Walls Bros Asphalt Co Inc: ODOT bid record

Walls Bros Asphalt Co Inc submitted 31 bids on Ohio DOT contracts in the data, from 27 FEB 2020 to 13 AUG 2026, and was the low bidder on 23 of them (74%). When it was not low, its total sat a median +10% above the low bid.

Owner
Ohio DOT
Low bid volume
$34,483,328
Latest bid
13 AUG 2026
Data through
12 NOV 2026
31Bids
23Low bids
74Win rate, percent
+10%Median gap to the low bid when not low, 8 bids

By year

YearBidsLow bidsWin rate
20204375%
20215480%
20222150%
202344100%
20245360%
202566100%
20265240%
Walls Bros Asphalt Co Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
MIA121083%
DAR12975%
MOT6467%
PRE100%
Walls Bros Asphalt Co Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Stop line644E00500FT149 (64%)$8.18$8.29
Work zone stop line, class III, 642 paint614E26610FT127 (58%)$4.22$3.50
Law enforcement officer with patrol car for assistance614E11110HR87 (88%)$75.00$80.00
Edge line, 4"644E00100MI86 (75%)$4,438.50$5,120.00
Aggregate base304E20000CY76 (86%)$112.45$90.00
Non-tracking tack coat407E20000GAL155 (33%)$4.05$3.25
Compacted aggregate617E10100CY105 (50%)$112.50$100.00
Channelizing line, 8"644E00400FT105 (50%)$1.95$1.95
Asphalt concrete surface course, type 1, (448), PG70-22M441E50100CY85 (63%)$211.35$235.00
Joint sealer, as per plan516E31001FT75 (71%)$32.00$25.50
Pavement repair, as per plan253E01001SY65 (83%)$49.81$104.50
Lane arrow644E01300EACH124 (33%)$141.20$110.00
Walls Bros Asphalt Co Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Barrett Paving Materials Inc145 of 14
Shelly Company31 of 3
Henry W Bergman Inc11 of 1
Brumbaugh Construction Inc11 of 1
Walls Bros Asphalt Co Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
13 AUG 2026260360DARDAR-SR SR 49-16.68/18.04 (TWO LANE RESURFACING)1 of 1$995,581Low
30 JUL 2026260356MIAMIA-Exp Farm RSF 00.00 (TWO LANE RESURFACING)1 of 2$587,727Low, 41% under the second
07 MAY 2026260261MIAMIA-SR 571/SR 718-VAR/07.62 (MISCELLANEOUS)2 of 2$1,437,236+3.0%
09 APR 2026260173DARDAR-Tecumseh Trail RSF Ph 1 (BIKEWAYS)2 of 2$156,222+7.0%
19 FEB 2026260091MOTMOT-Westbrook RSF 03.11 (TWO LANE RESURFACING)2 of 2$431,529+46%
13 NOV 2025250520DARDAR-US 36/US 127-10.41/13.16 (FOUR LANE RESURFACING)1 of 1$3,760,171Low
23 OCT 2025250495DARDAR-PAVE-FY26 (TWO LANE RESURFACING)1 of 2$4,258,356Low, 15% under the second
17 JUL 2025250346MOTMOT-Shiloh Springs Rd. RSF (TWO LANE RESURFACING)1 of 2$343,531Low, 44% under the second
26 JUN 2025250322MIAMIA-SR 41-11.70 (TWO LANE RESURFACING)1 of 1$965,818Low
30 JAN 2025250058MIAMIA-SR 55-09.05 (TWO LANE RESURFACING)1 of 1$1,848,562Low
30 JAN 2025250059MIAMIA-SR 571-00.00/07.18/13.26 (TWO LANE RESURFACING)1 of 2$2,957,850Low, 14% under the second
19 DEC 2024240575DARDAR-SR 118/SR 705-01.85/00.00 (TWO LANE RESURFACING)1 of 2$2,390,150Low, 7.0% under the second
22 AUG 2024240405MIAMIA-SR 41-00.00 (TWO LANE RESURFACING)1 of 1$1,582,007Low
13 JUN 2024240323DARDAR-/MOT-SR 722/US 40-12.65/00.00 (TWO LANE RESURFACING)2 of 2$1,635,609+4.0%
18 APR 2024240241MIAMIA-Looney Road Resurfacing (TWO LANE RESURFACING)1 of 2$644,477Low, 0.0% under the second
08 FEB 2024240099MOTMOT-Wolf Creek St. Resurfacing (TWO LANE RESURFACING)2 of 2$413,753+3.0%
22 JUN 2023230368MOTMOT-CS-Salem Bend Resurfacing (TWO LANE RESURFACING)1 of 2$196,259Low, 67% under the second
27 APR 2023238004MOTMOT-Market St. Resurfacing (TWO LANE RESURFACING)1 of 2$195,306Low, 12% under the second
30 MAR 2023230189MIAMIA-East Main St Resurfacing (TWO LANE RESURFACING)1 of 1$979,235Low
09 FEB 2023230099MIAMIA-SR 55-11.03 (TWO LANE RESURFACING)1 of 1$615,935Low
14 JUL 2022220422MIAMIA-US 36-11.52 (FOUR LANE RESURFACING)1 of 2$1,306,654Low, 3.0% under the second
10 MAR 2022220135DARDAR-SR 49-32.03 (TWO LANE RESURFACING)2 of 2$938,900+13%
28 OCT 2021210572DARDAR-SR 721/SR 722-00.00/04.40/10.48 (TWO LANE RESURFACING)1 of 1$1,592,262Low
15 JUL 2021210416MOTMOT-/MIA-SR 48-25.18/00.00 (TWO LANE RESURFACING)1 of 2$607,212Low, 29% under the second
01 JUL 2021210404PREPRE-Hueston Wds SP Resurfacing (PARKING AREAS)2 of 2$1,673,965+81%
Walls Bros Asphalt Co Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy