ODOT letting results, February 9, 2023

32 contracts let by Ohio DOT on February 9, 2023, $51,426,574 in low bids, a median of 3 bidders per contract. On the 32 with an engineer's estimate, the low bid came in under it 19 times; median low bid -2.0% against the estimate.

Owner
Ohio DOT
Contracts
32
Low bids, total
$51,426,574
Data through
12 NOV 2026

Contracts let that day

ContractProjectCountyBidsLow bidderLow bidSecond bidGapAgainst estimateSource
230098MAR-SR 529-02.59 (MAJOR RECONSTRUCTION)MAR2Shelly & Sands Inc$5,191,688$5,550,410+7.0%-2.0%ODOT
230076AUG-SR 29/US 33-00.00/03.11 (MICROSURFACING)AUG1Strawser Construction Inc$5,032,669+26%ODOT
230093JAC-US 35-02.74 PV (FOUR LANE RESURFACING)JAC1Shelly & Sands Inc$4,994,611-6.0%ODOT
230102PRE-US 127-19.11 (BRIDGE REPAIR)PRE3Complete General Construction Company$4,985,976$5,413,286+9.0%-10%ODOT
230109D09-PM-FY2023(B) (PAVEMENT MARKING)District 93The Aero-Mark Company LLC$2,770,000$2,806,410+1.0%-2.0%ODOT
230088GAL-SR 7-19.34 (TWO LANE RESURFACING)GAL1Shelly Company$2,717,900+16%ODOT
230078CLA-SR 41/IR 70-00.00/04.70/18.00 (TWO LANE RESURFACING)CLA2Shelly Company$2,536,889$3,171,799+25%-12%ODOT
230080COL-SR 344-00.29 (MINOR RECONSTRUCTION)COL3Parella-Pannunzio Inc$2,269,551$2,510,000+11%+33%ODOT
230106D04-GR FY2023 (WO) (GUARDRAIL REBUILDING)District 43Lake Erie Construction Company$1,865,730$1,904,763+2.0%-10%ODOT
230104WAR-SR 123-28.55 (INTERSECTION)WAR4Double Z Construction Company$1,812,223$1,826,015+1.0%+9.0%ODOT
230107D04-PM R-WR FY2023 (PAVEMENT MARKING)District 44American Roadway Logistics$1,696,526$1,739,600+3.0%-12%ODOT
230101OTT-SR 105-10.55 (BRIDGE REPLACEMENT (1 BRIDGE))OTT3Vernon Nagel Inc$1,691,270$1,725,937+2.0%+19%ODOT
230087FRA-SR 315-11.66 (BRIDGE REPAIR)FRA3Double Z Construction Company$1,665,530$2,073,550+24%-1.0%ODOT
230103SHE-SR 65/SR 219-05.47/00.75 (TWO LANE RESURFACING)SHE2Shelly Company$1,394,873$1,594,300+14%+2.0%ODOT
230077BEL-SR 800-14.97 (BRIDGE REPLACEMENT (1 BRIDGE))BEL4Shelly & Sands Inc$1,369,985$1,381,818+1.0%-6.0%ODOT
230091HOL-US 62-05.66 (TWO LANE RESURFACING)HOL4Melway Paving Co Inc$1,312,478$1,478,766+13%-17%ODOT
230086DAR-SR 571-13.65 (MICROSURFACING)DAR2Strawser Construction Inc$848,591$1,166,590+37%+4.0%ODOT
230084D01-BM FY23 (CULVERT REPLACEMENT)District 12Proshot Concrete Inc$741,394$1,223,875+65%-17%ODOT
230081CUY-SR 175 Multi-Purpose Trail (SIDEWALK)CUY8R M H Concrete & Foundations Inc$694,009$708,489+2.0%-7.0%ODOT
230110WOO-SIGN FY2023 (SIGNING)WOO2Cleveland Barricading Systems LLC$651,814$798,525+23%-21%ODOT
234003VAN-US 224-20.18/20.43/20.94 (CULVERT REPLACEMENT)VAN1Vernon Nagel Inc$650,376-19%ODOT
234001CLI-SR 73-16.54 (CULVERT REPLACEMENT)CLI2Alan Stone Co Inc$645,244$754,908+17%-11%ODOT
230100MOE-CR 29-06.93 (BRIDGE REPLACEMENT (1 BRIDGE))MOE5Buds Inc$617,402$665,215+8.0%-13%ODOT
230099MIA-SR 55-11.03 (TWO LANE RESURFACING)MIA1Walls Bros Asphalt Co Inc$615,935+21%ODOT
230092JAC-SR 327-03.82 (BRIDGE REPAIR)JAC7D G M Inc$591,308$623,118+5.0%-9.0%ODOT
230096LAK-SR 44-06.05/VAR Slope (SLIDE REPAIR)LAK3Ruhlin Company$446,802$520,953+17%+15%ODOT
230074ATB-Main & W 48th St Signal NS (INTERSECTION)ATB1Miller Cable Company$414,500+14%ODOT
230090HAR-SR 67-16.13 (TWO LANE RESURFACING)HAR3Bluffton Paving Inc$393,403$413,995+5.0%+4.0%ODOT
230083CUY-SRTS FY2023 Bay Village (SIDEWALK)CUY5Perram Electric Inc$250,500$268,948+7.0%-1.0%ODOT
234004CUY-SRTS FY2022 Maple Hts (SIDEWALK)CUY1Barbicas Construction Company Inc$235,746+18%ODOT
230105COL-SR 7-02.91 (SLIDE REPAIR)COL3Suburban Maintenance & Construction Inc$197,951$199,363+1.0%0.0%ODOT
230089GUE-SR 265-05.68 (SLIDE REPAIR)GUE9Shelly & Sands Inc$123,699$144,317+17%-17%ODOT
ODOT contracts let on February 9, 2023, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy