ODOT contract 250429 bid tabulation

BRO-SR 131-00.07 (CULVERT REPLACEMENT). Let by Ohio DOT on September 25, 2025, BRO. 6 bids received; low bid $764,901 by Coopers Excavating LLC, -8.9% against the engineer's estimate of $840,000.

Owner
Ohio DOT
Letting
25 SEP 2025
Pay items
64
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Coopers Excavating LLC$764,901Low-9.0%
2Double Z Construction Company$779,496+2.0%-7.0%
3Axis Civil Construction LLC$814,726+7.0%-3.0%
4John R Jurgensen Company$889,663+16%+6.0%
5Complete General Construction Company$920,177+20%+10%
6Sunesis Construction Co$993,164+30%+18%
ODOT contract 250429: bids by rank

Engineer's estimate: $840,000.

Bid tabulation

LinePay itemUnitQuantity1. Coopers Excavating LLC2. Double Z Construction Company3. Axis Civil Construction LLC4. John R Jurgensen Company5. Complete General Construction Company6. Sunesis Construction Co
1Clearing and grubbing (201E11000)LS1$15,000$20,000$20,000$15,653$9,000.00$6,710.34
2Pavement removed (202E23000)SY229$19.50$36.00$14.00$24.82$16.00$42.35
3Pipe removed, 24" and under (202E35100)FT76$10.00$10.00$20.00$81.93$56.00$15.62
4Guardrail removed (202E38000)FT325$5.00$2.00$7.50$2.00$2.00$5.75
5Anchor assembly removed, type A (202E42000)EACH2$100.00$310.00$250.00$295.00$400.00$471.77
6Mailbox removed (202E53100)EACH2$25.00$35.00$100.00$98.86$30.00$79.90
7Excavation (203E10000)CY247$27.85$40.00$40.00$45.13$30.00$13.74
8Embankment (203E20000)CY273$25.00$25.00$40.00$50.01$35.00$19.56
9Subgrade compaction (204E10000)SY513$5.00$9.00$3.00$3.54$4.00$5.00
10Guardrail, type MGS with long posts (606E15100)FT512.50$32.16$22.40$30.00$22.40$22.40$30.00
11Anchor assembly, MGS type E (606E26150)EACH2$2,400.00$2,520.00$2,550.00$2,520.00$2,520.00$2,550.00
12Anchor assembly, MGS type T (606E26550)EACH2$1,100.00$1,360.00$1,250.00$1,360.00$1,360.00$1,250.00
13Reference monument, type A (623E40500)EACH4$500.00$410.00$850.00$846.05$1,200.00$744.09
14Special - mailbox support system, double (690E50200)EACH1$250.00$295.00$300.00$483.08$295.00$122.01
15Seeding and mulching (659E10000)SY732$3.00$11.00$5.00$5.00$5.00$3.77
16Repair seeding and mulching (659E14000)SY37$1.50$5.00$5.00$1.00$5.00$1.50
17Commercial fertilizer (659E20000)TON0.10$4,000.00$1,250.00$1,250.00$1,500.00$1,250.00$4,000.00
18Lime (659E31000)ACRE0.15$250.00$150.00$150.00$200.00$150.00$250.00
19Water (659E35000)MGAL4$20.00$105.00$1.00$1.00$1.00$20.00
20Erosion control (832E30000)EACH2,000$1.00$1.00$1.00$1.00$1.00$1.00
21Concrete masonry (602E20000)CY1.50$1,500.00$3,000.00$3,000.00$2,344.88$1,800.00$2,742.39
2236" conduit, type D (611E16900)FT100$90.00$140.00$145.00$236.43$220.00$181.24
23Full depth pavement sawing (252E01500)FT265$10.00$3.50$5.50$5.66$3.00$5.66
24Asphalt concrete base, PG64-22, (449) (301E56000)CY89$425.00$286.00$330.00$530.00$286.00$286.00
25Aggregate base (304E20000)CY71$100.00$110.00$160.00$150.50$130.00$106.73
26Tack coat (407E10000)GAL88$9.00$2.50$5.00$10.00$2.50$2.50
27Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000)CY44$602.00$370.00$350.00$620.00$370.00$370.00
28Asphalt concrete intermediate course, type 1, (449) (441E70200)CY6$475.00$370.00$350.00$850.00$370.00$370.00
29RPM (621E00100)EACH3$548.00$548.00$633.00$633.00$633.00$548.00
30Raised pavement marker removed (621E54000)EACH3$25.00$40.00$60.00$81.29$48.00$42.71
31Barrier reflector, type 3, (bidirectional) (626E00112)EACH9$11.00$10.00$12.00$10.00$10.00$12.00
32Edge line, 6", type 1 (642E00104)MI0.08$14,817$14,817$11,000$11,000$11,000$14,817
33Center line, type 1 (642E00300)MI0.04$19,756$19,756$11,000$11,000$11,000$19,756
34Pavement repair (253E02000)CY15$500.00$1,215.00$350.00$850.05$1,215.00$1,279.67
35Tack coat (407E10000)GAL15$9.00$2.50$5.00$10.00$2.50$2.50
36Stabilized crushed aggregate (411E10000)CY10$100.00$125.00$170.00$382.85$150.00$204.44
37Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000)CY15$475.00$725.00$350.00$680.24$725.00$896.96
38Detour signing (614E12420)LS1$5,750.00$10,000$5,750.00$5,750.00$5,515.00$7,039.72
39Asphalt concrete for maintaining traffic (614E13000)CY10$450.00$150.00$450.00$229.74$300.00$922.12
40Water (616E10000)MGAL1$1.00$75.00$1.00$161.57$160.00$22.03
41Portions of structure removed, over 20 foot span (202E11202)LS1$30,000$35,000$22,000$20,030$85,000$69,164
42Wearing course removed (202E23500)SY101$20.00$30.00$9.00$28.14$20.00$15.01
43Bridge railing removed (202E38500)FT72$30.00$65.00$27.00$62.15$35.00$19.80
44Cofferdams and excavation bracing (503E11100)LS1$5,000.00$14,000$23,000$20,938$40,000$30,098
45Unclassified excavation, as per plan (503E21301)LS1$20,000$45,000$30,000$20,923$50,000$125,704
46Epoxy coated steel reinforcement (509E10000)LB7,318$2.00$1.75$2.25$2.26$3.00$2.82
47Class QC1 concrete, footing (511E46510)CY95$550.00$650.00$665.00$666.06$800.00$707.10
48Class QC1 concrete, headwall (511E46610)CY4$2,000.00$1,000.00$900.00$1,301.27$2,600.00$1,778.94
49Sealing of concrete surfaces (epoxy-urethane) (512E10100)SY111$50.00$40.00$40.00$40.00$40.00$38.74
50Type 2 waterproofing (512E33000)SY474$25.00$25.00$17.00$26.75$26.75$22.02
51Rock channel protection, type B with aggregate filter (601E32110)CY163$85.00$80.00$120.00$296.57$150.00$188.27
5220' X 8' conduit, type A, 706.05, as per plan (611E96499)FT96$2,500.00$2,600.00$3,120.00$2,957.92$2,500.00$2,716.59
53Precast gravity and semigravity retaining wall (851E10000)SF672$125.00$70.00$95.00$79.43$60.00$109.42
54Natural soil (851E11000)CY17$50.00$30.00$40.00$176.37$50.00$41.65
55On-site assistance (851E14000)DAY2$100.00$400.00$500.00$1,000.00$750.00$1.32
56Wall drainage system (851E15000)LS1$5,000.00$5,000.00$8,000.00$7,324.46$8,000.00$7,435.29
57PGSRW inspection and compaction testing (851E15500)LS1$3,600.00$2,000.00$5,000.00$3,075.00$6,000.00$5,263.75
58Premium for contract performance bond and for payment bond (103E05000)LS1$30,000$5,500.00$6,000.00$4,645.21$6,000.00$6,085.53
59Maintaining traffic (614E11000)LS1$4,000.00$6,000.00$6,000.00$7,547.54$10,000$2,489.72
60Field office, type A (619E16000)MNTH3$100.00$1,500.00$2,300.00$2,130.80$3,200.00$1,751.67
61Construction layout stakes and surveying (623E10000)LS1$2,000.00$13,500$10,000$7,250.05$20,000$7,250.00
62Preconstruction survey monument verification and report (623E50000)LS1$1,000.00$800.00$800.00$2,289.48$4,500.00$1,200.00
63Post construction survey monument verification and report (623E51000)LS1$1,000.00$800.00$800.00$2,289.48$4,500.00$1,200.00
64Mobilization (624E10000)LS1$40,000$33,000$25,000$43,750$50,000$60,059
ODOT contract 250429: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of September 25, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy