ODOT contract 260091 bid tabulation
MOT-Westbrook RSF 03.11 (TWO LANE RESURFACING). Let by Ohio DOT on February 19, 2026, MOT. 2 bids received; low bid $294,670 by Barrett Paving Materials Inc, -28% against the engineer's estimate of $408,000.
- Owner
- Ohio DOT
- Letting
- 19 FEB 2026
- Pay items
- 23
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Barrett Paving Materials Inc | $294,670 | Low | -28% |
| 2 | Walls Bros Asphalt Co Inc | $431,529 | +46% | +6.0% |
Engineer's estimate: $408,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Barrett Paving Materials Inc | 2. Walls Bros Asphalt Co Inc |
|---|---|---|---|---|---|
| 1 | Catch basin adjusted to grade (611E98630) | EACH | 1 | $2,300.00 | $2,650.00 |
| 2 | Manhole adjusted to grade (611E99654) | EACH | 18 | $800.00 | $2,200.00 |
| 3 | Pavement repair (253E01000) | SY | 280 | $145.00 | $252.00 |
| 4 | Pavement planing, asphalt concrete, as per plan, 1 (254E01001) | SY | 14,015 | $1.95 | $2.30 |
| 5 | Patching planed surface (254E01600) | SY | 705 | $5.00 | $10.00 |
| 6 | Non-tracking tack coat (407E20000) | GAL | 1,261 | $2.00 | $6.00 |
| 7 | Asphalt concrete surface course, 9.5 MM, type B (4 (442E22050) | CY | 584 | $240.00 | $330.00 |
| 8 | Valve box adjusted to grade (638E10800) | EACH | 35 | $300.00 | $1,100.00 |
| 9 | Edge line, 4" (644E00100) | MI | 0.06 | $6,020.00 | $6,020.00 |
| 10 | Center line (644E00300) | MI | 0.53 | $8,825.00 | $8,825.00 |
| 11 | Stop line (644E00500) | FT | 69 | $10.00 | $10.00 |
| 12 | Crosswalk line, 12" (644E00620) | FT | 342 | $5.00 | $5.00 |
| 13 | Crosswalk line, 24" (644E00630) | FT | 300 | $9.06 | $9.10 |
| 14 | Work zone center line, class I, 642 paint (614E21100) | MI | 0.53 | $3,600.00 | $3,600.00 |
| 15 | Work zone center line, class III, 642 paint (614E21550) | MI | 0.53 | $3,600.00 | $3,600.00 |
| 16 | Work zone edge line, class I, 4", 642 paint (614E22100) | MI | 0.06 | $2,400.00 | $2,400.00 |
| 17 | Work zone edge line, class III, 4", 642 paint (614E22350) | MI | 0.06 | $2,400.00 | $2,400.00 |
| 18 | Work zone stop line, class I, 642 paint (614E26200) | FT | 69 | $6.35 | $6.35 |
| 19 | Work zone stop line, class III, 642 paint (614E26610) | FT | 69 | $6.35 | $6.35 |
| 20 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $1,197.00 | $1,500.00 |
| 21 | Maintaining traffic (614E11000) | LS | 1 | $18,000 | $12,000 |
| 22 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $2,000.00 | $2,000.00 |
| 23 | Mobilization (624E10000) | LS | 1 | $17,000 | $10,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of February 19, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.