29 contracts let by Ohio DOT on December 19, 2024, $52,449,416 in low bids, a median of 3 bidders per contract. On the 29 with an engineer's estimate, the low bid came in under it 18 times; median low bid -4.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 29
- Low bids, total
- $52,449,416
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 240548 | CUY-SR 237-06.95 Super (BRIDGE REPAIR) | CUY | 2 | Ruhlin Company | $6,779,821 | $7,289,810 | +8.0% | +26% | ODOT |
| 240578 | GUE-IR 70-09.43 (FOUR LANE RESURFACING) | GUE | 2 | Shelly & Sands Inc | $6,163,631 | $6,428,500 | +4.0% | +12% | ODOT |
| 240585 | HEN-SR 109-06.00/21.30 (MINOR RECONSTRUCTION) | HEN | 3 | Vernon Nagel Inc | $5,137,449 | $5,815,648 | +13% | -8.0% | ODOT |
| 240579 | GUE-/MUS/NOB-SR 146/SR 340/SR 672 VAR (TWO LANE RESURFACING) | GUE | 2 | Shelly & Sands Inc | $4,768,269 | $4,884,250 | +2.0% | +1.0% | ODOT |
| 240584 | HAS-US 22-00.00 (TWO LANE RESURFACING) | HAS | 2 | Shelly & Sands Inc | $4,139,490 | $4,237,411 | +2.0% | +3.0% | ODOT |
| 240594 | D02-PM FY2025 (PAVEMENT MARKING) | District 2 | 3 | The Aero-Mark Company LLC | $3,200,000 | $3,457,115 | +8.0% | -11% | ODOT |
| 240575 | DAR-SR 118/SR 705-01.85/00.00 (TWO LANE RESURFACING) | DAR | 2 | Walls Bros Asphalt Co Inc | $2,390,150 | $2,567,330 | +7.0% | -1.0% | ODOT |
| 240549 | D04-BH FY2025 (West) (BRIDGE REPAIR) | District 4 | 3 | Ohio Concrete Maintenance LLC | $2,125,232 | $2,415,611 | +14% | -13% | ODOT |
| 240519 | D01-OL FY25 (BRIDGE REPAIR) | District 1 | 5 | Ohio Concrete Maintenance LLC | $2,086,900 | $2,177,658 | +4.0% | +12% | ODOT |
| 240593 | D01-PM FY25 (PAVEMENT MARKING) | District 1 | 2 | The Aero-Mark Company LLC | $1,924,000 | $2,097,740 | +9.0% | -11% | ODOT |
| 240570 | BEL-SR 7-02.24 (TWO LANE RESURFACING) | BEL | 3 | Shelly & Sands Inc | $1,646,095 | $1,933,433 | +17% | -5.0% | ODOT |
| 240577 | FRA-US 33-06.15 (at Hayden Run Rd) (MINOR RECONSTRUCTION) | FRA | 6 | Shelly & Sands Inc | $1,558,813 | $1,625,709 | +4.0% | -9.0% | ODOT |
| 240586 | PIK-CR 9-05.29 (BRIDGE REPLACEMENT (1 BRIDGE)) | PIK | 7 | Coopers Excavating LLC | $1,466,057 | $1,505,167 | +3.0% | -15% | ODOT |
| 240580 | HAM-BS FY2025 (BRIDGE REPAIR) | HAM | 1 | Aad Contracting Inc | $1,172,144 | +6.0% | ODOT | ||
| 240588 | TRU-SR 45-23.76 (TWO LANE RESURFACING) | TRU | 5 | Shelly & Sands Inc | $1,146,869 | $1,194,934 | +4.0% | -25% | ODOT |
| 240574 | D07-CHIP-FY25 (B) (CHIP SEAL) | District 7 | 5 | Shelly Company | $1,029,491 | $1,033,380 | 0.0% | -10% | ODOT |
| 240587 | PRE-/BUT Culverts FY25 (CULVERT REPLACEMENT) | PRE | 3 | Stanley Miller Construction Company | $962,391 | $1,064,448 | +11% | +49% | ODOT |
| 240571 | BUT-/PRE CHIP FY2025 (CHIP SEAL) | BUT | 4 | SC Construction & Materials LLC | $878,675 | $955,154 | +9.0% | -14% | ODOT |
| 240583 | HAM-VAR Sharonville Signals (SIGNALIZATION) | HAM | 4 | Capital Electric Line Builders Inc | $831,166 | $836,442 | +1.0% | +2.0% | ODOT |
| 240597 | D09-CS-FY2025 (CRACK SEALING) | District 9 | 3 | Scodeller Construction Inc | $687,808 | $777,226 | +13% | +10% | ODOT |
| 244027 | HOL-SR 3-00.70 (CULVERT REPLACEMENT) | HOL | 3 | R C Construction Company and Son Inc | $398,022 | $462,165 | +16% | -3.0% | ODOT |
| 240596 | D04-RPM FY2025 (RAISED PAVEMENT MARKERS) | District 4 | 2 | A & A Safety Inc | $333,743 | $371,352 | +11% | -2.0% | ODOT |
| 240573 | CUY-Middleburg Hts TLCI FY2023 (MISCELLANEOUS) | CUY | 5 | Geauga Highway Co | $330,801 | $399,324 | +21% | -4.0% | ODOT |
| 240572 | CLE-LMST Crossing Signal (SIGNALIZATION) | CLE | 2 | Bansal Construction Inc | $315,939 | $340,386 | +8.0% | +10% | ODOT |
| 244026 | ASD-SR 511-22.26 (CULVERT REPLACEMENT) | ASD | 4 | BCC Ohio Inc | $263,543 | $283,379 | +8.0% | -22% | ODOT |
| 240592 | CLE-SR 32-06.84 (BRIDGE REPAIR) | CLE | 2 | Evers Steel Construction LLC | $247,208 | $294,752 | +19% | +45% | ODOT |
| 240591 | AUG-SR 274-04.31 (CULVERT REPLACEMENT) | AUG | 6 | Brumbaugh Construction Inc | $173,639 | $254,619 | +47% | -28% | ODOT |
| 240595 | D03-TSG FY2025 (M) (SIGNALIZATION) | District 3 | 5 | Greenwich Electric Inc | $155,423 | $172,127 | +11% | -20% | ODOT |
| 240581 | HAM-IR 75-08.91 Tree Clearing (PRUNING/OR TREE/BRUSH REMOVAL) | HAM | 2 | Complete Clearing Inc | $136,650 | $387,450 | +184% | -19% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way