Double Z Construction Company: ODOT bid record

Double Z Construction Company submitted 117 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 29 OCT 2026, and was the low bidder on 16 of them (14%). When it was not low, its total sat a median +12% above the low bid.

Owner
Ohio DOT
Low bid volume
$22,960,130
Latest bid
29 OCT 2026
Data through
12 NOV 2026
117Bids
16Low bids
14Win rate, percent
+12%Median gap to the low bid when not low, 101 bids

By year

YearBidsLow bidsWin rate
20201800%
20211417%
202215320%
202318528%
20241000%
202527415%
202615320%
Double Z Construction Company, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
LIC1100%
HIG9222%
FRA8113%
SCI700%
DEL6117%
MOT6117%
MAD6233%
PIK600%
MAR5240%
ROS500%
ATH400%
UNI400%
Double Z Construction Company, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH116116 (100%)$1.00$1.00
Water659E35000MGAL10777 (72%)$1.00$1.00
Lime659E31000ACRE10154 (53%)$100.00$150.00
Commercial fertilizer659E20000TON10533 (31%)$1,200.00$850.00
Non-tracking tack coat407E20000GAL6633 (50%)$3.50$3.25
Tack coat407E10000GAL5333 (62%)$2.50$3.25
Sealing of concrete surfaces (epoxy-urethane)512E10100SY6731 (46%)$26.50$34.00
Semi-integral abutment expansion joint seal516E14020FT4628 (61%)$30.00$38.45
Guardrail, type MGS606E15050FT7426 (35%)$22.00$22.73
Law enforcement officer with patrol car for assistance614E11110HR5826 (45%)$65.00$80.00
Sealing of concrete surfaces (non-epoxy)512E10050SY5026 (52%)$12.50$14.00
Center line, type 1642E00300MI4826 (54%)$5,500.00$5,500.00
Double Z Construction Company, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Complete General Construction Company10741 of 107
Shelly & Sands Inc7045 of 70
Sunesis Construction Co3913 of 39
D G M Inc3126 of 31
George J Igel & Co Inc3117 of 31
Axis Civil Construction LLC2916 of 29
Eagle Bridge Co2812 of 28
Miller Bros Const Inc2115 of 21
Alan Stone Co Inc209 of 20
Ruhlin Company129 of 12
Double Z Construction Company, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
29 OCT 2026260454ADAADA-SR 247-14.51/15.56 (BRIDGE REPLACEMENT (2 BRIDGES))2 of 5$5,103,924+5.0%
29 OCT 2026260469MOTMOT-Johnson Station Rd Bridge (BRIDGE REPLACEMENT (1 BRIDGE))1 of 6$1,306,719Low, 17% under the second
01 OCT 2026268018DELDEL-US 42-12.63 (CULVERT REPLACEMENT)1 of 4$409,910Low, 7.0% under the second
13 AUG 2026260367PIKPIK-SR 32-06.60 (BRIDGE REPAIR)5 of 6$836,200+62%
25 JUN 2026260324PERPER-SR 345-06.48 (BRIDGE REPAIR)2 of 6$868,7680.0%
07 MAY 2026260249SCISCI-/ROS-SR 73/US 50-10.63/19.26 (BRIDGE REPAIR)3 of 4$765,033+14%
23 APR 2026260206MARMAR-SR 746-09.05 (BRIDGE REPAIR)1 of 3$1,340,165Low, 2.0% under the second
23 APR 2026260224VINVIN-Tar Hollow Culvert (CULVERT REPLACEMENT)3 of 6$454,623+14%
09 APR 2026260147DELDEL-SR 229-00.45 AND VARIOUS (BRIDGE REPAIR)2 of 3$6,118,449+9.0%
12 MAR 2026260134SCISCI-SR 125-06.26 (BRIDGE REPLACEMENT (1 BRIDGE))4 of 7$2,033,755+3.0%
19 FEB 2026260077BROBRO-CR 62-00.42 (BRIDGE REPLACEMENT (1 BRIDGE))2 of 4$1,917,464+12%
19 FEB 2026260078CLICLI-SR 133-02.11 (BRIDGE REPAIR)2 of 4$1,305,810+12%
19 FEB 2026260087JACJAC-SR 788-00.87 (BRIDGE REPLACEMENT (1 BRIDGE))3 of 8$1,067,840+8.0%
29 JAN 2026260062PERPER-MR 56-00.13 (Buckeye Street) (BRIDGE REPLACEMENT (1 BRIDGE))4 of 7$607,546+9.0%
15 JAN 2026260018HIGHIG-SR 73-21.04 (BRIDGE REPLACEMENT (1 BRIDGE))2 of 4$2,249,3110.0%
04 DEC 2025250530MARMAR-SR 95-17.90 (at Jamesway) (INTERCHANGE)4 of 5$3,223,583+13%
13 NOV 2025250521FAIFAI-SR 158-04.20 (INTERSECTION)7 of 7$2,996,549+29%
13 NOV 2025250526HIGHIG-SR 73-00.26 (BRIDGE REPLACEMENT (1 BRIDGE))4 of 8$2,139,927+23%
13 NOV 2025250533ROSROS-SR 138-17.28 (BRIDGE REPLACEMENT (1 BRIDGE))4 of 7$2,793,446+14%
13 NOV 2025250545LOGLOG-US 33-17.82 (BRIDGE REPAIR)3 of 7$637,484+29%
09 OCT 2025250484HIGHIG-SR 753-13.03 (BRIDGE REPAIR)1 of 5$2,056,474Low, 1.0% under the second
25 SEP 2025250429BROBRO-SR 131-00.07 (CULVERT REPLACEMENT)2 of 6$779,496+2.0%
11 SEP 2025250412HIGHIG-US 62-17.10 (BRIDGE REPAIR)1 of 3$221,601Low, 37% under the second
11 SEP 2025250415PICPIC-SR 56-20.77 (SLIDE REPAIR)9 of 10$759,985+62%
11 SEP 2025258021MARMAR-SR 231-03.42 (BRIDGE REPAIR)1 of 4$481,432Low, 8.0% under the second
Double Z Construction Company: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy