Litman Excavating Inc: ODOT bid record

Litman Excavating Inc submitted 52 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 9 of them (17%). When it was not low, its total sat a median +15% above the low bid.

Owner
Ohio DOT
Low bid volume
$5,261,641
Latest bid
12 NOV 2026
Data through
12 NOV 2026
52Bids
9Low bids
17Win rate, percent
+15%Median gap to the low bid when not low, 43 bids

By year

YearBidsLow bidsWin rate
202016213%
202113431%
20221119%
20237229%
2024400%
2026100%
Litman Excavating Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
BEL25312%
MOE8225%
JEF6117%
NOB5120%
ATH2150%
WAS2150%
MRG100%
TUS100%
HAS100%
District 10100%
Litman Excavating Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH5252 (100%)$1.00$1.00
Aggregate base304E20000CY4621 (46%)$82.50$90.00
Commercial fertilizer659E20000TON3110 (32%)$911.17$850.00
Excavation203E10000CY369 (25%)$26.21$27.00
Pavement removed202E23000SY309 (30%)$18.23$17.00
Drilled shafts, 24" diameter, into bedrock, as per plan524E94505FT239 (39%)$62.51$76.00
Water659E35000MGAL318 (26%)$10.00$1.00
6" non-perforated corrugated plastic pipe, including specials518E40010FT228 (36%)$17.96$19.00
Embankment203E20000CY447 (16%)$21.81$25.00
Class QC1 concrete, footing, as per plan511E46511CY227 (32%)$316.12$450.00
Water616E10000MGAL177 (41%)$10.00$20.00
Concrete masonry602E20000CY177 (41%)$1,025.00$2,300.00
Litman Excavating Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Litman Excavating Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
12 NOV 2026260491BELBEL-SR 7-25.27 (SLIDE REPAIR)2 of 8$882,383+5.0%
21 MAR 2024240164BELBEL-US 250-09.08 (SLIDE REPAIR)3 of 5$330,345+20%
25 JAN 2024240062NOBNOB-SR 145/SR 147-00.38/18.41 (CULVERT REPLACEMENT)7 of 8$1,306,416+21%
11 JAN 2024240003BELBEL-SR 147-02.84 (SLIDE REPAIR)3 of 5$2,194,800+5.0%
11 JAN 2024240039NOBNOB-SR 513/SR 564-07.03/00.26 (CULVERT REPLACEMENT)5 of 8$1,050,952+21%
14 DEC 2023230579WASWAS-SR 26-19.32 (CULVERT REPLACEMENT)1 of 6$682,206Low, 15% under the second
30 NOV 2023230569JEFJEF-US 22-13.83/14.71 (CULVERT REPLACEMENT)3 of 6$895,336+5.0%
30 NOV 2023230587NOBNOB-SR 146-01.95 (CULVERT REPLACEMENT)1 of 9$335,700Low, 0.0% under the second
10 AUG 2023238006MOEMOE-SR 7-07.51 (SLIDE REPAIR)2 of 3$1,673,674+10%
11 MAY 2023230317MOEMOE-SR 255-16.38 (SLIDE REPAIR)3 of 5$558,719+6.0%
27 APR 2023230250BELBEL-US 250-06.45 (SLIDE REPAIR)3 of 5$467,538+6.0%
13 APR 2023230208BELBEL-US 250-07.90 (SLIDE REPAIR)2 of 6$535,034+6.0%
28 JUL 2022227000MOEMOE-SR 26-14.76 (SLIDE REPAIR)4 of 4$571,107+10%
16 JUN 2022220379BELBEL-SR 149-08.15 (PART 1 AND PART 2) (SLIDE REPAIR)4 of 4$1,221,129+13%
16 JUN 2022220380BELBEL-US 250-04.49 (SLIDE REPAIR)3 of 4$362,948+3.0%
16 JUN 2022220381BELBEL-US 250-08.10 (SLIDE REPAIR)3 of 5$317,091+16%
12 MAY 2022220263BELBEL-SR 149-13.63 (SLIDE REPAIR)1 of 4$507,901Low, 8.0% under the second
12 MAY 2022220310BELBEL-SR 26-06.92 (SLIDE REPAIR)3 of 4$398,828+2.0%
12 MAY 2022220323JEFJEF-SR 7-04.00 Truck Parking Area (PARKING AREAS)3 of 5$682,280+15%
28 APR 2022220262BELBEL-CR 56-33.21/34.26 (SLIDE REPAIR)6 of 7$507,622+18%
31 MAR 2022220219BELBEL-SR 26-03.75/03.91 (SLIDE REPAIR)2 of 5$383,561+3.0%
17 FEB 2022228000JEFJEF-SR 150-04.80 (SLIDE REPAIR)5 of 5$530,550+20%
27 JAN 2022220068BELBEL-SR 149-06.23 (SLIDE REPAIR)6 of 6$590,383+33%
16 DEC 2021210661JEFJEF-SR 7-10.37 Ramp B (SLIDE REPAIR)4 of 7$231,853+19%
18 NOV 2021210593BELBEL-SR 800-13.15 (SLIDE REPAIR)1 of 7$167,270Low, 4.0% under the second
Litman Excavating Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy