ODOT contract 260313 bid tabulation
HAS-SR 9-10.24 (SLIDE REPAIR). Let by Ohio DOT on June 25, 2026, HAS. 5 bids received; low bid $529,237 by Ohio-West Virginia Excavating Co, -6.0% against the engineer's estimate of $563,000.
- Owner
- Ohio DOT
- Letting
- 25 JUN 2026
- Pay items
- 41
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Ohio-West Virginia Excavating Co | $529,237 | Low | -6.0% |
| 2 | Craig Edward Susany Inc | $574,981 | +9.0% | +2.0% |
| 3 | Alan Stone Co Inc | $612,053 | +16% | +9.0% |
| 4 | Dennison Bridge Inc | $618,885 | +17% | +10% |
| 5 | Shelly & Sands Inc | $623,773 | +18% | +11% |
Engineer's estimate: $563,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ohio-West Virginia Excavating Co | 2. Craig Edward Susany Inc | 3. Alan Stone Co Inc | 4. Dennison Bridge Inc | 5. Shelly & Sands Inc |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $2,000.00 | $100.00 | $7,500.00 | $2,500.00 | $5,900.00 |
| 2 | Pavement removed (202E23000) | SY | 470 | $18.00 | $25.00 | $14.00 | $35.00 | $27.00 |
| 3 | Guardrail removed (202E38000) | FT | 350 | $10.00 | $2.00 | $4.00 | $2.00 | $2.20 |
| 4 | Removal misc.: piling and lagging removed (202E98000) | LS | 1 | $2,500.00 | $1,000.00 | $8,000.00 | $2,500.00 | $6,100.00 |
| 5 | Embankment (203E20000) | CY | 153 | $50.00 | $20.00 | $25.00 | $30.00 | $30.00 |
| 6 | Granular embankment, as per plan (203E35001) | CY | 12 | $205.00 | $135.00 | $110.00 | $115.00 | $215.00 |
| 7 | Subgrade compaction (204E10000) | SY | 528 | $5.00 | $4.00 | $4.00 | $4.00 | $7.00 |
| 8 | Guardrail, type MGS half post spacing (606E15150) | FT | 350 | $50.00 | $48.00 | $47.00 | $47.50 | $42.40 |
| 9 | Seeding and mulching, as per plan (659E10001) | SY | 389 | $10.00 | $7.00 | $4.00 | $7.00 | $8.40 |
| 10 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 11 | 6" base pipe underdrains with geotextile fabric (605E14020) | FT | 350 | $19.00 | $25.00 | $35.00 | $30.00 | $22.00 |
| 12 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 12 | $65.00 | $25.00 | $50.00 | $40.00 | $55.00 |
| 13 | Precast reinforced concrete outlet, as per plan (611E99711) | EACH | 1 | $250.00 | $275.00 | $400.00 | $400.00 | $390.00 |
| 14 | Pavement planing, asphalt concrete (3") (254E01000) | SY | 36 | $35.00 | $75.00 | $100.00 | $30.00 | $23.50 |
| 15 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 125 | $245.00 | $400.00 | $320.00 | $360.00 | $350.00 |
| 16 | Aggregate base (304E20000) | CY | 122 | $145.00 | $135.00 | $110.00 | $140.00 | $165.00 |
| 17 | Tack coat (407E10000) | GAL | 84 | $11.00 | $4.00 | $3.00 | $4.00 | $3.50 |
| 18 | Prime coat, as per plan (408E10001) | GAL | 63 | $12.00 | $5.00 | $5.00 | $35.00 | $5.00 |
| 19 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 42 | $335.00 | $550.00 | $470.00 | $650.00 | $500.00 |
| 20 | RPM (621E00100) | EACH | 10 | $275.00 | $250.00 | $280.00 | $375.00 | $250.00 |
| 21 | Raised pavement marker removed (621E54000) | EACH | 10 | $40.00 | $10.00 | $20.00 | $25.00 | $25.00 |
| 22 | Barrier reflector, type 2 (bidirectional) (626E00110) | EACH | 8 | $23.00 | $12.00 | $15.00 | $13.00 | $12.50 |
| 23 | Edge line, 6" (646E10010) | MI | 0.14 | $18,000 | $19,000 | $29,000 | $20,000 | $16,500 |
| 24 | Center line (646E10200) | MI | 0.07 | $30,000 | $19,000 | $50,000 | $20,000 | $28,200 |
| 25 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 2 | $3,200.00 | $2,200.00 | $3,400.00 | $3,000.00 | $3,420.00 |
| 26 | Asphalt concrete for maintaining traffic (614E13000) | CY | 10 | $335.00 | $350.00 | $500.00 | $200.00 | $320.00 |
| 27 | Work zone center line, class I, 642 paint (614E21100) | MI | 0.07 | $8,000.00 | $7,200.00 | $8,500.00 | $8,000.00 | $7,554.00 |
| 28 | Work zone center line, class I, 740.06, type I (614E21200) | MI | 0.07 | $17,000 | $12,000 | $18,000 | $13,000 | $15,550 |
| 29 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 0.14 | $4,200.00 | $7,200.00 | $4,500.00 | $8,000.00 | $4,000.00 |
| 30 | Work zone edge line, class I, 6", 740.06, type I (614E22210) | MI | 0.14 | $11,000 | $10,000 | $12,000 | $10,000 | $10,595 |
| 31 | Pavement for maintaining traffic, class B, as per plan (615E25001) | SY | 142 | $150.00 | $200.00 | $200.00 | $230.00 | $230.00 |
| 32 | Portable barrier, unanchored (622E41100) | FT | 510 | $20.00 | $20.00 | $30.00 | $25.00 | $45.00 |
| 33 | Steel piles, misc.: W16X40 steel beam, furnished (507E00400) | FT | 2,205 | $60.00 | $54.00 | $51.00 | $60.00 | $56.00 |
| 34 | Drilled shafts, 24" diameter, above bedrock, as per plan (524E94503) | FT | 1,346 | $50.00 | $62.00 | $58.00 | $70.00 | $62.00 |
| 35 | Drilled shafts, 24" diameter, into bedrock, as per plan (524E94505) | FT | 630 | $75.00 | $67.00 | $58.00 | $80.00 | $60.00 |
| 36 | Drilled shafts, misc.: plug pile, 30" diameter, UN (524E95000) | FT | 620 | $85.00 | $80.00 | $120.00 | $90.00 | $89.00 |
| 37 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $7,500.00 | $19,000 | $5,000.00 | $7,000.00 | $4,498.19 |
| 38 | Maintaining traffic, as per plan (614E11001) | LS | 1 | $22,000 | $26,000 | $40,925 | $25,000 | $35,500 |
| 39 | Field office, type B (619E16010) | MNTH | 4 | $1,500.00 | $1,900.00 | $1,000.00 | $1,500.00 | $3,900.00 |
| 40 | Construction layout stakes and surveying (623E10000) | LS | 1 | $1,500.00 | $8,000.00 | $10,000 | $2,500.00 | $11,300 |
| 41 | Mobilization (624E10000) | LS | 1 | $15,000 | $20,000 | $40,000 | $25,000 | $30,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of June 25, 2026. Compiled by Mirage Metrics.