MC Connell Contracting Inc: ODOT bid record
MC Connell Contracting Inc submitted 14 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 15 JAN 2026, and was the low bidder on 4 of them (29%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $1,823,787
- Latest bid
- 15 JAN 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 3 | 1 | 33% |
| 2022 | 3 | 0 | 0% |
| 2023 | 4 | 1 | 25% |
| 2024 | 3 | 2 | 67% |
| 2026 | 1 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| CAR | 3 | 1 | 33% |
| HOL | 3 | 0 | 0% |
| COS | 2 | 1 | 50% |
| PER | 1 | 0 | 0% |
| TUS | 1 | 0 | 0% |
| WAS | 1 | 1 | 100% |
| MOE | 1 | 0 | 0% |
| NOB | 1 | 0 | 0% |
| KNO | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 13 | 13 (100%) | $1.00 | $1.00 |
| Water | 659E35000 | MGAL | 13 | 12 (92%) | $1.00 | $1.00 |
| Sealing of concrete surfaces (epoxy-urethane) | 512E10100 | SY | 9 | 7 (78%) | $18.00 | $34.00 |
| Porous backfill with geotextile fabric | 518E21200 | CY | 10 | 5 (50%) | $112.50 | $125.00 |
| Edge line, 6" | 646E10010 | MI | 9 | 5 (56%) | $18,000 | $10,000 |
| Asphalt concrete for maintaining traffic | 614E13000 | CY | 9 | 4 (44%) | $85.00 | $250.00 |
| RPM | 621E00100 | EACH | 6 | 4 (67%) | $370.00 | $52.92 |
| Low strength mortar backfill | 613E41200 | CY | 5 | 4 (80%) | $105.00 | $175.00 |
| Subgrade compaction | 204E10000 | SY | 12 | 3 (25%) | $2.50 | $3.00 |
| Tack coat | 407E10000 | GAL | 11 | 3 (27%) | $4.00 | $3.25 |
| Unclassified excavation | 503E21100 | CY | 6 | 3 (50%) | $28.00 | $85.00 |
| Asphalt concrete intermediate course, type 2, (449) | 441E70300 | CY | 6 | 3 (50%) | $477.50 | $345.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Buds Inc | 7 | 6 of 7 |
| Alan Stone Co Inc | 6 | 2 of 6 |
| Bog Construction Inc | 5 | 2 of 5 |
| R C Construction Company and Son Inc | 5 | 2 of 5 |
| Shelly & Sands Inc | 5 | 2 of 5 |
| Eclipse Co LLC | 5 | 0 of 5 |
| Black Horse Bridge Construction Inc | 4 | 2 of 4 |
| Complete General Construction Company | 3 | 0 of 3 |
| BCC Ohio Inc | 3 | 1 of 3 |
| Crawford Construction Company Inc | 3 | 0 of 3 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 15 JAN 2026 | 264002 | HOL | HOL-SR 39-00.25 (CULVERT REPLACEMENT) | 2 of 7 | $445,087 | +25% |
| 19 DEC 2024 | 244027 | HOL | HOL-SR 3-00.70 (CULVERT REPLACEMENT) | 2 of 3 | $462,165 | +16% |
| 26 SEP 2024 | 240433 | COS | COS-TR 252-00.00 (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 11 | $552,633 | Low, 20% under the second |
| 25 JAN 2024 | 240077 | KNO | KNO-SR 3-32.25 (BRIDGE REPAIR) | 1 of 6 | $195,291 | Low, 0.0% under the second |
| 30 NOV 2023 | 230587 | NOB | NOB-SR 146-01.95 (CULVERT REPLACEMENT) | 7 of 9 | $412,811 | +23% |
| 11 MAY 2023 | 233003 | MOE | MOE-TR 2001-00.13 (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 4 | $581,300 | +19% |
| 30 MAR 2023 | 230204 | WAS | WAS-SR 530-05.04 (CULVERT REPLACEMENT) | 1 of 5 | $291,974 | Low, 17% under the second |
| 30 MAR 2023 | 234012 | CAR | CAR-SR 43-03.91 (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 3 | $918,218 | +11% |
| 28 APR 2022 | 228003 | HOL | HOL-SR 520-09.83 (CULVERT REPLACEMENT) | 3 of 5 | $426,711 | +5.0% |
| 17 FEB 2022 | 220108 | PER | PER-MR Nuzum 00.04 (BRIDGE REPLACEMENT (1 BRIDGE)) | 4 of 7 | $402,563 | +15% |
| 17 FEB 2022 | 224010 | TUS | TUS-SR 212-10.80 (CULVERT REPLACEMENT) | 4 of 5 | $796,648 | +31% |
| 19 NOV 2020 | 204024 | CAR | CAR-SR 542-12.62 (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 8 | $633,781 | +8.0% |
| 07 MAY 2020 | 200266 | CAR | CAR-SR 542-09.34 (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 6 | $783,889 | Low, 2.0% under the second |
| 23 JAN 2020 | 204000 | COS | COS-SR 93-15.72 (BRIDGE REPLACEMENT (1 BRIDGE)) | 4 of 6 | $806,978 | +6.0% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.