ODOT contract 260408 bid tabulation
JAC-SR 327-14.98 (SLIDE REPAIR). Let by Ohio DOT on September 17, 2026, JAC. 7 bids received; low bid $675,653 by Alan Stone Co Inc, -31% against the engineer's estimate of $974,000.
- Owner
- Ohio DOT
- Letting
- 17 SEP 2026
- Pay items
- 51
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Alan Stone Co Inc | $675,653 | Low | -31% |
| 2 | Shelly & Sands Inc | $760,417 | +13% | -22% |
| 3 | Allard Excavation LLC | $766,792 | +13% | -21% |
| 4 | D G M Inc | $815,478 | +21% | -16% |
| 5 | Sunesis Construction Co | $916,023 | +36% | -6.0% |
| 6 | Ohio-West Virginia Excavating Co | $917,074 | +36% | -6.0% |
| 7 | Complete General Construction Company | $1,279,142 | +89% | +31% |
Engineer's estimate: $974,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Alan Stone Co Inc | 2. Shelly & Sands Inc | 3. Allard Excavation LLC | 4. D G M Inc | 5. Sunesis Construction Co | 6. Ohio-West Virginia Excavating Co |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $1,000.00 | $2,500.00 | $1,500.00 | $9,000.00 | $833.57 | $6,800.00 |
| 2 | Structure removed, as per plan (202E11001) | LS | 1 | $4,600.00 | $2,500.00 | $3,604.00 | $8,800.00 | $537.83 | $8,800.00 |
| 3 | Pavement removed, as per plan (202E23001) | SY | 579 | $15.00 | $18.00 | $25.00 | $22.50 | $23.86 | $20.00 |
| 4 | Excavation (203E10000) | CY | 106 | $20.00 | $17.00 | $36.00 | $30.00 | $29.64 | $55.00 |
| 5 | Embankment (203E20000) | CY | 207 | $15.00 | $22.00 | $27.00 | $30.00 | $22.19 | $56.00 |
| 6 | Subgrade compaction (204E10000) | SY | 79 | $15.00 | $15.00 | $7.00 | $15.00 | $9.00 | $23.00 |
| 7 | Ditch cleanout, as per plan (209E10001) | FT | 50 | $8.50 | $25.00 | $4.00 | $15.00 | $21.68 | $44.00 |
| 8 | Topsoil (659E00300) | CY | 164 | $15.00 | $32.00 | $35.00 | $20.00 | $21.15 | $139.00 |
| 9 | Seeding and mulching (659E10000) | SY | 1,475 | $2.50 | $2.25 | $2.00 | $3.00 | $5.79 | $2.50 |
| 10 | Commercial fertilizer (659E20000) | TON | 0.20 | $630.00 | $1,250.00 | $833.00 | $1,500.00 | $924.45 | $1,580.00 |
| 11 | Lime (659E31000) | ACRE | 0.30 | $910.00 | $150.00 | $595.00 | $300.00 | $160.57 | $189.00 |
| 12 | Water (659E35000) | MGAL | 8 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 13 | Erosion control (832E30000) | EACH | 20,430 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 14 | Pavement planing, asphalt concrete(1.5") (254E01000) | SY | 726 | $15.00 | $9.50 | $9.90 | $7.50 | $7.75 | $10.00 |
| 15 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 64 | $360.00 | $400.00 | $400.00 | $400.00 | $372.00 | $470.00 |
| 16 | Aggregate base (304E20000) | CY | 13 | $170.00 | $145.00 | $150.00 | $350.00 | $197.47 | $234.00 |
| 17 | Tack coat (407E10000) | GAL | 222 | $5.00 | $3.50 | $3.50 | $4.50 | $4.50 | $5.00 |
| 18 | Stabilized crushed aggregate (411E10000) | CY | 23 | $160.00 | $155.00 | $123.00 | $275.00 | $183.63 | $165.00 |
| 19 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 79 | $360.00 | $425.00 | $425.00 | $420.00 | $390.00 | $490.00 |
| 20 | RPM (621E00100) | EACH | 8 | $540.00 | $425.00 | $425.00 | $219.00 | $425.00 | $537.00 |
| 21 | Raised pavement marker removed (621E54000) | EACH | 8 | $55.00 | $35.00 | $13.00 | $1.00 | $6.51 | $52.00 |
| 22 | Ground mounted support, no. 2 post (630E02100) | FT | 13 | $55.00 | $50.00 | $89.00 | $25.00 | $75.00 | $94.00 |
| 23 | Removal of ground mounted post support and disposal (630E86002) | EACH | 1 | $85.00 | $75.00 | $30.00 | $20.00 | $500.00 | $630.00 |
| 24 | Removal of structure mounted sign and reerection (630E86320) | EACH | 1 | $250.00 | $225.00 | $595.00 | $250.00 | $500.00 | $630.00 |
| 25 | Edge line, 6", type 1 (642E00104) | MI | 0.22 | $4,900.00 | $3,850.00 | $3,850.00 | $8,000.00 | $3,850.00 | $4,865.00 |
| 26 | Center line, type 1 (642E00300) | MI | 0.11 | $9,300.00 | $7,250.00 | $7,250.00 | $16,000 | $7,250.00 | $9,160.00 |
| 27 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 2 | $3,000.00 | $2,650.00 | $1,950.00 | $2,500.00 | $2,325.49 | $3,545.00 |
| 28 | Barrier reflector, type 1, BI-directional (614E13310) | EACH | 13 | $40.00 | $15.00 | $12.00 | $25.00 | $32.00 | $40.00 |
| 29 | Object marker, two way (614E13360) | EACH | 12 | $45.00 | $20.00 | $12.00 | $25.00 | $36.00 | $45.00 |
| 30 | Work zone edge line, class I, 4" (614E22000) | MI | 0.38 | $3,200.00 | $2,500.00 | $2,500.00 | $6,000.00 | $2,500.00 | $12,100 |
| 31 | Work zone stop line, class I (614E26000) | FT | 30 | $20.00 | $14.00 | $14.00 | $12.00 | $14.00 | $31.00 |
| 32 | Roads for maintaining traffic, as per plan (615E10001) | LS | 1 | $31,000 | $25,000 | $13,950 | $2,000.00 | $5,638.67 | $5,800.00 |
| 33 | Pavement for maintaining traffic, class B, as per plan (615E25001) | SY | 500 | $80.00 | $62.00 | $74.00 | $141.00 | $135.76 | $125.00 |
| 34 | Water (616E10000) | MGAL | 6 | $1.00 | $80.00 | $1.00 | $1.00 | $78.14 | $1.00 |
| 35 | Portable barrier, unanchored (622E41100) | FT | 610 | $35.00 | $32.00 | $34.00 | $27.25 | $37.03 | $55.00 |
| 36 | Unclassified excavation, as per plan (503E21301) | LS | 1 | $15,000 | $23,000 | $28,371 | $26,000 | $79,086 | $22,600 |
| 37 | Steel piles HP12X53, furnished, as per plan (507E00201) | FT | 1,970 | $60.00 | $59.00 | $69.00 | $65.00 | $66.41 | $70.00 |
| 38 | Concrete, misc.:class QC1, leveling pad (511E71100) | CY | 28 | $560.00 | $625.00 | $849.00 | $850.00 | $1,129.86 | $580.00 |
| 39 | Concrete, misc.:, misc.: precast reinforced concre (511E71200) | SF | 3,496 | $25.00 | $29.00 | $31.00 | $35.00 | $42.00 | $27.00 |
| 40 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 635 | $20.00 | $24.00 | $50.00 | $25.00 | $35.03 | $53.00 |
| 41 | Porous backfill with geotextile fabric (518E21200) | CY | 198 | $150.00 | $190.00 | $126.00 | $110.00 | $127.31 | $122.00 |
| 42 | 6" perforated corrugated plastic pipe (518E40000) | FT | 372 | $5.00 | $2.80 | $7.00 | $15.00 | $6.62 | $18.00 |
| 43 | 6" non-perforated corrugated plastic pipe, including specials, as per plan (518E40011) | FT | 20 | $15.00 | $40.00 | $7.00 | $35.00 | $13.39 | $55.00 |
| 44 | Drilled shafts, 24" diameter, above bedrock, as per plan (524E94503) | FT | 499 | $55.00 | $87.00 | $78.00 | $120.00 | $71.98 | $91.00 |
| 45 | Drilled shafts, 24" diameter, into bedrock, as per plan (524E94505) | FT | 630 | $85.00 | $120.00 | $80.00 | $125.00 | $168.99 | $90.00 |
| 46 | Precast reinforced concrete outlet, as per plan (611E99711) | EACH | 1 | $300.00 | $385.00 | $288.00 | $400.00 | $855.06 | $1,710.00 |
| 47 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $8,000.00 | $4,699.59 | $6,200.00 | $28,000 | $5,696.76 | $11,000 |
| 48 | Maintaining traffic (614E11000) | LS | 1 | $40,000 | $45,213 | $39,969 | $36,000 | $47,757 | $66,000 |
| 49 | Field office, type A (619E16000) | MNTH | 3 | $1,800.00 | $5,700.00 | $1,800.00 | $750.00 | $1,290.00 | $3,100.00 |
| 50 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $10,000 | $11,000 | $9,397.00 | $6,000.00 | $8,150.00 | $9,500.00 |
| 51 | Mobilization (624E10000) | LS | 1 | $23,500 | $35,000 | $45,000 | $10,000 | $32,802 | $76,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of September 17, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.