Ohio-West Virginia Excavating Co: ODOT bid record

Ohio-West Virginia Excavating Co submitted 285 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 73 of them (26%). When it was not low, its total sat a median +19% above the low bid.

Owner
Ohio DOT
Low bid volume
$47,181,053
Latest bid
12 NOV 2026
Data through
12 NOV 2026
285Bids
73Low bids
26Win rate, percent
+19%Median gap to the low bid when not low, 211 bids

By year

YearBidsLow bidsWin rate
2020611626%
2021491531%
2022611626%
2023431126%
202431826%
202526623%
20261417%
Ohio-West Virginia Excavating Co, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
BEL632743%
MOE24521%
WAS22418%
NOB1816%
JEF18422%
HAS18950%
MRG10110%
MUS8113%
HOL800%
COL7229%
GAL7229%
MEG700%
Ohio-West Virginia Excavating Co, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH281281 (100%)$1.00$1.00
Water659E35000MGAL221125 (57%)$1.00$1.00
Water616E10000MGAL9862 (63%)$10.00$20.00
Asphalt concrete base, PG64-22301E46000CY9758 (60%)$238.00$235.00
Subgrade compaction204E10000SY22953 (23%)$4.00$3.00
Asphalt concrete base, PG64-22, (449)301E56000CY10346 (45%)$305.00$300.00
Drilled shafts, 24" diameter, above bedrock, as per plan524E94503FT5938 (64%)$39.50$55.00
Prime coat, as per plan408E10001GAL6537 (57%)$8.00$5.00
Lime659E31000ACRE22035 (16%)$160.66$150.00
Asphalt concrete surface course, type 1, (448), PG64-22441E50000CY6234 (55%)$275.00$300.00
Asphalt concrete surface course, type 1, (448), as per plan441E50101CY4830 (63%)$342.50$275.00
RPM621E00100EACH13829 (21%)$305.46$52.92
Ohio-West Virginia Excavating Co, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Shelly & Sands Inc21791 of 217
Alan Stone Co Inc18592 of 185
Eclipse Co LLC6825 of 68
R C Construction Company and Son Inc6720 of 67
Complete General Construction Company5223 of 52
Dennison Bridge Inc5016 of 50
Litman Excavating Inc4412 of 44
Craig Edward Susany Inc428 of 42
George J Igel & Co Inc4014 of 40
Buds Inc3325 of 33
Ohio-West Virginia Excavating Co, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
12 NOV 2026260491BELBEL-SR 7-25.27 (SLIDE REPAIR)7 of 8$1,457,256+73%
29 OCT 2026260465HOLHOL-US 62-30.74 (SLIDE REPAIR)5 of 5$687,221+43%
01 OCT 2026260418ADAADA-SR 41-31.36 (SLIDE REPAIR)4 of 5$754,022+34%
01 OCT 2026260419BELBEL-IR 70-19.19 (CULVERT REPLACEMENT)3 of 4$9,250,000+23%
01 OCT 2026268019NOBNOB-SR 821-02.98 (SLIDE REPAIR)3 of 4$2,054,052+13%
17 SEP 2026260408JACJAC-SR 327-14.98 (SLIDE REPAIR)6 of 7$917,074+36%
13 AUG 2026260362HASHAS-SR 646-01.94 (SLIDE REPAIR)3 of 6$824,328+5.0%
25 JUN 2026260313HASHAS-SR 9-10.24 (SLIDE REPAIR)1 of 5$529,237Low, 9.0% under the second
07 MAY 2026260242JEFJEF-SR 7-13.95 (MISCELLANEOUS)3 of 3$8,087,065+38%
07 MAY 2026260244MUSMUS-SR 555-02.09 (SLIDE REPAIR)5 of 7$325,309+46%
23 APR 2026260196BELBEL-SR 7-00.94 (CULVERT REPLACEMENT)2 of 4$219,167+10%
09 APR 2026260185WASWAS-SR 26-03.75 (INTERSECTION)2 of 3$977,288+5.0%
29 JAN 2026260060MOEMOE-TR 2214-00.06 (BRIDGE REPLACEMENT (1 BRIDGE))5 of 5$1,198,233+30%
15 JAN 2026260008BELBEL-SR 149-15.10 (SLIDE REPAIR)4 of 4$626,402+12%
18 DEC 2025250593MOEMOE-TR 1004-02.27 (BRIDGE REPLACEMENT (1 BRIDGE))6 of 6$2,343,324+94%
23 OCT 2025250490COLCOL-SR 164-01.66 (CULVERT REPLACEMENT)8 of 9$718,150+50%
23 OCT 2025250499JEFJEF-SR 7-30.92 (CULVERT REPLACEMENT)5 of 6$2,297,086+57%
14 AUG 2025250379HASHAS-SR 212-00.41 (CULVERT REPLACEMENT)1 of 3$1,472,484Low, 5.0% under the second
14 AUG 2025250383WASWAS-Beverly Sidewalk (SIDEWALK)8 of 8$687,186+111%
31 JUL 2025250358HASHAS-SR 149-01.17 (CULVERT REPLACEMENT)4 of 5$1,047,010+47%
31 JUL 2025250362MEDMED-IR 271-05.64 (SLIDE REPAIR)3 of 4$552,000+23%
17 JUL 2025250339BELBEL-SR 149-02.11 (CULVERT REPLACEMENT)6 of 7$1,692,020+93%
17 JUL 2025250341BELBEL-IR 70-10.08 (CULVERT REPLACEMENT)1 of 4$349,000Low, 7.0% under the second
26 JUN 2025258017LAWLAW-SR 217-02.53 (SLIDE REPAIR)3 of 5$519,284+17%
22 MAY 2025250273COSCOS-SR 93-00.75 (SLIDE REPAIR)3 of 4$2,285,409+18%
Ohio-West Virginia Excavating Co: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy