ODOT contract 260042 bid tabulation
ATH-SR 56-00.90 (MINOR RECONSTRUCTION). Let by Ohio DOT on January 29, 2026, ATH. 6 bids received; low bid $1,732,297 by Alan Stone Co Inc, -19% against the engineer's estimate of $2,130,000.
- Owner
- Ohio DOT
- Letting
- 29 JAN 2026
- Pay items
- 63
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Alan Stone Co Inc | $1,732,297 | Low | -19% |
| 2 | Mason Dixon Energy Services LLC | $1,781,877 | +3.0% | -16% |
| 3 | Allard Excavation LLC | $1,798,580 | +4.0% | -16% |
| 4 | Shelly & Sands Inc | $1,830,445 | +6.0% | -14% |
| 5 | D G M Inc | $1,861,762 | +7.0% | -13% |
| 6 | MC Kee Paving & Sealing LLC | $1,985,239 | +15% | -7.0% |
Engineer's estimate: $2,130,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Alan Stone Co Inc | 2. Mason Dixon Energy Services LLC | 3. Allard Excavation LLC | 4. Shelly & Sands Inc | 5. D G M Inc | 6. MC Kee Paving & Sealing LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $37,000 | $19,477 | $52,564 | $38,268 | $55,000 | $65,000 |
| 2 | Pavement removed (202E23000) | SY | 3,427 | $5.50 | $14.00 | $10.00 | $0.90 | $8.00 | $8.00 |
| 3 | Pipe removed, 24" and under (202E35100) | FT | 85 | $20.00 | $16.00 | $7.00 | $26.00 | $25.00 | $12.00 |
| 4 | Catch basin removed (202E58100) | EACH | 1 | $470.00 | $250.00 | $126.00 | $450.00 | $300.00 | $750.00 |
| 5 | Excavation (203E10000) | CY | 36,199 | $21.00 | $27.00 | $23.00 | $25.50 | $23.00 | $23.00 |
| 6 | Embankment (203E20000) | CY | 10,370 | $5.00 | $11.00 | $5.00 | $9.50 | $11.50 | $20.00 |
| 7 | Subgrade compaction (204E10000) | SY | 4,459 | $3.00 | $5.00 | $3.00 | $2.00 | $4.00 | $4.25 |
| 8 | Excavation of subgrade (204E13000) | CY | 625 | $20.00 | $24.00 | $24.00 | $17.00 | $25.00 | $30.00 |
| 9 | Embankment (204E20000) | CY | 625 | $5.00 | $11.00 | $22.00 | $0.25 | $25.00 | $15.00 |
| 10 | Granular material, type B (204E30010) | CY | 253 | $90.00 | $75.00 | $98.00 | $85.00 | $105.00 | $100.00 |
| 11 | Proof rolling (204E45000) | HR | 3 | $1,400.00 | $180.00 | $248.00 | $250.00 | $100.00 | $225.00 |
| 12 | Pre-blast condition survey (208E10000) | LS | 1 | $1,100.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,500.00 | $2,000.00 |
| 13 | Blasting consultant (208E12000) | LS | 1 | $11,000 | $1,000.00 | $6,500.00 | $6,500.00 | $3,500.00 | $4,500.00 |
| 14 | Air blast and noise control (208E13000) | LS | 1 | $4,600.00 | $1,000.00 | $2,000.00 | $800.00 | $1,250.00 | $3,500.00 |
| 15 | Vibration control and monitoring (208E14000) | LS | 1 | $4,600.00 | $1,000.00 | $2,000.00 | $800.00 | $1,250.00 | $3,500.00 |
| 16 | Presplitting (208E15000) | SY | 2,712 | $36.00 | $3.25 | $34.00 | $19.00 | $35.00 | $38.00 |
| 17 | Hydrologist (208E16000) | LS | 1 | $20,000 | $3,000.00 | $2,000.00 | $16,500 | $2,500.00 | $5,000.00 |
| 18 | Reference monument, type A (623E40500) | EACH | 12 | $1,000.00 | $250.00 | $1,025.00 | $550.00 | $1,000.00 | $500.00 |
| 19 | Rock channel protection, type C with geotextile fabric (601E32204) | CY | 6 | $500.00 | $70.00 | $158.00 | $300.00 | $200.00 | $350.00 |
| 20 | Water (616E10000) | MGAL | 100 | $1.00 | $1.00 | $1.00 | $100.00 | $1.00 | $1.00 |
| 21 | Soil analysis test (659E00100) | EACH | 2 | $180.00 | $300.00 | $150.00 | $150.00 | $150.00 | $175.00 |
| 22 | Topsoil (659E00300) | CY | 200 | $35.00 | $30.00 | $37.00 | $15.00 | $25.00 | $65.00 |
| 23 | Seeding and mulching (659E10000) | SY | 10,419 | $1.00 | $0.75 | $1.00 | $0.70 | $1.00 | $1.00 |
| 24 | Seeding and mulching, as per plan (659E10001) | SY | 6,603 | $1.00 | $0.75 | $1.00 | $1.00 | $1.25 | $1.25 |
| 25 | Commercial fertilizer (659E20000) | TON | 1.54 | $1,200.00 | $250.00 | $1,250.00 | $1,250.00 | $1,500.00 | $1,250.00 |
| 26 | Lime (659E31000) | ACRE | 3.52 | $200.00 | $25.00 | $150.00 | $150.00 | $300.00 | $150.00 |
| 27 | Water (659E35000) | MGAL | 92 | $1.50 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 28 | Ditch erosion protection mat, type B (670E00720) | SY | 514 | $2.00 | $1.25 | $2.50 | $2.50 | $3.00 | $3.00 |
| 29 | Storm water pollution prevention plan (832E15000) | LS | 1 | $3,600.00 | $4,000.00 | $2,083.00 | $1,750.00 | $2,200.00 | $1,800.00 |
| 30 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $17,000 | $1,500.00 | $10,891 | $9,150.00 | $10,000 | $9,500.00 |
| 31 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $11,000 | $10,000 | $11,843 | $9,934.00 | $11,000 | $10,750 |
| 32 | Erosion control (832E30000) | EACH | 35,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 33 | Class QC1 concrete, misc.:culvert backfill and bed (511E53010) | CY | 20.50 | $225.00 | $200.00 | $283.00 | $195.00 | $450.00 | $279.00 |
| 34 | Concrete masonry (602E20000) | CY | 1.70 | $2,500.00 | $200.00 | $8,163.00 | $3,500.00 | $2,500.00 | $3,000.00 |
| 35 | 6" rock cut underdrains with geotextile fabric (605E13510) | FT | 400 | $50.00 | $12.00 | $25.00 | $33.00 | $22.00 | $18.00 |
| 36 | 6" base pipe underdrains with geotextile fabric (605E14020) | FT | 1,116 | $20.00 | $8.00 | $19.00 | $20.00 | $15.00 | $16.00 |
| 37 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 118 | $35.00 | $8.00 | $32.00 | $34.00 | $35.00 | $24.00 |
| 38 | 21" conduit, type A (611E08700) | FT | 45 | $160.00 | $45.00 | $91.00 | $172.00 | $130.00 | $165.00 |
| 39 | 24" conduit, type A (611E10200) | FT | 62 | $170.00 | $45.00 | $158.00 | $146.00 | $130.00 | $175.00 |
| 40 | Precast reinforced concrete outlet (611E99710) | EACH | 1 | $300.00 | $1,000.00 | $427.00 | $585.00 | $300.00 | $375.00 |
| 41 | Pavement planing, asphalt concrete, 1.50" (254E01000) | SY | 128 | $40.00 | $10.50 | $19.95 | $22.00 | $12.50 | $10.50 |
| 42 | Pavement planing, asphalt concrete, variable (254E01000) | SY | 470 | $20.00 | $12.00 | $22.50 | $25.00 | $12.50 | $12.00 |
| 43 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 696 | $220.00 | $195.00 | $190.00 | $190.00 | $220.00 | $250.00 |
| 44 | Aggregate base (304E20000) | CY | 720 | $100.00 | $65.00 | $92.00 | $97.00 | $105.00 | $90.00 |
| 45 | Non-tracking tack coat (407E20000) | GAL | 452 | $6.50 | $3.50 | $3.28 | $3.28 | $4.50 | $4.00 |
| 47 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 190 | $300.00 | $255.00 | $250.00 | $250.00 | $250.00 | $250.00 |
| 48 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 232 | $250.00 | $225.00 | $220.00 | $220.00 | $240.00 | $250.00 |
| 49 | RPM (621E00100) | EACH | 38 | $85.00 | $150.00 | $75.00 | $75.00 | $75.00 | $80.00 |
| 50 | Raised pavement marker removed (621E54000) | EACH | 38 | $10.00 | $30.00 | $10.00 | $12.00 | $1.00 | $3.50 |
| 51 | Ground mounted support, no. 3 post (630E03100) | FT | 147 | $25.00 | $40.00 | $22.00 | $20.00 | $25.00 | $25.00 |
| 52 | Sign post reflector (630E08600) | EACH | 12 | $70.00 | $40.00 | $50.00 | $50.00 | $60.00 | $55.00 |
| 53 | Sign, flat sheet (630E80100) | SF | 62 | $30.00 | $45.00 | $36.00 | $22.50 | $40.00 | $40.00 |
| 54 | Sign, double faced, mile marker (630E80600) | EACH | 1 | $250.00 | $200.00 | $500.00 | $185.00 | $100.00 | $525.00 |
| 55 | Removal of ground mounted sign and disposal (630E84900) | EACH | 17 | $20.00 | $50.00 | $75.00 | $15.00 | $25.00 | $80.00 |
| 56 | Removal of ground mounted post support and disposal (630E86002) | EACH | 11 | $25.00 | $50.00 | $125.00 | $20.00 | $25.00 | $130.00 |
| 57 | Edge line, 6", type 1 (642E00104) | MI | 0.56 | $1,800.00 | $4,000.00 | $1,600.00 | $1,600.00 | $1,700.00 | $1,700.00 |
| 58 | Center line, type 1 (642E00300) | MI | 0.28 | $3,000.00 | $5,000.00 | $2,650.00 | $6,250.00 | $2,800.00 | $2,700.00 |
| 59 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $20,000 | $24,500 | $12,909 | $12,500 | $38,000 | $29,500 |
| 60 | Maintaining traffic (614E11000) | LS | 1 | $12,000 | $5,000.00 | $7,225.00 | $6,500.00 | $30,000 | $25,000 |
| 61 | Construction layout stakes and surveying (623E10000) | LS | 1 | $45,000 | $14,000 | $24,743 | $44,500 | $20,000 | $16,500 |
| 62 | Mobilization (624E10000) | LS | 1 | $30,000 | $81,500 | $108,428 | $90,000 | $40,000 | $55,000 |
| 100 | Full depth pavement sawing (252E01500) | FT | 275 | $8.45 | $8.00 | $4.50 | $1.50 | $6.00 | $5.00 |
| 101 | Geotextile fabric (204E50000) | SY | 1,516 | $3.03 | $1.44 | $1.50 | $1.00 | $2.00 | $1.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 29, 2026. Compiled by Mirage Metrics.