R C Construction Company and Son Inc: ODOT bid record
R C Construction Company and Son Inc submitted 180 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 13 AUG 2026, and was the low bidder on 15 of them (8%). When it was not low, its total sat a median +36% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $10,353,307
- Latest bid
- 13 AUG 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 54 | 2 | 4% |
| 2021 | 28 | 0 | 0% |
| 2022 | 8 | 1 | 13% |
| 2023 | 17 | 3 | 18% |
| 2024 | 38 | 4 | 11% |
| 2025 | 15 | 1 | 7% |
| 2026 | 20 | 4 | 20% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| BEL | 14 | 0 | 0% |
| MEG | 12 | 0 | 0% |
| ROS | 12 | 2 | 17% |
| NOB | 11 | 0 | 0% |
| WAS | 11 | 3 | 27% |
| JAC | 11 | 0 | 0% |
| GAL | 10 | 1 | 10% |
| LAW | 9 | 3 | 33% |
| BRO | 9 | 0 | 0% |
| MOE | 8 | 1 | 13% |
| ATH | 8 | 0 | 0% |
| VIN | 7 | 1 | 14% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 179 | 179 (100%) | $1.00 | $1.00 |
| Water | 659E35000 | MGAL | 155 | 144 (93%) | $1.00 | $1.00 |
| Subgrade compaction | 204E10000 | SY | 146 | 79 (54%) | $2.00 | $3.00 |
| Repair seeding and mulching | 659E14000 | SY | 80 | 74 (93%) | $0.20 | $1.25 |
| Excavation | 203E10000 | CY | 148 | 46 (31%) | $25.00 | $27.00 |
| Field office, type A | 619E16000 | MNTH | 52 | 44 (85%) | $100.00 | $1,400.00 |
| Embankment | 203E20000 | CY | 153 | 40 (26%) | $25.00 | $25.00 |
| Law enforcement officer with patrol car for assistance | 614E11110 | HR | 47 | 40 (85%) | $25.00 | $80.00 |
| Asphalt concrete for maintaining traffic | 614E13000 | CY | 40 | 38 (95%) | $25.00 | $250.00 |
| Class QC1 concrete, retaining/wingwall not including footing | 511E46010 | CY | 42 | 29 (69%) | $750.00 | $1,470.00 |
| Aggregate drains | 605E31100 | FT | 73 | 28 (38%) | $25.00 | $20.00 |
| Class QC1 concrete, headwall | 511E46610 | CY | 43 | 27 (63%) | $750.00 | $1,897.38 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Alan Stone Co Inc | 99 | 64 of 99 |
| Axis Civil Construction LLC | 93 | 59 of 93 |
| Shelly & Sands Inc | 78 | 59 of 78 |
| D G M Inc | 67 | 43 of 67 |
| Ohio-West Virginia Excavating Co | 67 | 47 of 67 |
| Eclipse Co LLC | 53 | 33 of 53 |
| Parker Corporation | 38 | 30 of 38 |
| Buds Inc | 34 | 25 of 34 |
| Complete General Construction Company | 30 | 14 of 30 |
| Sunesis Construction Co | 22 | 14 of 22 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 13 AUG 2026 | 260361 | GAL | GAL-SR 218-04.81/08.56 (CULVERT REPLACEMENT) | 4 of 4 | $1,004,720 | +12% |
| 21 MAY 2026 | 260275 | WAS | WAS-CR 111-05.41 (RELOCATION) | 1 of 3 | $440,375 | Low, 2.0% under the second |
| 21 MAY 2026 | 264014 | WAS | WAS-SR 60-15.43 (CULVERT REPLACEMENT) | 1 of 4 | $577,219 | Low, 1.0% under the second |
| 07 MAY 2026 | 260241 | JEF | JEF-Reese St Bridge (CULVERT REPLACEMENT) | 1 of 1 | $1,199,361 | Low |
| 07 MAY 2026 | 260244 | MUS | MUS-SR 555-02.09 (SLIDE REPAIR) | 7 of 7 | $386,403 | +74% |
| 07 MAY 2026 | 260247 | ROS | ROS-SR 207-08.31 (CULVERT REPLACEMENT) | 3 of 4 | $433,745 | +26% |
| 23 APR 2026 | 260196 | BEL | BEL-SR 7-00.94 (CULVERT REPLACEMENT) | 4 of 4 | $381,990 | +92% |
| 23 APR 2026 | 260213 | ROS | ROS-SR 180-02.11 (CULVERT REPLACEMENT) | 2 of 6 | $1,242,899 | +5.0% |
| 23 APR 2026 | 260223 | SCI | SCI-Shawnee SF Bridges (BRIDGE REPAIR) | 2 of 3 | $293,575 | +10% |
| 23 APR 2026 | 260224 | VIN | VIN-Tar Hollow Culvert (CULVERT REPLACEMENT) | 5 of 6 | $470,052 | +18% |
| 12 MAR 2026 | 260130 | NOB | NOB-TR 392-00.02 (BRIDGE REPLACEMENT (1 BRIDGE)) | 5 of 5 | $946,900 | +61% |
| 12 MAR 2026 | 260134 | SCI | SCI-SR 125-06.26 (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 7 | $1,979,273 | +1.0% |
| 12 MAR 2026 | 268002 | LAW | LAW-SR 7-13.63 (CULVERT REPLACEMENT) | 4 of 4 | $444,364 | +94% |
| 19 FEB 2026 | 260087 | JAC | JAC-SR 788-00.87 (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 8 | $1,065,164 | +8.0% |
| 29 JAN 2026 | 260060 | MOE | MOE-TR 2214-00.06 (BRIDGE REPLACEMENT (1 BRIDGE)) | 4 of 5 | $1,114,385 | +21% |
| 29 JAN 2026 | 260062 | PER | PER-MR 56-00.13 (Buckeye Street) (BRIDGE REPLACEMENT (1 BRIDGE)) | 6 of 7 | $688,619 | +23% |
| 15 JAN 2026 | 260005 | JAC | JAC-SR 327/SR 32-13.58/17.51 (CULVERT REPLACEMENT) | 2 of 5 | $588,633 | +10% |
| 15 JAN 2026 | 260006 | ATH | ATH-SR 13-13.71 (SLIDE REPAIR) | 4 of 7 | $1,216,645 | +24% |
| 15 JAN 2026 | 260020 | LAW | LAW-SR 378-04.84 (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 4 | $1,568,946 | Low, 4.0% under the second |
| 15 JAN 2026 | 264002 | HOL | HOL-SR 39-00.25 (CULVERT REPLACEMENT) | 7 of 7 | $595,055 | +67% |
| 18 DEC 2025 | 250580 | BEL | BEL-TR 428-00.30 (BRIDGE REPLACEMENT (1 BRIDGE)) | 4 of 4 | $1,207,611 | +37% |
| 18 DEC 2025 | 250589 | LAW | LAW-SR 243-04.38 (CULVERT REPLACEMENT) | 4 of 4 | $424,654 | +47% |
| 18 DEC 2025 | 254034 | MOE | MOE-SR 78-08.35 (SLIDE REPAIR) | 4 of 4 | $685,527 | +61% |
| 13 NOV 2025 | 250532 | NOB | NOB-SR 78-01.08 / NOB-SR 83-00.02 (BRIDGE REPAIR) | 4 of 7 | $1,832,506 | +11% |
| 13 NOV 2025 | 250544 | JAC | JAC-SR 139-06.82 (CULVERT REPLACEMENT) | 7 of 7 | $494,918 | +34% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.