D G M Inc: ODOT bid record
D G M Inc submitted 189 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 43 of them (23%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $49,718,300
- Latest bid
- 12 NOV 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 38 | 5 | 13% |
| 2021 | 30 | 7 | 23% |
| 2022 | 31 | 6 | 19% |
| 2023 | 25 | 10 | 40% |
| 2024 | 26 | 6 | 23% |
| 2025 | 20 | 4 | 20% |
| 2026 | 19 | 5 | 26% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| SCI | 21 | 4 | 19% |
| ROS | 20 | 5 | 25% |
| MEG | 19 | 8 | 42% |
| JAC | 17 | 4 | 24% |
| HIG | 15 | 5 | 33% |
| LAW | 15 | 3 | 20% |
| GAL | 14 | 0 | 0% |
| BRO | 14 | 2 | 14% |
| VIN | 12 | 3 | 25% |
| ATH | 12 | 2 | 17% |
| PIK | 10 | 3 | 30% |
| HOC | 8 | 2 | 25% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 189 | 189 (100%) | $1.00 | $1.00 |
| Water | 659E35000 | MGAL | 186 | 175 (94%) | $1.00 | $1.00 |
| Raised pavement marker removed | 621E54000 | EACH | 120 | 116 (97%) | $1.00 | $12.00 |
| Guardrail removed | 202E38000 | FT | 113 | 107 (95%) | $1.00 | $2.50 |
| Lime | 659E31000 | ACRE | 184 | 69 (38%) | $100.00 | $150.00 |
| Tack coat | 407E10000 | GAL | 135 | 65 (48%) | $2.50 | $3.25 |
| Law enforcement officer with patrol car for assistance | 614E11110 | HR | 94 | 61 (65%) | $50.00 | $80.00 |
| Proof rolling | 204E45000 | HR | 61 | 56 (92%) | $75.00 | $219.05 |
| Pavement removed | 202E23000 | SY | 109 | 55 (50%) | $10.00 | $17.00 |
| RPM | 621E00100 | EACH | 110 | 53 (48%) | $291.00 | $52.92 |
| Type 2 waterproofing | 512E33000 | SY | 86 | 53 (62%) | $20.00 | $30.00 |
| Aggregate base | 304E20000 | CY | 173 | 49 (28%) | $90.00 | $90.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Alan Stone Co Inc | 107 | 52 of 107 |
| Axis Civil Construction LLC | 95 | 41 of 95 |
| Shelly & Sands Inc | 90 | 43 of 90 |
| Complete General Construction Company | 84 | 20 of 84 |
| R C Construction Company and Son Inc | 67 | 24 of 67 |
| Allard Excavation LLC | 65 | 39 of 65 |
| George J Igel & Co Inc | 46 | 18 of 46 |
| Sunesis Construction Co | 46 | 11 of 46 |
| Eclipse Co LLC | 35 | 6 of 35 |
| Ohio-West Virginia Excavating Co | 32 | 12 of 32 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | 260509 | SCI | SCI-US 52-13.33 (CULVERT REPLACEMENT) | 2 of 5 | $801,588 | +11% |
| 29 OCT 2026 | 260454 | ADA | ADA-SR 247-14.51/15.56 (BRIDGE REPLACEMENT (2 BRIDGES)) | 1 of 5 | $4,877,413 | Low, 5.0% under the second |
| 15 OCT 2026 | 260484 | GAL | GAL-US 35 Rest Areas TP (PARKING AREAS) | 3 of 3 | $4,243,649 | +7.0% |
| 01 OCT 2026 | 260427 | LAW | LAW-SR 93-11.21 Flooding (MINOR RECONSTRUCTION) | 2 of 4 | $2,879,195 | +5.0% |
| 17 SEP 2026 | 260408 | JAC | JAC-SR 327-14.98 (SLIDE REPAIR) | 4 of 7 | $815,478 | +21% |
| 13 AUG 2026 | 260367 | PIK | PIK-SR 32-06.60 (BRIDGE REPAIR) | 2 of 6 | $642,292 | +24% |
| 13 AUG 2026 | 260368 | PIK | PIK-SR 32-18.40 (INTERSECTION) | 5 of 9 | $3,219,136 | +14% |
| 21 MAY 2026 | 260268 | JAC | JAC-US 35-18.16 (Safety) (PART 1 AND PART 2) (INTERSECTION) | 4 of 4 | $2,780,530 | +22% |
| 23 APR 2026 | 260213 | ROS | ROS-SR 180-02.11 (CULVERT REPLACEMENT) | 5 of 6 | $1,401,066 | +18% |
| 23 APR 2026 | 260223 | SCI | SCI-Shawnee SF Bridges (BRIDGE REPAIR) | 3 of 3 | $297,480 | +11% |
| 23 APR 2026 | 260224 | VIN | VIN-Tar Hollow Culvert (CULVERT REPLACEMENT) | 1 of 6 | $399,890 | Low, 11% under the second |
| 12 MAR 2026 | 260134 | SCI | SCI-SR 125-06.26 (BRIDGE REPLACEMENT (1 BRIDGE)) | 7 of 7 | $2,217,459 | +13% |
| 19 FEB 2026 | 260087 | JAC | JAC-SR 788-00.87 (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 8 | $984,962 | Low, 8.0% under the second |
| 19 FEB 2026 | 260088 | MEG | MEG-SR 124-09.20 (MINOR RECONSTRUCTION) | 3 of 3 | $698,626 | +22% |
| 29 JAN 2026 | 260042 | ATH | ATH-SR 56-00.90 (MINOR RECONSTRUCTION) | 5 of 6 | $1,861,762 | +7.0% |
| 15 JAN 2026 | 260005 | JAC | JAC-SR 327/SR 32-13.58/17.51 (CULVERT REPLACEMENT) | 1 of 5 | $536,376 | Low, 10% under the second |
| 15 JAN 2026 | 260006 | ATH | ATH-SR 13-13.71 (SLIDE REPAIR) | 2 of 7 | $886,436 | -10% |
| 15 JAN 2026 | 260018 | HIG | HIG-SR 73-21.04 (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 4 | $2,244,819 | Low, 0.0% under the second |
| 15 JAN 2026 | 260020 | LAW | LAW-SR 378-04.84 (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 4 | $1,631,449 | +4.0% |
| 18 DEC 2025 | 250589 | LAW | LAW-SR 243-04.38 (CULVERT REPLACEMENT) | 2 of 4 | $327,549 | +13% |
| 04 DEC 2025 | 250559 | HOC | HOC-SR 664-12.74 (INTERSECTION) | 5 of 5 | $2,776,152 | +36% |
| 04 DEC 2025 | 250571 | ROS | ROS-CR 550-17.12 (Safety) (INTERSECTION) | 6 of 7 | $599,873 | +21% |
| 13 NOV 2025 | 250526 | HIG | HIG-SR 73-00.26 (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 8 | $1,743,419 | Low, 17% under the second |
| 13 NOV 2025 | 250533 | ROS | ROS-SR 138-17.28 (BRIDGE REPLACEMENT (1 BRIDGE)) | 7 of 7 | $3,309,765 | +35% |
| 13 NOV 2025 | 250544 | JAC | JAC-SR 139-06.82 (CULVERT REPLACEMENT) | 1 of 7 | $369,372 | Low, 21% under the second |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.