D G M Inc: ODOT bid record

D G M Inc submitted 189 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 43 of them (23%). When it was not low, its total sat a median +14% above the low bid.

Owner
Ohio DOT
Low bid volume
$49,718,300
Latest bid
12 NOV 2026
Data through
12 NOV 2026
189Bids
43Low bids
23Win rate, percent
+14%Median gap to the low bid when not low, 146 bids

By year

YearBidsLow bidsWin rate
202038513%
202130723%
202231619%
2023251040%
202426623%
202520420%
202619526%
D G M Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
SCI21419%
ROS20525%
MEG19842%
JAC17424%
HIG15533%
LAW15320%
GAL1400%
BRO14214%
VIN12325%
ATH12217%
PIK10330%
HOC8225%
D G M Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH189189 (100%)$1.00$1.00
Water659E35000MGAL186175 (94%)$1.00$1.00
Raised pavement marker removed621E54000EACH120116 (97%)$1.00$12.00
Guardrail removed202E38000FT113107 (95%)$1.00$2.50
Lime659E31000ACRE18469 (38%)$100.00$150.00
Tack coat407E10000GAL13565 (48%)$2.50$3.25
Law enforcement officer with patrol car for assistance614E11110HR9461 (65%)$50.00$80.00
Proof rolling204E45000HR6156 (92%)$75.00$219.05
Pavement removed202E23000SY10955 (50%)$10.00$17.00
RPM621E00100EACH11053 (48%)$291.00$52.92
Type 2 waterproofing512E33000SY8653 (62%)$20.00$30.00
Aggregate base304E20000CY17349 (28%)$90.00$90.00
D G M Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

D G M Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
12 NOV 2026260509SCISCI-US 52-13.33 (CULVERT REPLACEMENT)2 of 5$801,588+11%
29 OCT 2026260454ADAADA-SR 247-14.51/15.56 (BRIDGE REPLACEMENT (2 BRIDGES))1 of 5$4,877,413Low, 5.0% under the second
15 OCT 2026260484GALGAL-US 35 Rest Areas TP (PARKING AREAS)3 of 3$4,243,649+7.0%
01 OCT 2026260427LAWLAW-SR 93-11.21 Flooding (MINOR RECONSTRUCTION)2 of 4$2,879,195+5.0%
17 SEP 2026260408JACJAC-SR 327-14.98 (SLIDE REPAIR)4 of 7$815,478+21%
13 AUG 2026260367PIKPIK-SR 32-06.60 (BRIDGE REPAIR)2 of 6$642,292+24%
13 AUG 2026260368PIKPIK-SR 32-18.40 (INTERSECTION)5 of 9$3,219,136+14%
21 MAY 2026260268JACJAC-US 35-18.16 (Safety) (PART 1 AND PART 2) (INTERSECTION)4 of 4$2,780,530+22%
23 APR 2026260213ROSROS-SR 180-02.11 (CULVERT REPLACEMENT)5 of 6$1,401,066+18%
23 APR 2026260223SCISCI-Shawnee SF Bridges (BRIDGE REPAIR)3 of 3$297,480+11%
23 APR 2026260224VINVIN-Tar Hollow Culvert (CULVERT REPLACEMENT)1 of 6$399,890Low, 11% under the second
12 MAR 2026260134SCISCI-SR 125-06.26 (BRIDGE REPLACEMENT (1 BRIDGE))7 of 7$2,217,459+13%
19 FEB 2026260087JACJAC-SR 788-00.87 (BRIDGE REPLACEMENT (1 BRIDGE))1 of 8$984,962Low, 8.0% under the second
19 FEB 2026260088MEGMEG-SR 124-09.20 (MINOR RECONSTRUCTION)3 of 3$698,626+22%
29 JAN 2026260042ATHATH-SR 56-00.90 (MINOR RECONSTRUCTION)5 of 6$1,861,762+7.0%
15 JAN 2026260005JACJAC-SR 327/SR 32-13.58/17.51 (CULVERT REPLACEMENT)1 of 5$536,376Low, 10% under the second
15 JAN 2026260006ATHATH-SR 13-13.71 (SLIDE REPAIR)2 of 7$886,436-10%
15 JAN 2026260018HIGHIG-SR 73-21.04 (BRIDGE REPLACEMENT (1 BRIDGE))1 of 4$2,244,819Low, 0.0% under the second
15 JAN 2026260020LAWLAW-SR 378-04.84 (BRIDGE REPLACEMENT (1 BRIDGE))2 of 4$1,631,449+4.0%
18 DEC 2025250589LAWLAW-SR 243-04.38 (CULVERT REPLACEMENT)2 of 4$327,549+13%
04 DEC 2025250559HOCHOC-SR 664-12.74 (INTERSECTION)5 of 5$2,776,152+36%
04 DEC 2025250571ROSROS-CR 550-17.12 (Safety) (INTERSECTION)6 of 7$599,873+21%
13 NOV 2025250526HIGHIG-SR 73-00.26 (BRIDGE REPLACEMENT (1 BRIDGE))1 of 8$1,743,419Low, 17% under the second
13 NOV 2025250533ROSROS-SR 138-17.28 (BRIDGE REPLACEMENT (1 BRIDGE))7 of 7$3,309,765+35%
13 NOV 2025250544JACJAC-SR 139-06.82 (CULVERT REPLACEMENT)1 of 7$369,372Low, 21% under the second
D G M Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.