of 2 | $669,048 | Low, 2.0% under the second |
| 27 JAN 2022 | 220077 | MAD | MAD-SSR FY22 (SIGNING) | 1 of 3 | $220,608 | Low, 4.0% under the second |
| 26 AUG 2021 | 210480 | ATB | ATB-SIGN FY2022 (Systematic) (SIGNING) | 1 of 4 | $468,295 | Low, 4.0% under the second |
| 25 FEB 2021 | 210122 | District 3 | D03-SYSSIGN FY2021 (SIGNING) | 2 of 4 | $421,796 | -13% |
| 19 NOV 2020 | 200558 | FAY | FAY-/PIC-SSR-FY21 (SIGNING) | 1 of 5 | $254,568 | Low, 8.0% under the second |
| 01 OCT 2020 | 200486 | STA | STA-/SUM-SIGNS FY2021(Systematic) (SIGNING) | 2 of 4 | $973,971 | +1.0% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.