MC Connell Contracting Inc: ODOT bid record

MC Connell Contracting Inc submitted 14 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 15 JAN 2026, and was the low bidder on 4 of them (29%). When it was not low, its total sat a median +16% above the low bid.

Owner
Ohio DOT
Low bid volume
$1,823,787
Latest bid
15 JAN 2026
Data through
12 NOV 2026
14Bids
4Low bids
29Win rate, percent
+16%Median gap to the low bid when not low, 10 bids

By year

YearBidsLow bidsWin rate
20203133%
2022300%
20234125%
20243267%
2026100%
MC Connell Contracting Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
CAR3133%
HOL300%
COS2150%
PER100%
TUS100%
WAS11100%
MOE100%
NOB100%
KNO11100%
MC Connell Contracting Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH1313 (100%)$1.00$1.00
Water659E35000MGAL1312 (92%)$1.00$1.00
Sealing of concrete surfaces (epoxy-urethane)512E10100SY97 (78%)$18.00$34.00
Porous backfill with geotextile fabric518E21200CY105 (50%)$112.50$125.00
Edge line, 6"646E10010MI95 (56%)$18,000$10,000
Asphalt concrete for maintaining traffic614E13000CY94 (44%)$85.00$250.00
RPM621E00100EACH64 (67%)$370.00$52.92
Low strength mortar backfill613E41200CY54 (80%)$105.00$175.00
Subgrade compaction204E10000SY123 (25%)$2.50$3.00
Tack coat407E10000GAL113 (27%)$4.00$3.25
Unclassified excavation503E21100CY63 (50%)$28.00$85.00
Asphalt concrete intermediate course, type 2, (449)441E70300CY63 (50%)$477.50$345.00
MC Connell Contracting Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

MC Connell Contracting Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
15 JAN 2026264002HOLHOL-SR 39-00.25 (CULVERT REPLACEMENT)2 of 7$445,087+25%
19 DEC 2024244027HOLHOL-SR 3-00.70 (CULVERT REPLACEMENT)2 of 3$462,165+16%
26 SEP 2024240433COSCOS-TR 252-00.00 (BRIDGE REPLACEMENT (1 BRIDGE))1 of 11$552,633Low, 20% under the second
25 JAN 2024240077KNOKNO-SR 3-32.25 (BRIDGE REPAIR)1 of 6$195,291Low, 0.0% under the second
30 NOV 2023230587NOBNOB-SR 146-01.95 (CULVERT REPLACEMENT)7 of 9$412,811+23%
11 MAY 2023233003MOEMOE-TR 2001-00.13 (BRIDGE REPLACEMENT (1 BRIDGE))2 of 4$581,300+19%
30 MAR 2023230204WASWAS-SR 530-05.04 (CULVERT REPLACEMENT)1 of 5$291,974Low, 17% under the second
30 MAR 2023234012CARCAR-SR 43-03.91 (BRIDGE REPLACEMENT (1 BRIDGE))3 of 3$918,218+11%
28 APR 2022228003HOLHOL-SR 520-09.83 (CULVERT REPLACEMENT)3 of 5$426,711+5.0%
17 FEB 2022220108PERPER-MR Nuzum 00.04 (BRIDGE REPLACEMENT (1 BRIDGE))4 of 7$402,563+15%
17 FEB 2022224010TUSTUS-SR 212-10.80 (CULVERT REPLACEMENT)4 of 5$796,648+31%
19 NOV 2020204024CARCAR-SR 542-12.62 (BRIDGE REPLACEMENT (1 BRIDGE))3 of 8$633,781+8.0%
07 MAY 2020200266CARCAR-SR 542-09.34 (BRIDGE REPLACEMENT (1 BRIDGE))1 of 6$783,889Low, 2.0% under the second
23 JAN 2020204000COSCOS-SR 93-15.72 (BRIDGE REPLACEMENT (1 BRIDGE))4 of 6$806,978+6.0%
MC Connell Contracting Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy