Coopers Excavating LLC: ODOT bid record

Coopers Excavating LLC submitted 27 bids on Ohio DOT contracts in the data, from 26 MAR 2020 to 25 SEP 2025, and was the low bidder on 16 of them (59%). When it was not low, its total sat a median +11% above the low bid.

Owner
Ohio DOT
Low bid volume
$8,213,472
Latest bid
25 SEP 2025
Data through
12 NOV 2026
27Bids
16Low bids
59Win rate, percent
+11%Median gap to the low bid when not low, 11 bids

By year

YearBidsLow bidsWin rate
202044100%
20213267%
20225480%
20236117%
20248450%
202511100%
Coopers Excavating LLC, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
BRO9667%
PIK8563%
HIG6233%
CLI11100%
ADA11100%
SCI11100%
ROS100%
Coopers Excavating LLC, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH2424 (100%)$1.00$1.00
Water659E35000MGAL2422 (92%)$1.00$1.00
Subgrade compaction204E10000SY2119 (90%)$2.00$3.00
Field office, type A619E16000MNTH2018 (90%)$100.00$1,400.00
Lime659E31000ACRE2414 (58%)$100.00$150.00
Edge line, 6", type 1642E00104MI1711 (65%)$11,125$3,200.00
Porous backfill with geotextile fabric518E21200CY1310 (77%)$85.00$125.00
1" preformed expansion joint filler516E13600SF98 (89%)$1.00$10.00
Center line, type 1642E00300MI177 (41%)$18,500$5,500.00
Anchor assembly, MGS type T606E26550EACH87 (88%)$1,125.00$1,260.00
RPM621E00100EACH166 (38%)$451.20$52.92
Law enforcement officer with patrol car for assistance614E11110HR156 (40%)$50.00$80.00
Coopers Excavating LLC, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Coopers Excavating LLC, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
25 SEP 2025250429BROBRO-SR 131-00.07 (CULVERT REPLACEMENT)1 of 6$764,901Low, 2.0% under the second
19 DEC 2024240586PIKPIK-CR 9-05.29 (BRIDGE REPLACEMENT (1 BRIDGE))1 of 7$1,466,057Low, 3.0% under the second
31 OCT 2024240503ROSROS-SR 772-08.76 (SLIDE REPAIR)4 of 9$246,311+13%
13 JUN 2024240330PIKPIK-CR 57-00.62 (CULVERT REPLACEMENT)1 of 6$306,963Low, 12% under the second
04 APR 2024240221PIKPIK-SR 772-13.53 Culvert (CULVERT REPLACEMENT)2 of 7$366,480+10%
21 MAR 2024240165BROBRO-SR 32 Rest Area (CULVERT REPLACEMENT)2 of 10$243,170+2.0%
22 FEB 2024240127BROBRO-US 50-03.95 Culvert (CULVERT REPLACEMENT)1 of 7$219,160Low, 4.0% under the second
22 FEB 2024240141HIGHIG-SR 138-24.60 (CULVERT REPLACEMENT)7 of 9$298,171+37%
08 FEB 2024240092HIGHIG-SR 247-00.04 (BRIDGE REPLACEMENT (1 BRIDGE))1 of 6$622,280Low, 36% under the second
12 OCT 2023233009PIKPIK-CR 8-05.75 (BRIDGE REPLACEMENT (1 BRIDGE))2 of 5$713,314+5.0%
27 APR 2023230282SCISCI-Shawnee SF (CULVERT REPLACEMENT)1 of 4$433,976Low, 0.0% under the second
30 MAR 2023230184HIGHIG-SR 134-07.82 (CULVERT REPLACEMENT)3 of 7$563,197+13%
30 MAR 2023230186HIGHIG-SR 753-12.00 (CULVERT REPLACEMENT)6 of 7$647,773+37%
26 JAN 2023230051HIGHIG-SR 73-17.61 & 17.66 Culvert (CULVERT REPLACEMENT)2 of 9$294,156+11%
26 JAN 2023230058PIKPIK-CR 77-02.07 OBPP (BRIDGE REPLACEMENT (1 BRIDGE))2 of 10$533,912+7.0%
17 NOV 2022220608HIGHIG-TR 239-00.88 (BRIDGE REPLACEMENT (1 BRIDGE))1 of 9$734,821Low, 1.0% under the second
12 MAY 2022220289BROBRO-US 52-03.63 Geotech/Landslide (SLIDE REPAIR)1 of 5$169,741Low, 6.0% under the second
31 MAR 2022220214PIKPIK-SR 104-00.71 Culvert (CULVERT REPLACEMENT)1 of 2$334,414Low, 5.0% under the second
17 MAR 2022220167BROBRO-US 52-15.71 Culvert (CULVERT REPLACEMENT)2 of 3$246,686+29%
27 JAN 2022220067ADAADA-SR 770-10.25 (BRIDGE REPLACEMENT (1 BRIDGE))1 of 7$574,953Low, 0.0% under the second
13 MAY 2021210314BROBRO-US 52-02.51 (SLIDE REPAIR)1 of 5$309,929Low, 28% under the second
01 APR 2021213001PIKPIK-CR 57-03.47 Brdg Replacement (BRIDGE REPLACEMENT (1 BRIDGE))1 of 6$848,602Low, 5.0% under the second
25 FEB 2021210113BROBRO-SR 505-05.97 (CULVERT REPLACEMENT)2 of 9$460,639+4.0%
21 MAY 2020200299BROBRO-SR 763-00.62 Culvert (CULVERT REPLACEMENT)1 of 8$599,585Low, 4.0% under the second
09 APR 2020200195BROBRO-SR 505-05.50 (CULVERT REPLACEMENT)1 of 8$150,221Low, 22% under the second
Coopers Excavating LLC: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy