ODOT letting results, March 31, 2022

25 contracts let by Ohio DOT on March 31, 2022, $44,195,723 in low bids, a median of 3 bidders per contract. On the 25 with an engineer's estimate, the low bid came in under it 11 times; median low bid +2.0% against the estimate.

Owner
Ohio DOT
Contracts
25
Low bids, total
$44,195,723
Data through
12 NOV 2026

Contracts let that day

ContractProjectCountyBidsLow bidderLow bidSecond bidGapAgainst estimateSource
220203CUY-East 185th Streetscape (PART 1 & PART 2) (MAJOR RECONSTRUCTION)CUY2Perk Company Inc Catts Construction Inc Joint Venture$12,021,304$13,211,708+10%+6.0%ODOT
220204CUY-US 6/US 20-24.44/27.78 (TWO LANE RESURFACING)CUY4Chagrin Valley Paving Inc$5,198,024$5,535,550+6.0%+12%ODOT
220223D08-PM/RPM FY2022 (PAVEMENT MARKING)District 82A & A Safety Inc$3,692,669$3,925,000+6.0%-3.0%ODOT
220224D11-GR-FY2022 (GUARDRAIL REBUILDING)District 113Lake Erie Construction Company$3,594,775$3,802,067+6.0%-6.0%ODOT
220176HAM-US 127-09.11 (PART 1 AND PART 2) (FOUR LANE RESURFACING)HAM2John R Jurgensen Company$2,632,831$3,238,269+23%-2.0%ODOT
220209LOG-SR 47/SR 235-05.23/08.18 (INTERSECTION)LOG3Trucco Construction Co Inc$2,624,762$2,922,862+11%+19%ODOT
220218WAR-SR 63/SR 741-00.85/03.66 (TWO LANE RESURFACING)WAR2John R Jurgensen Company$2,497,009$3,177,873+27%+17%ODOT
220217SCI-SR 73-21.00 (MINOR WIDENING)SCI1Shelly Company$1,942,315+14%ODOT
220205D06-RWR PM Retrofit FY22 (PAVEMENT MARKING)District 61Griffin Pavement Striping LLC$1,898,129+1.0%ODOT
220208LIC-SR 13-09.54 (INTERSECTION)LIC6Trucco Construction Co Inc$1,448,974$1,500,226+4.0%+7.0%ODOT
220212MRG-SR 376-01.32 (SLIDE REPAIR)MRG4Shelly & Sands Inc$1,069,990$1,098,389+3.0%-10%ODOT
220221CUY-/LAK SIGN FY2022 (SIGNING)CUY3M P Dory Co$711,213$737,135+4.0%+12%ODOT
220211MOT-SR 741-04.60 (FOUR LANE RESURFACING)MOT2John R Jurgensen Company$691,429$737,852+7.0%+10%ODOT
220215POR-CR 197-01.03 (Frost Rd) (TWO LANE RESURFACING)POR7Shelly Company$689,527$769,881+12%+2.0%ODOT
220206ERI-SR 113-05.85 GSM (SLIDE REPAIR)ERI6Alan Stone Co Inc$659,757$734,749+11%-9.0%ODOT
220227HOL-US 62-15.03 (SLIDE REPAIR)HOL5Dennison Bridge Inc$542,546$547,206+1.0%-14%ODOT
220225D12-GR FY2022 (GUARDRAIL REBUILDING)District 122Cuyahoga Fence LLC$397,951$441,380+11%-16%ODOT
220219BEL-SR 26-03.75/03.91 (SLIDE REPAIR)BEL5Ohio-West Virginia Excavating Co$374,183$383,561+3.0%-29%ODOT
220207FAI-CR 9/TR 222-01.60/00.00 (SIDEWALK)FAI6Axis Civil Construction LLC$341,312$355,156+4.0%+6.0%ODOT
220214PIK-SR 104-00.71 Culvert (CULVERT REPLACEMENT)PIK2Coopers Excavating LLC$334,414$349,827+5.0%+28%ODOT
220201AUG-US 33-07.08 (INTERSECTION)AUG1Shelly Company$259,826+22%ODOT
220222D03-RPM FY2022 (RAISED PAVEMENT MARKERS)District 32W L Markers Inc$239,814$300,136+25%-9.0%ODOT
220226FRA-EXPO FY22 (PARKING AREAS)FRA6Decker Construction Company$153,404$156,927+2.0%-6.0%ODOT
220202CLI-Blanchester SRTS FY 22 (SIDEWALK)CLI2Axis Civil Construction LLC$133,694$176,732+32%+9.0%ODOT
220220CHP-ODNR Kiser Lake State Park 2 (PARKING AREAS)CHP3Henry W Bergman Inc$45,871$53,880+17%-15%ODOT
ODOT contracts let on March 31, 2022, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy