ODOT contract 250429 bid tabulation
BRO-SR 131-00.07 (CULVERT REPLACEMENT). Let by Ohio DOT on September 25, 2025, BRO. 6 bids received; low bid $764,901 by Coopers Excavating LLC, -8.9% against the engineer's estimate of $840,000.
- Owner
- Ohio DOT
- Letting
- 25 SEP 2025
- Pay items
- 64
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Coopers Excavating LLC | $764,901 | Low | -9.0% |
| 2 | Double Z Construction Company | $779,496 | +2.0% | -7.0% |
| 3 | Axis Civil Construction LLC | $814,726 | +7.0% | -3.0% |
| 4 | John R Jurgensen Company | $889,663 | +16% | +6.0% |
| 5 | Complete General Construction Company | $920,177 | +20% | +10% |
| 6 | Sunesis Construction Co | $993,164 | +30% | +18% |
Engineer's estimate: $840,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Coopers Excavating LLC | 2. Double Z Construction Company | 3. Axis Civil Construction LLC | 4. John R Jurgensen Company | 5. Complete General Construction Company | 6. Sunesis Construction Co |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $15,000 | $20,000 | $20,000 | $15,653 | $9,000.00 | $6,710.34 |
| 2 | Pavement removed (202E23000) | SY | 229 | $19.50 | $36.00 | $14.00 | $24.82 | $16.00 | $42.35 |
| 3 | Pipe removed, 24" and under (202E35100) | FT | 76 | $10.00 | $10.00 | $20.00 | $81.93 | $56.00 | $15.62 |
| 4 | Guardrail removed (202E38000) | FT | 325 | $5.00 | $2.00 | $7.50 | $2.00 | $2.00 | $5.75 |
| 5 | Anchor assembly removed, type A (202E42000) | EACH | 2 | $100.00 | $310.00 | $250.00 | $295.00 | $400.00 | $471.77 |
| 6 | Mailbox removed (202E53100) | EACH | 2 | $25.00 | $35.00 | $100.00 | $98.86 | $30.00 | $79.90 |
| 7 | Excavation (203E10000) | CY | 247 | $27.85 | $40.00 | $40.00 | $45.13 | $30.00 | $13.74 |
| 8 | Embankment (203E20000) | CY | 273 | $25.00 | $25.00 | $40.00 | $50.01 | $35.00 | $19.56 |
| 9 | Subgrade compaction (204E10000) | SY | 513 | $5.00 | $9.00 | $3.00 | $3.54 | $4.00 | $5.00 |
| 10 | Guardrail, type MGS with long posts (606E15100) | FT | 512.50 | $32.16 | $22.40 | $30.00 | $22.40 | $22.40 | $30.00 |
| 11 | Anchor assembly, MGS type E (606E26150) | EACH | 2 | $2,400.00 | $2,520.00 | $2,550.00 | $2,520.00 | $2,520.00 | $2,550.00 |
| 12 | Anchor assembly, MGS type T (606E26550) | EACH | 2 | $1,100.00 | $1,360.00 | $1,250.00 | $1,360.00 | $1,360.00 | $1,250.00 |
| 13 | Reference monument, type A (623E40500) | EACH | 4 | $500.00 | $410.00 | $850.00 | $846.05 | $1,200.00 | $744.09 |
| 14 | Special - mailbox support system, double (690E50200) | EACH | 1 | $250.00 | $295.00 | $300.00 | $483.08 | $295.00 | $122.01 |
| 15 | Seeding and mulching (659E10000) | SY | 732 | $3.00 | $11.00 | $5.00 | $5.00 | $5.00 | $3.77 |
| 16 | Repair seeding and mulching (659E14000) | SY | 37 | $1.50 | $5.00 | $5.00 | $1.00 | $5.00 | $1.50 |
| 17 | Commercial fertilizer (659E20000) | TON | 0.10 | $4,000.00 | $1,250.00 | $1,250.00 | $1,500.00 | $1,250.00 | $4,000.00 |
| 18 | Lime (659E31000) | ACRE | 0.15 | $250.00 | $150.00 | $150.00 | $200.00 | $150.00 | $250.00 |
| 19 | Water (659E35000) | MGAL | 4 | $20.00 | $105.00 | $1.00 | $1.00 | $1.00 | $20.00 |
| 20 | Erosion control (832E30000) | EACH | 2,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 21 | Concrete masonry (602E20000) | CY | 1.50 | $1,500.00 | $3,000.00 | $3,000.00 | $2,344.88 | $1,800.00 | $2,742.39 |
| 22 | 36" conduit, type D (611E16900) | FT | 100 | $90.00 | $140.00 | $145.00 | $236.43 | $220.00 | $181.24 |
| 23 | Full depth pavement sawing (252E01500) | FT | 265 | $10.00 | $3.50 | $5.50 | $5.66 | $3.00 | $5.66 |
| 24 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 89 | $425.00 | $286.00 | $330.00 | $530.00 | $286.00 | $286.00 |
| 25 | Aggregate base (304E20000) | CY | 71 | $100.00 | $110.00 | $160.00 | $150.50 | $130.00 | $106.73 |
| 26 | Tack coat (407E10000) | GAL | 88 | $9.00 | $2.50 | $5.00 | $10.00 | $2.50 | $2.50 |
| 27 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 44 | $602.00 | $370.00 | $350.00 | $620.00 | $370.00 | $370.00 |
| 28 | Asphalt concrete intermediate course, type 1, (449) (441E70200) | CY | 6 | $475.00 | $370.00 | $350.00 | $850.00 | $370.00 | $370.00 |
| 29 | RPM (621E00100) | EACH | 3 | $548.00 | $548.00 | $633.00 | $633.00 | $633.00 | $548.00 |
| 30 | Raised pavement marker removed (621E54000) | EACH | 3 | $25.00 | $40.00 | $60.00 | $81.29 | $48.00 | $42.71 |
| 31 | Barrier reflector, type 3, (bidirectional) (626E00112) | EACH | 9 | $11.00 | $10.00 | $12.00 | $10.00 | $10.00 | $12.00 |
| 32 | Edge line, 6", type 1 (642E00104) | MI | 0.08 | $14,817 | $14,817 | $11,000 | $11,000 | $11,000 | $14,817 |
| 33 | Center line, type 1 (642E00300) | MI | 0.04 | $19,756 | $19,756 | $11,000 | $11,000 | $11,000 | $19,756 |
| 34 | Pavement repair (253E02000) | CY | 15 | $500.00 | $1,215.00 | $350.00 | $850.05 | $1,215.00 | $1,279.67 |
| 35 | Tack coat (407E10000) | GAL | 15 | $9.00 | $2.50 | $5.00 | $10.00 | $2.50 | $2.50 |
| 36 | Stabilized crushed aggregate (411E10000) | CY | 10 | $100.00 | $125.00 | $170.00 | $382.85 | $150.00 | $204.44 |
| 37 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 15 | $475.00 | $725.00 | $350.00 | $680.24 | $725.00 | $896.96 |
| 38 | Detour signing (614E12420) | LS | 1 | $5,750.00 | $10,000 | $5,750.00 | $5,750.00 | $5,515.00 | $7,039.72 |
| 39 | Asphalt concrete for maintaining traffic (614E13000) | CY | 10 | $450.00 | $150.00 | $450.00 | $229.74 | $300.00 | $922.12 |
| 40 | Water (616E10000) | MGAL | 1 | $1.00 | $75.00 | $1.00 | $161.57 | $160.00 | $22.03 |
| 41 | Portions of structure removed, over 20 foot span (202E11202) | LS | 1 | $30,000 | $35,000 | $22,000 | $20,030 | $85,000 | $69,164 |
| 42 | Wearing course removed (202E23500) | SY | 101 | $20.00 | $30.00 | $9.00 | $28.14 | $20.00 | $15.01 |
| 43 | Bridge railing removed (202E38500) | FT | 72 | $30.00 | $65.00 | $27.00 | $62.15 | $35.00 | $19.80 |
| 44 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $5,000.00 | $14,000 | $23,000 | $20,938 | $40,000 | $30,098 |
| 45 | Unclassified excavation, as per plan (503E21301) | LS | 1 | $20,000 | $45,000 | $30,000 | $20,923 | $50,000 | $125,704 |
| 46 | Epoxy coated steel reinforcement (509E10000) | LB | 7,318 | $2.00 | $1.75 | $2.25 | $2.26 | $3.00 | $2.82 |
| 47 | Class QC1 concrete, footing (511E46510) | CY | 95 | $550.00 | $650.00 | $665.00 | $666.06 | $800.00 | $707.10 |
| 48 | Class QC1 concrete, headwall (511E46610) | CY | 4 | $2,000.00 | $1,000.00 | $900.00 | $1,301.27 | $2,600.00 | $1,778.94 |
| 49 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 111 | $50.00 | $40.00 | $40.00 | $40.00 | $40.00 | $38.74 |
| 50 | Type 2 waterproofing (512E33000) | SY | 474 | $25.00 | $25.00 | $17.00 | $26.75 | $26.75 | $22.02 |
| 51 | Rock channel protection, type B with aggregate filter (601E32110) | CY | 163 | $85.00 | $80.00 | $120.00 | $296.57 | $150.00 | $188.27 |
| 52 | 20' X 8' conduit, type A, 706.05, as per plan (611E96499) | FT | 96 | $2,500.00 | $2,600.00 | $3,120.00 | $2,957.92 | $2,500.00 | $2,716.59 |
| 53 | Precast gravity and semigravity retaining wall (851E10000) | SF | 672 | $125.00 | $70.00 | $95.00 | $79.43 | $60.00 | $109.42 |
| 54 | Natural soil (851E11000) | CY | 17 | $50.00 | $30.00 | $40.00 | $176.37 | $50.00 | $41.65 |
| 55 | On-site assistance (851E14000) | DAY | 2 | $100.00 | $400.00 | $500.00 | $1,000.00 | $750.00 | $1.32 |
| 56 | Wall drainage system (851E15000) | LS | 1 | $5,000.00 | $5,000.00 | $8,000.00 | $7,324.46 | $8,000.00 | $7,435.29 |
| 57 | PGSRW inspection and compaction testing (851E15500) | LS | 1 | $3,600.00 | $2,000.00 | $5,000.00 | $3,075.00 | $6,000.00 | $5,263.75 |
| 58 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $30,000 | $5,500.00 | $6,000.00 | $4,645.21 | $6,000.00 | $6,085.53 |
| 59 | Maintaining traffic (614E11000) | LS | 1 | $4,000.00 | $6,000.00 | $6,000.00 | $7,547.54 | $10,000 | $2,489.72 |
| 60 | Field office, type A (619E16000) | MNTH | 3 | $100.00 | $1,500.00 | $2,300.00 | $2,130.80 | $3,200.00 | $1,751.67 |
| 61 | Construction layout stakes and surveying (623E10000) | LS | 1 | $2,000.00 | $13,500 | $10,000 | $7,250.05 | $20,000 | $7,250.00 |
| 62 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $1,000.00 | $800.00 | $800.00 | $2,289.48 | $4,500.00 | $1,200.00 |
| 63 | Post construction survey monument verification and report (623E51000) | LS | 1 | $1,000.00 | $800.00 | $800.00 | $2,289.48 | $4,500.00 | $1,200.00 |
| 64 | Mobilization (624E10000) | LS | 1 | $40,000 | $33,000 | $25,000 | $43,750 | $50,000 | $60,059 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of September 25, 2025. Compiled by Mirage Metrics.