ODOT contract 260249 bid tabulation
SCI-/ROS-SR 73/US 50-10.63/19.26 (BRIDGE REPAIR). Let by Ohio DOT on May 7, 2026, SCI. 4 bids received; low bid $670,731 by BCC Ohio Inc, -19% against the engineer's estimate of $830,000.
- Owner
- Ohio DOT
- Letting
- 07 MAY 2026
- Pay items
- 44
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | BCC Ohio Inc | $670,731 | Low | -19% |
| 2 | Complete General Construction Company | $732,900 | +9.0% | -12% |
| 3 | Double Z Construction Company | $765,033 | +14% | -8.0% |
| 4 | Axis Civil Construction LLC | $939,217 | +40% | +13% |
Engineer's estimate: $830,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. BCC Ohio Inc | 2. Complete General Construction Company | 3. Double Z Construction Company | 4. Axis Civil Construction LLC |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $1,548.00 | $3,000.00 | $1,500.00 | $10,000 |
| 2 | Guardrail removed for reuse (202E38200) | FT | 25 | $5.46 | $5.20 | $12.50 | $12.50 |
| 3 | Guardrail rebuilt (606E16000) | FT | 25 | $79.59 | $75.80 | $66.94 | $25.00 |
| 4 | Seeding and mulching (659E10000) | SY | 460 | $3.08 | $7.00 | $10.00 | $3.60 |
| 5 | Repair seeding and mulching (659E14000) | SY | 23 | $1.05 | $7.00 | $7.00 | $3.60 |
| 6 | Commercial fertilizer (659E20000) | TON | 0.06 | $603.83 | $1,250.00 | $1,250.00 | $600.00 |
| 7 | Lime (659E31000) | ACRE | 0.09 | $52.56 | $150.00 | $150.00 | $350.00 |
| 8 | Water (659E35000) | MGAL | 3 | $1.05 | $1.00 | $1.00 | $1.00 |
| 9 | Erosion control (832E30000) | EACH | 2,023 | $1.00 | $1.00 | $1.00 | $1.00 |
| 10 | Tack coat (407E10000) | GAL | 18 | $4.31 | $20.00 | $5.00 | $6.00 |
| 11 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 6 | $1,811.25 | $1,000.00 | $1,000.00 | $1,400.00 |
| 12 | RPM (621E00100) | EACH | 2 | $262.50 | $1,000.00 | $1,000.00 | $1,500.00 |
| 13 | Raised pavement marker removed (621E54000) | EACH | 2 | $20.64 | $50.00 | $20.00 | $50.00 |
| 14 | Edge line, 6", type 1 (642E00104) | MI | 0.12 | $8,715.00 | $8,300.00 | $8,300.00 | $9,200.00 |
| 15 | Center line, type 1 (642E00300) | MI | 0.06 | $8,715.00 | $8,300.00 | $8,300.00 | $15,250 |
| 16 | Increased barrier delineation (614E11630) | FT | 160 | $1.92 | $1.83 | $1.83 | $0.90 |
| 17 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 2 | $2,348.40 | $2,300.00 | $2,300.00 | $4,400.00 |
| 18 | Barrier reflector, type 1 BI-directional (614E13310) | EACH | 7 | $12.06 | $30.00 | $30.00 | $19.00 |
| 19 | Barrier reflector, type 3, BI-directional (614E13314) | EACH | 3 | $12.06 | $30.00 | $30.00 | $19.00 |
| 20 | Object marker, two way (614E13360) | EACH | 10 | $22.70 | $22.00 | $20.00 | $25.00 |
| 21 | Work zone center line, class I, 740.06, type I (614E21200) | MI | 0.19 | $15,888 | $15,150 | $15,131 | $11,500 |
| 22 | Work zone edge line, class I, 6", 740.06, type I (614E22210) | MI | 0.20 | $12,536 | $12,000 | $11,939 | $10,800 |
| 23 | Work zone stop line, class I, 740.06, type I (614E26400) | FT | 24 | $7.94 | $7.56 | $7.56 | $15.00 |
| 24 | Water (616E10000) | MGAL | 2 | $9.00 | $150.00 | $25.00 | $1.00 |
| 25 | Portable barrier, unanchored (622E41100) | FT | 440 | $30.85 | $30.00 | $55.00 | $24.00 |
| 26 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $37,356 | $80,000 | $57,000 | $62,000 |
| 27 | Pavement planing, portland cement concrete, (0.5") (254E01010) | SY | 1,052 | $18.43 | $15.00 | $20.00 | $15.00 |
| 28 | Epoxy coated steel reinforcement (509E10000) | LB | 482 | $4.93 | $5.00 | $5.00 | $6.00 |
| 29 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 76 | $29.88 | $24.00 | $30.00 | $45.00 |
| 30 | Class QC2 concrete, superstructure (511E34410) | CY | 11 | $2,758.77 | $4,500.00 | $3,200.00 | $3,950.00 |
| 31 | Structural expansion joint including elastomeric strip seal, as per plan (516E11211) | FT | 78 | $1,212.78 | $1,100.00 | $1,200.00 | $4,100.00 |
| 32 | Joint sealer (516E31000) | FT | 78 | $38.04 | $28.00 | $30.00 | $40.00 |
| 33 | Deep beam bridge retrofit railing (517E75600) | FT | 437.50 | $128.94 | $123.00 | $130.00 | $125.00 |
| 34 | Superplasticized dense concrete overlay using hydrodemolition (848E10200) | SY | 1,052 | $90.44 | $85.00 | $135.00 | $110.00 |
| 35 | Surface preparation using hydrodemolition (848E20000) | SY | 1,052 | $41.88 | $115.00 | $83.00 | $93.00 |
| 36 | Superplasticized dense concrete overlay (variable thickness), material only (848E30200) | CY | 15 | $447.19 | $360.00 | $350.00 | $310.00 |
| 37 | Hand chipping (848E50000) | SY | 84 | $235.77 | $90.00 | $100.00 | $110.00 |
| 38 | Test slab (848E50100) | LS | 1 | $2,772.00 | $1,500.00 | $500.00 | $3,000.00 |
| 39 | Full-depth repair (848E50200) | CY | 12 | $1,995.19 | $600.00 | $1,200.00 | $3,800.00 |
| 40 | Structural steel members, level UF, as per plan (513E10201) | LB | 1,206 | $42.77 | $47.00 | $55.00 | $29.00 |
| 41 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $8,280.61 | $6,000.00 | $5,000.00 | $7,500.00 |
| 42 | Maintaining traffic (614E11000) | LS | 1 | $62,022 | $68,000 | $76,000 | $22,000 |
| 43 | Construction layout stakes and surveying (623E10000) | LS | 1 | $3,390.00 | $4,000.00 | $3,000.00 | $6,500.00 |
| 44 | Mobilization (624E10000) | LS | 1 | $62,395 | $30,000 | $31,000 | $34,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 7, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.