Suburban Maintenance & Construction Inc: ODOT bid record
Suburban Maintenance & Construction Inc submitted 69 bids on Ohio DOT contracts in the data, from 27 FEB 2020 to 27 AUG 2026, and was the low bidder on 10 of them (14%). When it was not low, its total sat a median +29% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $6,494,049
- Latest bid
- 27 AUG 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 15 | 2 | 13% |
| 2021 | 37 | 5 | 14% |
| 2022 | 4 | 1 | 25% |
| 2023 | 6 | 2 | 33% |
| 2024 | 2 | 0 | 0% |
| 2025 | 3 | 0 | 0% |
| 2026 | 2 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| CUY | 7 | 2 | 29% |
| BEL | 5 | 0 | 0% |
| COL | 5 | 1 | 20% |
| JEF | 5 | 1 | 20% |
| MOE | 4 | 0 | 0% |
| ERI | 3 | 0 | 0% |
| LAK | 3 | 0 | 0% |
| District 8 | 2 | 0 | 0% |
| TUS | 2 | 0 | 0% |
| District 4 | 2 | 1 | 50% |
| LOR | 2 | 1 | 50% |
| ASD | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 63 | 63 (100%) | $1.00 | $1.00 |
| Sign, flat sheet | 630E80100 | SF | 45 | 40 (89%) | $84.25 | $31.63 |
| Patching concrete structure, as per plan | 519E11101 | SF | 71 | 37 (52%) | $90.00 | $150.00 |
| Water | 659E35000 | MGAL | 37 | 29 (78%) | $1.00 | $1.00 |
| Ground mounted support, no. 2 post | 630E02100 | FT | 59 | 28 (47%) | $14.15 | $15.00 |
| Removal of ground mounted post support and disposal | 630E86002 | EACH | 58 | 28 (48%) | $48.35 | $23.50 |
| Removal of ground mounted sign and disposal | 630E84900 | EACH | 54 | 25 (46%) | $47.75 | $20.00 |
| Commercial fertilizer | 659E20000 | TON | 37 | 17 (46%) | $750.00 | $850.00 |
| Aggregate base | 304E20000 | CY | 35 | 17 (49%) | $70.00 | $90.00 |
| Epoxy coated steel reinforcement | 509E10000 | LB | 33 | 15 (45%) | $1.50 | $1.75 |
| Porous backfill with geotextile fabric | 518E21200 | CY | 27 | 13 (48%) | $75.00 | $125.00 |
| Excavation | 203E10000 | CY | 35 | 12 (34%) | $20.00 | $27.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Shelly & Sands Inc | 30 | 26 of 30 |
| Ohio-West Virginia Excavating Co | 22 | 20 of 22 |
| Alan Stone Co Inc | 21 | 18 of 21 |
| Ruhlin Company | 21 | 14 of 21 |
| Complete General Construction Company | 17 | 10 of 17 |
| Great Lakes Construction Co | 17 | 12 of 17 |
| Dennison Bridge Inc | 13 | 7 of 13 |
| Craig Edward Susany Inc | 10 | 4 of 10 |
| Marucci & Gaffney Excavating Co | 8 | 4 of 8 |
| Kokosing Construction Company Inc | 8 | 3 of 8 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 27 AUG 2026 | 260396 | OTT | OTT-SR 269-01.54 Bridge Repair (BRIDGE REPAIR) | 2 of 3 | $188,716 | +12% |
| 19 FEB 2026 | 260102 | CUY | CUY-York Rd/Bennett Road (MISCELLANEOUS) | 6 of 7 | $149,975 | +29% |
| 04 DEC 2025 | 250549 | COL | COL-US 30-34.73 (BRIDGE REPAIR) | 4 of 4 | $547,623 | +72% |
| 11 SEP 2025 | 250421 | CUY | CUY-US 6-14.56 Tower B (BRIDGE REPAIR) | 2 of 5 | $1,329,288 | +20% |
| 11 SEP 2025 | 258021 | MAR | MAR-SR 231-03.42 (BRIDGE REPAIR) | 2 of 4 | $518,501 | +8.0% |
| 08 AUG 2024 | 240400 | RIC | RIC-US 30-08.79 Bridge Hit (BRIDGE REPAIR) | 2 of 4 | $101,727 | +2.0% |
| 27 JUN 2024 | 240356 | GUE | GUE-1SP-01.07 (BRIDGE REPAIR) | 2 of 6 | $98,383 | +41% |
| 09 NOV 2023 | 230543 | LAK | LAK-IR 90-05.57 Slide (SLIDE REPAIR) | 4 of 7 | $1,322,231 | +21% |
| 13 APR 2023 | 230238 | LIC | LIC-SR 16-29.80 (BRIDGE REPAIR) | 1 of 2 | $473,249 | Low, 16% under the second |
| 30 MAR 2023 | 230187 | JEF | JEF-Alexander Street Bridge (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 3 | $1,272,864 | +10% |
| 23 FEB 2023 | 233001 | ATB | ATB-SR 534-12.06 (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 3 | $1,881,073 | +3.0% |
| 09 FEB 2023 | 230105 | COL | COL-SR 7-02.91 (SLIDE REPAIR) | 1 of 3 | $197,951 | Low, 1.0% under the second |
| 12 JAN 2023 | 230012 | ERI | ERI-SR 4-00.23 (SLIDE REPAIR) | 4 of 5 | $683,726 | +38% |
| 15 DEC 2022 | 220678 | District 12 | D12-BH FY2023 Steel Repair (BRIDGE REPAIR) | 2 of 2 | $2,145,870 | +37% |
| 01 DEC 2022 | 220639 | MED | MED-IR 71-15.29 (BRIDGE REPAIR) | 1 of 3 | $481,138 | Low, 10% under the second |
| 31 MAR 2022 | 220206 | ERI | ERI-SR 113-05.85 GSM (SLIDE REPAIR) | 4 of 6 | $866,750 | +31% |
| 10 MAR 2022 | 223002 | HAS | HAS-SR 151-04.85 (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 6 | $8,482,600 | +24% |
| 16 DEC 2021 | 210661 | JEF | JEF-SR 7-10.37 Ramp B (SLIDE REPAIR) | 5 of 7 | $263,112 | +35% |
| 18 NOV 2021 | 210606 | HAS | HAS-US 22-05.87 (SLIDE REPAIR) | 6 of 8 | $777,304 | +60% |
| 28 OCT 2021 | 210517 | POR | POR-SR 14-12.96 (BRIDGE REPAIR) | 7 of 8 | $3,454,958 | +15% |
| 28 OCT 2021 | 210566 | CLA | CLA-SR 72-08.63 (BRIDGE REPAIR) | 8 of 10 | $1,127,221 | +25% |
| 28 OCT 2021 | 210582 | POR | POR-IR 76-16.58/21.18 (BRIDGE REPAIR) | 5 of 8 | $2,945,827 | +9.0% |
| 30 SEP 2021 | 210511 | HOL | HOL-SR 520-11.80/12.91 (SLIDE REPAIR) | 13 of 14 | $1,612,332 | +30% |
| 30 SEP 2021 | 210521 | CUY | CUY-IR 71-16.40/VAR Repair (BRIDGE REPAIR) | 1 of 3 | $2,691,031 | Low |
| 16 SEP 2021 | 210490 | District 4 | D04-BH FY2022 A (BRIDGE REPAIR) | 4 of 4 | $1,420,609 | +73% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.