ODOT letting results, December 14, 2023
32 contracts let by Ohio DOT on December 14, 2023, $90,386,242 in low bids, a median of 3 bidders per contract. On the 32 with an engineer's estimate, the low bid came in under it 21 times; median low bid -7.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 32
- Low bids, total
- $90,386,242
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 230591 | BUT-SR 4-09.28 (FOUR LANE RESURFACING) | BUT | 2 | Barrett Paving Materials Inc | $19,555,955 | $19,825,417 | +1.0% | -5.0% | ODOT |
| 230601 | PER-SR 93-00.00 (TWO LANE RESURFACING) | PER | 1 | Shelly Company | $10,303,545 | +18% | ODOT | ||
| 230605 | VAN-CS-Leeson Avenue (MAJOR RECONSTRUCTION) | VAN | 3 | Vernon Nagel Inc | $6,804,371 | $6,808,747 | 0.0% | +21% | ODOT |
| 230559 | ADA-/BRO-SR 41-07.46/00.00 (TWO LANE RESURFACING) | ADA | 3 | Brown County Asphalt Inc | $5,364,851 | $6,356,382 | +18% | -16% | ODOT |
| 230598 | HEN-SR 18/SR 109-09.96/04.01 Resurf (TWO LANE RESURFACING) | HEN | 1 | Gerken Paving Inc | $4,451,867 | -6.0% | ODOT | ||
| 230599 | MIA-CR 16A-00.00 (Peterson Rd Brd) (BRIDGE REPLACEMENT (1 BRIDGE)) | MIA | 5 | Brumbaugh Construction Inc | $4,450,000 | $4,946,125 | +11% | -13% | ODOT |
| 230561 | BEL-/JEF-SR 7-23.51/00.00 (FOUR LANE RESURFACING) | BEL | 2 | NLS Paving, Inc | $3,798,701 | $4,396,142 | +16% | +3.0% | ODOT |
| 230588 | ALL-/HAN-US 30-19.02/00.00 (SPOT PATCHING / PAVEMENT REPAIR) | ALL | 4 | Smith Paving & Excavating Inc | $3,314,040 | $3,549,547 | +7.0% | -8.0% | ODOT |
| 230590 | BEL-SR 26/SR 331-00.00/02.20 (TWO LANE RESURFACING) | BEL | 2 | Shelly & Sands Inc | $3,232,083 | $3,601,850 | +11% | +13% | ODOT |
| 230612 | D12-PM FY2024 (PAVEMENT MARKING) | District 12 | 2 | Dura Mark Inc | $3,232,000 | $3,419,741 | +6.0% | -8.0% | ODOT |
| 230607 | CUY-BH FY2024(B) Approach Slabs (BRIDGE REPAIR) | CUY | 1 | Perk Company Inc | $2,817,466 | +68% | ODOT | ||
| 230603 | PRE-MR 112-01.316 N. Maple St. (MINOR RECONSTRUCTION) | PRE | 7 | Double Jay Construction Inc | $2,648,838 | $2,927,290 | +11% | -16% | ODOT |
| 230594 | D02-FY2024 Microsurfacing (MICROSURFACING) | District 2 | 1 | Strawser Construction Inc | $2,358,934 | -3.0% | ODOT | ||
| 234027 | DEL-SR 605-00.20 (INTERSECTION) | DEL | 2 | Alan Stone Co Inc | $2,269,421 | $2,313,991 | +2.0% | +11% | ODOT |
| 230592 | CUY-SR 17-12.58 (FOUR LANE RESURFACING) | CUY | 4 | Shelly Company | $2,263,984 | $2,347,564 | +4.0% | -10% | ODOT |
| 230614 | MRG-SR 60-14.11 Center Lane (MINOR WIDENING) | MRG | 3 | Shelly & Sands Inc | $1,802,566 | $1,978,081 | +10% | +10% | ODOT |
| 230608 | D01-PM FY24 (PAVEMENT MARKING) | District 1 | 2 | Oglesby Construction Inc | $1,787,633 | $1,832,000 | +2.0% | -12% | ODOT |
| 230600 | NOB-SR 78-16.04/WAS-SR 339-13.54 (MICROSURFACING) | NOB | 1 | Strawser Construction Inc | $1,518,086 | +5.0% | ODOT | ||
| 230589 | ASD-SR 604-00.00 (TWO LANE RESURFACING) | ASD | 2 | Kokosing Construction Company Inc | $1,492,058 | $1,599,283 | +7.0% | -3.0% | ODOT |
| 230595 | D10-Lighting FY2024 (LIGHTING) | District 10 | 5 | Asplundh Construction LLC | $1,170,556 | $1,217,601 | +4.0% | -11% | ODOT |
| 230564 | GAL-Sign Flatsheet FY2024 (SIGNING) | GAL | 2 | M P Dory Co | $972,646 | $1,084,975 | +12% | -9.0% | ODOT |
| 230604 | STA-IR 77-02.57 (SLIDE REPAIR) | STA | 2 | Beaver Excavating Company | $712,069 | $780,852 | +10% | -21% | ODOT |
| 230579 | WAS-SR 26-19.32 (CULVERT REPLACEMENT) | WAS | 6 | Litman Excavating Inc | $682,206 | $787,100 | +15% | -1.0% | ODOT |
| 234028 | HUR-SR 99/SR 162-16.51/23.18 (CULVERT REPLACEMENT) | HUR | 4 | Great Lakes Demolition Company | $514,765 | $573,429 | +11% | -10% | ODOT |
| 230602 | POR-Frost Rd Ph 2 (Streetsboro) (TWO LANE RESURFACING) | POR | 8 | Phillips Paving LLC | $497,127 | $499,399 | 0.0% | -21% | ODOT |
| 230566 | HAM-/WAR-IR 71-13.50/19.29/03.58 (CULVERT REPLACEMENT) | HAM | 3 | BCC Ohio Inc | $477,987 | $803,186 | +68% | -25% | ODOT |
| 230597 | GRE-US 35-10.42 (CULVERT REPLACEMENT) | GRE | 4 | BCC Ohio Inc | $458,996 | $503,746 | +10% | +22% | ODOT |
| 230609 | D03-SYSSIGN FY2024(B) (SIGNING) | District 3 | 3 | Cleveland Barricading Systems LLC | $438,097 | $444,395 | +1.0% | -16% | ODOT |
| 230611 | D09-PM-FY2024(A) (PAVEMENT MARKING) | District 9 | 3 | A & A Safety Inc | $412,684 | $528,977 | +28% | -16% | ODOT |
| 230606 | COS-SR 60-01.34 (BRIDGE REPAIR) | COS | 3 | BCC Ohio Inc | $232,028 | $261,053 | +13% | +5.0% | ODOT |
| 230613 | HAN-US 68-Arlington Signals (SIGNALIZATION) | HAN | 3 | Perram Electric Inc | $222,410 | $223,270 | 0.0% | +10% | ODOT |
| 230610 | D09-HS-FY2024 (HERBICIDAL SPRAYING) | District 9 | 3 | Opterra Solutions, Inc | $128,276 | $211,398 | +65% | -42% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out.