ODOT letting results, June 22, 2023
15 contracts let by Ohio DOT on June 22, 2023, $19,468,519 in low bids, a median of 3 bidders per contract. On the 15 with an engineer's estimate, the low bid came in under it 11 times; median low bid -7.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 15
- Low bids, total
- $19,468,519
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 230369 | NOB-SR 78-00.00 NOB-SR 821-07.46 (TWO LANE RESURFACING) | NOB | 2 | Shelly & Sands Inc | $4,580,858 | $5,124,500 | +12% | +3.0% | ODOT |
| 230370 | SUM-Hopocan/Norton/Snyder Ave (TWO LANE RESURFACING) | SUM | 3 | Karvo Companies Inc | $2,375,000 | $2,908,427 | +22% | -13% | ODOT |
| 230372 | FRA-/MAD-IR 70/US 42 SP FY24 (SPOT PATCHING / PAVEMENT REPAIR) | FRA | 2 | Shelly & Sands Inc | $2,331,330 | $3,196,177 | +37% | -9.0% | ODOT |
| 230379 | D11-SP FY2024(A) (SPOT PATCHING / PAVEMENT REPAIR) | District 11 | 2 | NLS Paving, Inc | $2,233,454 | $2,809,098 | +26% | +40% | ODOT |
| 230367 | KNO-SR 95-05.19 (Fredericktown) (MINOR RECONSTRUCTION) | KNO | 3 | Smith Paving & Excavating Inc | $1,595,405 | $1,842,582 | +15% | -8.0% | ODOT |
| 230364 | COS-/LIC-SR 79/SR 657-00.00/00.00 (CHIP SEAL) | COS | 4 | Melway Paving Co Inc | $1,453,434 | $1,498,336 | +3.0% | -7.0% | ODOT |
| 230374 | HIG-SR 771-00.00-07.11 (TWO LANE RESURFACING) | HIG | 3 | Fillmore Construction | $1,328,441 | $1,512,162 | +14% | -14% | ODOT |
| 230366 | GEA-SR 88-03.40 (TWO LANE RESURFACING) | GEA | 4 | Shelly & Sands Inc | $1,041,456 | $1,056,439 | +1.0% | -2.0% | ODOT |
| 230375 | LUC-/OTT-SR 65/SR 163 FY2024 Oper (MISCELLANEOUS) | LUC | 1 | Dependable Tree and Maintenance Services LLC | $539,905 | +5.0% | ODOT | ||
| 230377 | STA-/SUM GR FY2024 (Systematic) (GUARDRAIL REBUILDING) | STA | 2 | Lake Erie Construction Company | $523,550 | $729,687 | +39% | -6.0% | ODOT |
| 230371 | D03-CRSEAL FY2024 (CRACK SEALING) | District 3 | 3 | Scodeller Construction Inc | $455,202 | $540,846 | +19% | -4.0% | ODOT |
| 230365 | D10-Signal FY 2024 (SIGNALIZATION) | District 10 | 3 | Perram Electric Inc | $404,447 | $441,350 | +9.0% | -12% | ODOT |
| 230378 | TRU-GR FY2024 (Systematic) (GUARDRAIL REBUILDING) | TRU | 4 | PDK Construction Inc | $334,055 | $339,478 | +2.0% | -22% | ODOT |
| 230368 | MOT-CS-Salem Bend Resurfacing (TWO LANE RESURFACING) | MOT | 2 | Walls Bros Asphalt Co Inc | $196,259 | $328,646 | +67% | +16% | ODOT |
| 230373 | GEA-LaDue Boat Launch Pavement (SPOT PATCHING / PAVEMENT REPAIR) | GEA | 4 | Ronyak Paving Inc | $75,725 | $83,450 | +10% | -25% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out.