ODOT contract 264002 bid tabulation
HOL-SR 39-00.25 (CULVERT REPLACEMENT). Let by Ohio DOT on January 15, 2026, HOL. 7 bids received; low bid $355,966 by V O Menuez & Son Inc, -27% against the engineer's estimate of $490,000.
- Owner
- Ohio DOT
- Letting
- 15 JAN 2026
- Pay items
- 56
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | V O Menuez & Son Inc | $355,966 | Low | -27% |
| 2 | MC Connell Contracting Inc | $445,087 | +25% | -9.0% |
| 3 | Crawford Construction Company Inc | $459,904 | +29% | -6.0% |
| 4 | BCC Ohio Inc | $460,918 | +29% | -6.0% |
| 5 | Advanced Excavating & Demolition LLC | $530,708 | +49% | +8.0% |
| 6 | Black Horse Bridge Construction Inc | $542,540 | +52% | +11% |
| 7 | R C Construction Company and Son Inc | $595,055 | +67% | +21% |
Engineer's estimate: $490,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. V O Menuez & Son Inc | 2. MC Connell Contracting Inc | 3. Crawford Construction Company Inc | 4. BCC Ohio Inc | 5. Advanced Excavating & Demolition LLC | 6. Black Horse Bridge Construction Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $5,831.00 | $2,500.00 | $2,600.00 | $2,445.84 | $25,000 | $7,530.00 |
| 2 | Pavement removed (202E23000) | SY | 193 | $7.50 | $20.00 | $22.00 | $9.82 | $25.00 | $60.00 |
| 3 | Guardrail removed (202E38000) | FT | 277 | $2.67 | $10.00 | $11.00 | $10.23 | $10.00 | $3.00 |
| 4 | Excavation (203E10000) | CY | 305 | $18.97 | $35.00 | $35.00 | $23.05 | $30.00 | $20.00 |
| 5 | Embankment (203E20000) | CY | 240 | $18.97 | $45.00 | $32.00 | $12.90 | $25.00 | $30.00 |
| 6 | Subgrade compaction (204E10000) | SY | 250 | $3.30 | $3.50 | $4.00 | $4.68 | $2.50 | $5.00 |
| 7 | Proof rolling (204E45000) | HR | 1 | $336.00 | $250.00 | $100.00 | $783.00 | $350.00 | $250.00 |
| 8 | Soil analysis test (659E00100) | EACH | 2 | $165.00 | $100.00 | $125.00 | $63.00 | $150.00 | $400.00 |
| 9 | Topsoil (659E00300) | CY | 105 | $46.00 | $85.00 | $71.00 | $64.80 | $50.00 | $61.00 |
| 10 | Seeding and mulching (659E10000) | SY | 948 | $4.25 | $3.25 | $5.00 | $6.30 | $3.60 | $1.50 |
| 11 | Repair seeding and mulching (659E14000) | SY | 47 | $3.86 | $1.00 | $1.00 | $1.05 | $4.00 | $2.00 |
| 12 | Commercial fertilizer (659E20000) | TON | 0.13 | $1,375.00 | $850.00 | $531.00 | $525.00 | $900.00 | $1,000.00 |
| 13 | Lime (659E31000) | ACRE | 0.20 | $165.00 | $750.00 | $300.00 | $105.00 | $5.00 | $100.00 |
| 14 | Water (659E35000) | MGAL | 5 | $1.00 | $1.00 | $5.00 | $1.05 | $0.75 | $1.00 |
| 15 | Erosion control (832E30000) | EACH | 10,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 16 | 6" shallow pipe underdrains (605E11100) | FT | 137 | $17.40 | $12.00 | $35.00 | $25.49 | $25.00 | $28.00 |
| 17 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 22 | $91.00 | $12.00 | $35.00 | $37.96 | $50.00 | $60.00 |
| 18 | 6" conduit, type B (611E00900) | FT | 60 | $38.80 | $12.00 | $40.00 | $29.99 | $85.00 | $35.00 |
| 19 | Pavement planing, asphalt concrete (T = 3") (254E01000) | SY | 170 | $22.00 | $12.00 | $11.00 | $10.50 | $30.00 | $28.00 |
| 20 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 58 | $374.00 | $375.00 | $438.00 | $367.50 | $400.00 | $368.00 |
| 21 | Aggregate base (304E20000) | CY | 76 | $109.83 | $135.00 | $163.00 | $151.21 | $90.00 | $110.00 |
| 22 | Tack coat (407E10000) | GAL | 67 | $13.20 | $3.00 | $9.00 | $3.15 | $20.00 | $4.00 |
| 23 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 16 | $550.00 | $715.00 | $336.00 | $735.00 | $575.00 | $1,106.00 |
| 24 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 23 | $440.00 | $525.00 | $308.00 | $525.00 | $475.00 | $971.00 |
| 25 | Manhole reconstructed to grade (611E99660) | EACH | 1 | $872.00 | $2,500.00 | $1,300.00 | $9,120.00 | $1,200.00 | $2,800.00 |
| 26 | Ground mounted support, no. 2 post (630E02100) | FT | 19 | $13.20 | $20.00 | $25.00 | $99.75 | $17.50 | $18.00 |
| 27 | Sign, flat sheet (630E80100) | SF | 2 | $55.00 | $125.00 | $50.00 | $141.75 | $125.00 | $125.00 |
| 28 | Removal of pavement marking (642E30000) | FT | 56 | $10.00 | $15.00 | $23.00 | $4.61 | $50.00 | $50.00 |
| 29 | Edge line, 6" (646E10010) | MI | 0.05 | $38,500 | $45,000 | $33,000 | $36,750 | $45,000 | $45,000 |
| 30 | Center line (646E10200) | MI | 0.03 | $49,500 | $85,000 | $40,300 | $47,250 | $85,000 | $85,000 |
| 31 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 40 | $82.50 | $10.00 | $50.00 | $81.90 | $92.00 | $85.00 |
| 32 | Detour signing (614E12420) | LS | 1 | $6,406.00 | $7,500.00 | $6,600.00 | $4,725.00 | $10,000 | $9,000.00 |
| 33 | Asphalt concrete for maintaining traffic (614E13000) | CY | 40 | $400.00 | $85.00 | $300.00 | $498.75 | $350.00 | $250.00 |
| 34 | Water (616E10000) | MGAL | 5 | $1.00 | $1.00 | $4.00 | $6.45 | $1.00 | $1.00 |
| 35 | Structure removed (202E11000) | LS | 1 | $28,128 | $33,000 | $42,000 | $32,370 | $24,000 | $23,000 |
| 36 | Removal misc.: oepa notification of demolition (202E98000) | LS | 1 | $235.00 | $350.00 | $500.00 | $544.50 | $500.00 | $250.00 |
| 37 | Excavation (203E10000) | CY | 154 | $10.15 | $35.00 | $50.00 | $25.80 | $35.00 | $36.00 |
| 38 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $1,000.00 | $7,500.00 | $5,000.00 | $12,429 | $12,000 | $62,000 |
| 39 | Unclassified excavation (503E21100) | CY | 158 | $18.65 | $35.00 | $140.00 | $38.70 | $100.00 | $100.00 |
| 40 | Epoxy coated steel reinforcement (509E10000) | LB | 4,388 | $1.24 | $3.25 | $3.00 | $2.28 | $3.50 | $4.00 |
| 41 | Class QC1 concrete, retaining/wingwall not including footing (511E46010) | CY | 14 | $955.54 | $1,200.00 | $1,360.00 | $1,603.77 | $1,000.00 | $1,750.00 |
| 42 | Class QC1 concrete, footing (511E46510) | CY | 35 | $560.00 | $1,700.00 | $870.00 | $1,292.52 | $500.00 | $750.00 |
| 43 | Class QC1 concrete, headwall (511E46610) | CY | 2 | $1,053.00 | $2,000.00 | $1,900.00 | $1,884.38 | $2,675.00 | $1,400.00 |
| 44 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 56 | $41.08 | $18.00 | $55.00 | $38.94 | $55.00 | $48.00 |
| 45 | Type 2 waterproofing (512E33000) | SY | 75 | $30.00 | $35.00 | $57.00 | $33.13 | $70.00 | $28.00 |
| 46 | Type 3 waterproofing (512E33010) | SY | 97 | $54.75 | $85.00 | $67.00 | $65.78 | $80.00 | $85.00 |
| 47 | 1" preformed expansion joint filler (516E13600) | SF | 30 | $7.00 | $15.00 | $17.00 | $10.45 | $30.00 | $10.00 |
| 48 | Porous backfill with geotextile fabric (518E21200) | CY | 16 | $275.00 | $145.00 | $197.00 | $179.99 | $230.00 | $170.00 |
| 49 | Rock channel protection, type B with aggregate filter (601E32110) | CY | 56 | $127.00 | $120.00 | $189.00 | $151.04 | $200.00 | $150.00 |
| 50 | 12' X 4' conduit, type A, 706.05, as per plan (des (611E95601) | FT | 57 | $1,257.00 | $1,600.00 | $1,340.00 | $1,276.57 | $1,500.00 | $1,600.00 |
| 51 | Low strength mortar backfill (613E41200) | CY | 114 | $200.00 | $105.00 | $166.00 | $196.55 | $175.00 | $190.00 |
| 52 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $4,600.00 | $6,500.00 | $5,000.00 | $5,690.15 | $10,000 | $6,500.00 |
| 53 | Maintaining traffic (614E11000) | LS | 1 | $3,500.00 | $10,000 | $8,600.00 | $2,554.20 | $30,000 | $6,000.00 |
| 54 | Field office, type B (619E16010) | MNTH | 6 | $2,322.00 | $500.00 | $850.00 | $4,625.00 | $1,200.00 | $1,000.00 |
| 55 | Construction layout stakes and surveying (623E10000) | LS | 1 | $3,188.00 | $5,000.00 | $4,700.00 | $4,230.00 | $15,000 | $10,000 |
| 56 | Mobilization (624E10000) | LS | 1 | $10,000 | $15,000 | $30,000 | $16,069 | $50,000 | $30,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 15, 2026. Compiled by Mirage Metrics.