Sunesis Construction Co: ODOT bid record

Sunesis Construction Co submitted 311 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 38 of them (12%). When it was not low, its total sat a median +19% above the low bid.

Owner
Ohio DOT
Low bid volume
$126,181,715
Latest bid
12 NOV 2026
Data through
12 NOV 2026
311Bids
38Low bids
12Win rate, percent
+19%Median gap to the low bid when not low, 272 bids

By year

YearBidsLow bidsWin rate
202056814%
20215036%
20223725%
20234449%
202438616%
202541512%
2026451022%
Sunesis Construction Co, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
HAM592034%
MOT2614%
CLE2414%
BUT2314%
BRO2314%
HIG1517%
PIK1500%
WAR1318%
GRE1218%
ROS1218%
CLI11218%
District 89222%
Sunesis Construction Co, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH296296 (100%)$1.00$1.00
Water659E35000MGAL279110 (39%)$1.39$1.00
Commercial fertilizer659E20000TON277100 (36%)$900.00$850.00
Water616E10000MGAL166100 (60%)$14.20$20.00
Ground mounted support, no. 3 post630E03100FT14180 (57%)$15.50$15.20
Embankment203E20000CY24177 (32%)$19.89$25.00
1" preformed expansion joint filler516E13600SF12572 (58%)$5.02$10.00
Sign, flat sheet630E80100SF15170 (46%)$22.00$24.00
Law enforcement officer with patrol car for assistance614E11110HR18369 (38%)$75.00$80.00
Lime659E31000ACRE26468 (26%)$200.00$150.00
Repair seeding and mulching659E14000SY19266 (34%)$1.56$1.25
RPM621E00100EACH14564 (44%)$229.00$52.92
Sunesis Construction Co, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Complete General Construction Company16989 of 169
John R Jurgensen Company11852 of 118
Eagle Bridge Co8464 of 84
Axis Civil Construction LLC6745 of 67
Shelly & Sands Inc6047 of 60
Prus Construction Company6026 of 60
Alan Stone Co Inc5339 of 53
Barrett Paving Materials Inc5133 of 51
Eclipse Co LLC4622 of 46
D G M Inc4635 of 46
Sunesis Construction Co, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
12 NOV 2026260492CLACLA-LMT Culvert Replacement (CULVERT REPLACEMENT)2 of 3$214,872+9.0%
12 NOV 2026260493CLICLI-US 68-09.42 (CULVERT REPLACEMENT)1 of 5$239,218Low, 2.0% under the second
12 NOV 2026260521GUEGUE-IR 70 EB Rest Area TP (PARKING AREAS)3 of 8$7,599,321+3.0%
12 NOV 2026260524WARWAR-IR 71 Rest Areas TP (PARKING AREAS)5 of 7$15,485,841+14%
29 OCT 2026260461HAMHAM-IR 275-11.40 (SLIDE REPAIR)1 of 5$2,766,883Low, 5.0% under the second
29 OCT 2026260469MOTMOT-Johnson Station Rd Bridge (BRIDGE REPLACEMENT (1 BRIDGE))4 of 6$1,612,906+23%
29 OCT 2026260471MOTMOT-SR 835-02.57 (BRIDGE REPLACEMENT (1 BRIDGE))5 of 5$6,647,696+19%
01 OCT 2026260418ADAADA-SR 41-31.36 (SLIDE REPAIR)3 of 5$677,788+21%
01 OCT 2026260425HAMHAM-IR 71-02.26/02.94/03.44 (BRIDGE REPAIR)1 of 5$5,667,659Low, 0.0% under the second
01 OCT 2026260430MOTMOT-GMR Trail IMP CR22B (BIKEWAYS)8 of 8$1,950,697+19%
01 OCT 2026260438VINVIN-SR 278-02.79 (CULVERT REPLACEMENT)3 of 7$665,710+3.0%
17 SEP 2026260408JACJAC-SR 327-14.98 (SLIDE REPAIR)5 of 7$916,023+36%
27 AUG 2026260381CLECLE-SR 125-14.08 (SIDEWALK)3 of 5$1,073,410+10%
13 AUG 2026260362HASHAS-SR 646-01.94 (SLIDE REPAIR)5 of 6$1,314,067+68%
13 AUG 2026260363HASHAS-Bridge St Bridge Replacement (BRIDGE REPLACEMENT (1 BRIDGE))4 of 5$2,394,393+15%
13 AUG 2026260367PIKPIK-SR 32-06.60 (BRIDGE REPAIR)3 of 6$722,179+40%
13 AUG 2026260368PIKPIK-SR 32-18.40 (INTERSECTION)7 of 9$3,329,693+17%
30 JUL 2026260349HAMHAM-Inverts FY2027 (CULVERT REPLACEMENT)4 of 5$2,825,074+50%
28 MAY 2026260271MADMAD-US 42-12.35 (MAJOR WIDENING)3 of 4$12,834,677+4.0%
21 MAY 2026268010District 8D08-Davids Drive Reconstruction (MINOR RECONSTRUCTION)3 of 5$2,223,046+8.0%
07 MAY 2026260212PREPRE-SR 726-02.74 (BRIDGE REPLACEMENT (1 BRIDGE))3 of 5$1,627,958+34%
07 MAY 2026260228CARCAR-Grant St Bridge Replacement (BRIDGE REPLACEMENT (1 BRIDGE))1 of 2$1,628,262Low, 12% under the second
07 MAY 2026260238HAMHAM-Columbia Connector (BIKEWAYS)1 of 3$2,009,547Low, 8.0% under the second
07 MAY 2026260243MIAMIA-CR 15-05.57 BH (BRIDGE REPAIR)4 of 4$3,779,973+48%
07 MAY 2026260247ROSROS-SR 207-08.31 (CULVERT REPLACEMENT)4 of 4$456,806+33%
Sunesis Construction Co: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way