ODOT contract 250484 bid tabulation

HIG-SR 753-13.03 (BRIDGE REPAIR). Let by Ohio DOT on October 9, 2025, HIG. 5 bids received; low bid $2,056,474 by Double Z Construction Company, +10% against the engineer's estimate of $1,865,000.

Owner
Ohio DOT
Letting
09 OCT 2025
Pay items
54
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Double Z Construction Company$2,056,474Low+10%
2Complete General Construction Company$2,078,467+1.0%+11%
3BCC Ohio Inc$2,111,418+3.0%+13%
4Sunesis Construction Co$2,174,744+6.0%+17%
5Eagle Bridge Co$2,340,534+14%+25%
ODOT contract 250484: bids by rank

Engineer's estimate: $1,865,000.

Bid tabulation

LinePay itemUnitQuantity1. Double Z Construction Company2. Complete General Construction Company3. BCC Ohio Inc4. Sunesis Construction Co5. Eagle Bridge Co
1Clearing and grubbing (201E11000)LS1$7,500.00$5,500.00$2,064.00$2,183.35$250.00
2Pavement planing, asphalt concrete 1.5" deep (254E01000)SY489$16.00$7.00$9.83$7.00$8.30
3Tack coat (407E10000)GAL44$4.50$4.50$1.05$4.50$1.00
4Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000)CY21$775.00$775.00$630.00$775.00$600.00
5Guardrail removed (202E38000)FT400$9.00$8.00$2.52$6.37$2.80
6Guardrail, type MGS (606E15050)FT400$22.86$22.86$23.31$22.86$20.50
7MGS bridge terminal assembly, type 1 (606E35002)EACH4$2,100.00$2,100.00$2,961.00$2,100.00$2,500.00
8Curb, type 4-C (609E24510)FT73$58.00$125.00$32.29$59.97$75.00
9RPM (621E00100)EACH4$450.00$450.00$354.00$450.00$600.00
10Raised pavement marker removed (621E54000)EACH14$15.00$50.00$20.64$6.51$25.00
11Barrier reflector, type 1 (two-way) (626E00102)EACH6$11.00$11.00$13.13$11.00$10.00
12Barrier reflector, type 3 (two-way) (626E00112)EACH12$10.00$10.00$15.75$10.00$12.00
13Edge line, 6", type 1 (642E00104)MI0.09$16,687$7,250.00$17,521$7,250.00$17,500
14Center line, type 1 (642E00300)MI0.04$29,225$22,500$30,686$22,500$35,000
15Pavement repair (253E02000)CY30$500.00$650.00$525.00$500.00$500.00
16Tack coat (407E10000)GAL30$4.50$4.50$1.05$4.50$1.00
17Asphalt concrete surface course, type 1, (448), PG64-22 (441E50000)CY30$450.00$450.00$414.75$450.00$395.00
18Detour signing (614E12420)LS1$9,000.00$9,000.00$6,090.00$8,740.03$8,500.00
19Asphalt concrete for maintaining traffic (614E13000)CY30$200.00$550.00$525.00$491.58$380.00
20Water (616E10000)MGAL1$50.00$80.00$11.55$197.72$10.00
21Portions of structure removed, over 20 foot span, as per plan (202E11203)LS1$300,000$378,000$145,187$316,849$350,000
22Approach slab removed (202E22900)SY122$60.00$95.00$92.03$122.72$70.00
23Epoxy coated steel reinforcement (509E10000)LB43,481$4.89$4.00$4.25$5.42$4.65
24No. 4 deformed GFRP reinforcement (509E30020)FT12,296$1.25$1.50$1.84$1.93$1.75
25Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001)EACH136$27.00$35.00$29.69$19.96$30.00
26Class QC2 concrete with QC/QA, superstructure (511E34412)CY79$2,500.00$1,900.00$1,857.14$3,006.26$3,300.00
27Class QC2 concrete with QC/QA, bridge deck (parapet) (511E34450)CY129$925.00$750.00$1,557.69$802.31$900.00
28Sealing of concrete surfaces (epoxy-urethane) (512E10100)SY910$27.00$26.75$29.40$35.84$26.75
29Surface preparation of existing structural steel (514E00050)SF32,910$5.75$5.75$9.45$5.75$8.00
30Field painting of existing structural steel, prime coat (514E00056)SF32,910$3.00$3.00$5.25$3.00$4.00
31Field painting structural steel, intermediate coat (514E00060)SF32,910$3.00$3.00$3.15$3.00$3.00
32Field painting structural steel, finish coat (514E00066)SF32,910$3.00$3.00$2.36$3.00$2.15
33Grinding fins, tears, slivers on existing structural steel (514E00504)MNHR51$150.00$150.00$157.50$150.00$150.00
34Final inspection repair (514E10000)EACH8$250.00$250.00$210.00$250.00$200.00
35Structural expansion joint including elastomeric strip seal, as per plan (516E11211)FT68$960.00$800.00$1,234.58$1,289.26$1,000.00
36Refurbish bearing device, as per plan (516E45305)EACH8$2,250.00$2,100.00$2,838.38$2,162.83$2,000.00
37Jacking and temporary support of superstructure, as per plan (516E47001)LS1$20,000$25,000$22,205$19,206$40,000
38Reinforced concrete approach slabs with QC/QA (T=1 (526E25010)SY189$375.00$350.00$542.16$481.98$400.00
39Type A installation, as per plan (526E90011)FT68$225.00$625.00$309.90$353.02$450.00
40Micro silica modified concrete overlay using hydrodemolition (848E10000)SY1,261$90.00$75.00$83.30$96.90$90.00
41Surface preparation using hydrodemolition (848E20000)SY1,177$70.00$85.00$62.40$56.92$90.00
42Micro silica modified concrete overlay (variable thickness), material only (848E30000)CY10$300.00$450.00$420.00$446.84$310.00
43Hand chipping (848E50000)SY126$90.00$95.00$271.43$156.80$110.00
44Test slab (848E50100)LS1$600.00$8,000.00$2,598.00$1,005.33$1,500.00
45Existing concrete overlay REMOVED1.5" (848E50320)SY1,177$18.00$15.00$9.38$11.12$16.00
46Removal of debonded or deteriorated existing variable thickness concrete overlay (848E50340)SY12$125.00$50.00$271.40$141.00$100.00
47Premium for contract performance bond and for payment bond (103E05000)LS1$12,000$13,500$26,013$12,041$50,000
48Maintaining traffic (614E11000)LS1$25,000$12,000$5,118.00$7,112.55$5,000.00
49Field office, type A (619E16000)MNTH3$1,800.00$2,000.00$3,975.00$1,910.00$3,000.00
50Construction layout stakes and surveying (623E10000)LS1$2,000.00$19,000$2,550.00$3,000.00$7,500.00
51Mobilization (624E10000)LS1$100,000$104,000$58,604$107,511$115,000
100Excavation (203E10000)CY31$75.00$40.00$19.31$62.16$100.00
101Subgrade compaction (204E10000)SY186$10.00$30.00$3.00$4.79$12.00
102Aggregate base (304E20000)CY25$150.00$150.00$129.12$117.79$200.00
ODOT contract 250484: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of October 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy