ODOT contract 250544 bid tabulation
JAC-SR 139-06.82 (CULVERT REPLACEMENT). Let by Ohio DOT on November 13, 2025, JAC. 7 bids received; low bid $369,372 by D G M Inc, -23% against the engineer's estimate of $480,000.
- Owner
- Ohio DOT
- Letting
- 13 NOV 2025
- Pay items
- 58
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | D G M Inc | $369,372 | Low | -23% |
| 2 | Fillmore Construction | $446,569 | +21% | -7.0% |
| 3 | Alan Stone Co Inc | $457,251 | +24% | -5.0% |
| 4 | Scioto Valley Paving LLC | $464,515 | +26% | -3.0% |
| 5 | Axis Civil Construction LLC | $486,231 | +32% | +1.0% |
| 6 | Sunesis Construction Co | $486,730 | +32% | +1.0% |
| 7 | R C Construction Company and Son Inc | $494,918 | +34% | +3.0% |
Engineer's estimate: $480,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. D G M Inc | 2. Fillmore Construction | 3. Alan Stone Co Inc | 4. Scioto Valley Paving LLC | 5. Axis Civil Construction LLC | 6. Sunesis Construction Co |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $20,000 | $16,000 | $23,000 | $8,500.00 | $28,000 | $21,316 |
| 2 | Pavement removed (202E23000) | SY | 133 | $8.00 | $10.00 | $20.00 | $25.00 | $20.00 | $34.33 |
| 3 | Pipe removed, 24" and under (202E35100) | FT | 115 | $15.00 | $20.00 | $15.00 | $30.00 | $11.00 | $15.89 |
| 4 | Guardrail removed (202E38000) | FT | 137.50 | $1.00 | $10.00 | $7.50 | $15.00 | $10.00 | $2.80 |
| 5 | Anchor assembly removed, type A (202E42000) | EACH | 4 | $200.00 | $500.00 | $510.00 | $500.00 | $250.00 | $193.56 |
| 6 | Mailbox removed (202E53100) | EACH | 3 | $25.00 | $100.00 | $100.00 | $65.00 | $75.00 | $88.49 |
| 7 | Fence removed (202E75000) | FT | 111 | $8.00 | $10.00 | $2.50 | $15.00 | $2.00 | $5.75 |
| 8 | Removal misc.: exiting swingset and dog kennel (202E98000) | LS | 1 | $500.00 | $500.00 | $1,400.00 | $500.00 | $2,500.00 | $1,108.55 |
| 9 | Excavation (203E10000) | CY | 405 | $22.50 | $50.00 | $35.00 | $45.00 | $36.00 | $49.71 |
| 10 | Embankment (203E20000) | CY | 109 | $25.00 | $80.00 | $20.00 | $55.00 | $36.00 | $14.88 |
| 11 | Subgrade compaction (204E10000) | SY | 319 | $8.00 | $10.00 | $8.00 | $5.00 | $3.00 | $4.65 |
| 12 | Fence, type 47 (607E15000) | FT | 111 | $70.00 | $50.00 | $80.00 | $45.00 | $65.00 | $65.00 |
| 13 | Special - mailbox support system, multiple (690E50300) | EACH | 1 | $300.00 | $500.00 | $970.00 | $250.00 | $500.00 | $75.00 |
| 14 | Seeding and mulching (659E10000) | SY | 728 | $4.00 | $3.00 | $4.50 | $4.50 | $4.50 | $5.33 |
| 15 | Repair seeding and mulching (659E14000) | SY | 36 | $0.05 | $3.00 | $10.00 | $3.50 | $4.50 | $4.50 |
| 16 | Commercial fertilizer (659E20000) | TON | 0.10 | $1,500.00 | $2,500.00 | $710.00 | $1,500.00 | $1,250.00 | $1,250.00 |
| 17 | Lime (659E31000) | ACRE | 0.15 | $300.00 | $1,000.00 | $1,000.00 | $1,500.00 | $150.00 | $150.00 |
| 18 | Water (659E35000) | MGAL | 3.90 | $1.00 | $1.00 | $130.00 | $1.00 | $1.00 | $1.00 |
| 19 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 20 | 12" conduit, type D (611E04900) | FT | 70 | $80.00 | $80.00 | $80.00 | $140.00 | $60.00 | $88.67 |
| 21 | Full depth pavement sawing (252E01500) | FT | 45 | $15.00 | $20.00 | $35.00 | $20.00 | $12.00 | $20.00 |
| 22 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 30 | $380.00 | $300.00 | $400.00 | $650.00 | $390.00 | $365.00 |
| 23 | Aggregate base (304E20000) | CY | 32 | $125.00 | $100.00 | $160.00 | $150.00 | $165.00 | $138.81 |
| 24 | Tack coat (407E10000) | GAL | 44 | $4.50 | $10.00 | $4.00 | $1.00 | $7.00 | $4.50 |
| 25 | Stabilized crushed aggregate (411E10000) | CY | 34 | $125.00 | $200.00 | $160.00 | $185.00 | $145.00 | $143.54 |
| 26 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 25 | $445.00 | $500.00 | $450.00 | $650.00 | $460.00 | $430.00 |
| 27 | RPM (621E00100) | EACH | 2 | $545.00 | $600.00 | $690.00 | $250.00 | $545.00 | $1,460.00 |
| 28 | Raised pavement marker removed (621E54000) | EACH | 2 | $1.00 | $20.00 | $120.00 | $30.00 | $50.00 | $88.49 |
| 29 | Edge line, 6", type 1 (642E00104) | MI | 0.06 | $25,000 | $25,404 | $29,000 | $30,000 | $23,095 | $13,000 |
| 30 | Center line, type 1 (642E00300) | MI | 0.03 | $37,500 | $38,110 | $44,000 | $50,000 | $34,645 | $13,000 |
| 31 | Pavement repair (253E02000) | CY | 30 | $325.00 | $300.00 | $450.00 | $150.00 | $200.00 | $460.81 |
| 32 | Tack coat (407E10000) | GAL | 30 | $4.50 | $10.00 | $5.50 | $1.00 | $4.00 | $4.50 |
| 33 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 30 | $275.00 | $500.00 | $460.00 | $650.00 | $290.00 | $410.81 |
| 34 | Detour signing (614E12420) | LS | 1 | $8,250.00 | $8,000.00 | $10,000 | $6,500.00 | $7,990.00 | $9,546.55 |
| 35 | Asphalt concrete for maintaining traffic (614E13000) | CY | 30 | $160.00 | $300.00 | $410.00 | $150.00 | $290.00 | $410.81 |
| 36 | Water (616E10000) | MGAL | 1 | $1.00 | $1.00 | $130.00 | $1.00 | $1.00 | $24.40 |
| 37 | Structure removed (202E11000) | LS | 1 | $15,500 | $10,000 | $13,000 | $10,000 | $18,000 | $14,917 |
| 38 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $500.00 | $10,000 | $22,000 | $10,000 | $14,000 | $12,425 |
| 39 | Unclassified excavation, as per plan (503E21301) | LS | 1 | $3,000.00 | $10,000 | $10,000 | $10,000 | $35,000 | $28,860 |
| 40 | Rock excavation (503E31100) | CY | 56 | $70.00 | $200.00 | $120.00 | $250.00 | $85.00 | $157.15 |
| 41 | Epoxy coated steel reinforcement (509E10000) | LB | 2,400 | $2.25 | $3.00 | $3.50 | $6.00 | $3.00 | $3.11 |
| 42 | Class QC1 concrete, footing (511E46510) | CY | 28 | $650.00 | $1,500.00 | $1,000.00 | $1,200.00 | $690.00 | $1,056.79 |
| 43 | Class QC1 concrete, headwall (511E46610) | CY | 1 | $3,000.00 | $1,500.00 | $7,700.00 | $2,500.00 | $2,800.00 | $4,369.93 |
| 44 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 40 | $45.00 | $50.00 | $70.00 | $55.00 | $55.00 | $54.54 |
| 45 | Type 2 waterproofing (512E33000) | SY | 190 | $18.00 | $24.00 | $25.00 | $50.00 | $28.00 | $37.88 |
| 46 | Rock channel protection, type B with aggregate filter (601E32110) | CY | 31 | $145.00 | $140.00 | $150.00 | $380.00 | $130.00 | $257.18 |
| 47 | 10' X 4' conduit, type A, 706.05 (611E94980) | FT | 72 | $1,582.00 | $1,450.00 | $1,400.00 | $2,000.00 | $1,740.00 | $1,581.06 |
| 48 | Precast gravity and semigravity retaining wall (851E10000) | SF | 193 | $140.00 | $200.00 | $140.00 | $0.10 | $115.00 | $178.95 |
| 49 | Natural soil (851E11000) | CY | 6 | $50.00 | $200.00 | $270.00 | $250.00 | $55.00 | $42.85 |
| 50 | On-site assistance (851E14000) | DAY | 2 | $1,000.00 | $300.00 | $2,800.00 | $1.00 | $500.00 | $366.15 |
| 51 | Wall drainage system (851E15000) | LS | 1 | $2,000.00 | $5,000.00 | $9,500.00 | $2,500.00 | $7,500.00 | $2,718.09 |
| 52 | PGSRW inspection and compaction testing (851E15500) | LS | 1 | $1,000.00 | $5,000.00 | $2,100.00 | $0.01 | $4,000.00 | $2,000.00 |
| 53 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $14,000 | $7,500.00 | $3,500.00 | $9,500.00 | $6,500.00 | $3,504.53 |
| 54 | Maintaining traffic (614E11000) | LS | 1 | $15,000 | $3,500.00 | $2,200.00 | $6,500.00 | $18,000 | $2,918.63 |
| 55 | Construction layout stakes and surveying (623E10000) | LS | 1 | $4,000.00 | $5,000.00 | $9,000.00 | $3,500.00 | $8,600.00 | $5,800.00 |
| 56 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $1,000.00 | $2,500.00 | $1,800.00 | $2,500.00 | $800.00 | $1,400.00 |
| 57 | Post construction survey monument verification and report (623E51000) | LS | 1 | $1,000.00 | $2,500.00 | $1,800.00 | $2,500.00 | $800.00 | $1,400.00 |
| 58 | Mobilization (624E10000) | LS | 1 | $5,000.00 | $17,500 | $22,000 | $20,000 | $36,000 | $36,472 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of November 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.