Craig Edward Susany Inc: ODOT bid record

Craig Edward Susany Inc submitted 60 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 3 of them (5%). When it was not low, its total sat a median +37% above the low bid.

Owner
Ohio DOT
Low bid volume
$1,176,810
Latest bid
12 NOV 2026
Data through
12 NOV 2026
60Bids
3Low bids
5Win rate, percent
+37%Median gap to the low bid when not low, 56 bids

By year

YearBidsLow bidsWin rate
20209111%
20211000%
20227114%
2023900%
20247114%
20251200%
2026600%
Craig Edward Susany Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
JEF10110%
HAS900%
BEL7114%
COL600%
WAY300%
LAW200%
PIC200%
STA2150%
VIN100%
TUS100%
LOR100%
WAS100%
Craig Edward Susany Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH5959 (100%)$1.00$1.00
Water659E35000MGAL4138 (93%)$1.00$1.00
Raised pavement marker removed621E54000EACH3121 (68%)$10.00$12.00
Soil analysis test659E00100EACH2621 (81%)$22.50$115.50
Guardrail removed202E38000FT3920 (51%)$2.00$2.50
Subgrade compaction204E10000SY4618 (39%)$3.00$3.00
Commercial fertilizer659E20000TON4111 (27%)$800.00$850.00
Lime659E31000ACRE3911 (28%)$175.00$150.00
Barrier reflector, type 2 (bidirectional)626E00110EACH2011 (55%)$10.00$11.00
Removal of ground mounted post support and disposal630E86002EACH1110 (91%)$10.00$23.50
RPM621E00100EACH319 (29%)$390.00$52.92
Topsoil659E00300CY309 (30%)$50.00$45.00
Craig Edward Susany Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Craig Edward Susany Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
12 NOV 2026260502HAMHAM-IR 275-05.25 (SLIDE REPAIR)4 of 4$2,399,110+135%
29 OCT 2026260465HOLHOL-US 62-30.74 (SLIDE REPAIR)4 of 5$686,283+42%
13 AUG 2026260362HASHAS-SR 646-01.94 (SLIDE REPAIR)6 of 6$1,794,877+129%
13 AUG 2026268017ATBATB-US 6-22.78 (CULVERT REPLACEMENT)2 of 3$393,309+15%
25 JUN 2026260313HASHAS-SR 9-10.24 (SLIDE REPAIR)2 of 5$574,981+9.0%
23 APR 2026264010JEFJEF-Wintersville Sidewalk Improv (SIDEWALK)3 of 3$487,966+67%
13 NOV 2025250527JEFJEF-SR 213-18.09 (SLIDE REPAIR)3 of 3$1,216,146+33%
23 OCT 2025250490COLCOL-SR 164-01.66 (CULVERT REPLACEMENT)9 of 9$799,918+67%
09 OCT 2025250471ROSROS-US 35-23.67 (SLIDE REPAIR)7 of 7$1,129,617+91%
11 SEP 2025250415PICPIC-SR 56-20.77 (SLIDE REPAIR)10 of 10$789,838+69%
31 JUL 2025250362MEDMED-IR 271-05.64 (SLIDE REPAIR)4 of 4$824,461+84%
26 JUN 2025258017LAWLAW-SR 217-02.53 (SLIDE REPAIR)4 of 5$519,590+17%
22 MAY 2025254017WAYWAY-US 250-27.50 (Culvert Replacement)2 of 3$298,128+42%
08 MAY 2025250264WAYWAY-SR 241-01.32 (SLIDE REPAIR)4 of 4$505,678+22%
24 APR 2025250232BELBEL-SR 7-10.96 (SLIDE REPAIR)3 of 4$1,374,829+55%
10 APR 2025250200STASTA-Sippo Valley Trail Bridge 11 (CULVERT REPLACEMENT)5 of 5$749,519+127%
27 FEB 2025250115BELBEL-SR 647-03.29 (SLIDE REPAIR)3 of 5$657,954+6.0%
16 JAN 2025250006COLCOL-SR 170-20.03 (CULVERT REPLACEMENT)8 of 10$847,569+41%
31 OCT 2024240486COLCOL-SR 172-10.80 (CULVERT REPLACEMENT)7 of 7$1,249,807+248%
11 JUL 2024244017HASHAS-SR 151-07.61 (CULVERT REPLACEMENT)3 of 4$999,981+2.0%
23 MAY 2024240314ATHATH-SR 690-04.21 (SLIDE REPAIR)5 of 5$1,064,982+67%
09 MAY 2024240271HASHAS-US 22-05.43 (SLIDE REPAIR)5 of 5$626,471+54%
18 APR 2024240238MAHMAH-SR 14-09.18 (SLIDE REPAIR)2 of 4$493,962+4.0%
08 FEB 2024240105STASTA-SR 225-02.65 Slide (SLIDE REPAIR)1 of 6$338,805Low, 14% under the second
25 JAN 2024240063PIKPIK-SR 772-14.10 Slide Repair (SLIDE REPAIR)6 of 7$1,089,271+29%
Craig Edward Susany Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy