Ohio-West Virginia Excavating Co: ODOT bid record
Ohio-West Virginia Excavating Co submitted 285 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 73 of them (26%). When it was not low, its total sat a median +19% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $47,181,053
- Latest bid
- 12 NOV 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 61 | 16 | 26% |
| 2021 | 49 | 15 | 31% |
| 2022 | 61 | 16 | 26% |
| 2023 | 43 | 11 | 26% |
| 2024 | 31 | 8 | 26% |
| 2025 | 26 | 6 | 23% |
| 2026 | 14 | 1 | 7% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| BEL | 63 | 27 | 43% |
| MOE | 24 | 5 | 21% |
| WAS | 22 | 4 | 18% |
| NOB | 18 | 1 | 6% |
| JEF | 18 | 4 | 22% |
| HAS | 18 | 9 | 50% |
| MRG | 10 | 1 | 10% |
| MUS | 8 | 1 | 13% |
| HOL | 8 | 0 | 0% |
| COL | 7 | 2 | 29% |
| GAL | 7 | 2 | 29% |
| MEG | 7 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 281 | 281 (100%) | $1.00 | $1.00 |
| Water | 659E35000 | MGAL | 221 | 125 (57%) | $1.00 | $1.00 |
| Water | 616E10000 | MGAL | 98 | 62 (63%) | $10.00 | $20.00 |
| Asphalt concrete base, PG64-22 | 301E46000 | CY | 97 | 58 (60%) | $238.00 | $235.00 |
| Subgrade compaction | 204E10000 | SY | 229 | 53 (23%) | $4.00 | $3.00 |
| Asphalt concrete base, PG64-22, (449) | 301E56000 | CY | 103 | 46 (45%) | $305.00 | $300.00 |
| Drilled shafts, 24" diameter, above bedrock, as per plan | 524E94503 | FT | 59 | 38 (64%) | $39.50 | $55.00 |
| Prime coat, as per plan | 408E10001 | GAL | 65 | 37 (57%) | $8.00 | $5.00 |
| Lime | 659E31000 | ACRE | 220 | 35 (16%) | $160.66 | $150.00 |
| Asphalt concrete surface course, type 1, (448), PG64-22 | 441E50000 | CY | 62 | 34 (55%) | $275.00 | $300.00 |
| Asphalt concrete surface course, type 1, (448), as per plan | 441E50101 | CY | 48 | 30 (63%) | $342.50 | $275.00 |
| RPM | 621E00100 | EACH | 138 | 29 (21%) | $305.46 | $52.92 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Shelly & Sands Inc | 217 | 91 of 217 |
| Alan Stone Co Inc | 185 | 92 of 185 |
| Eclipse Co LLC | 68 | 25 of 68 |
| R C Construction Company and Son Inc | 67 | 20 of 67 |
| Complete General Construction Company | 52 | 23 of 52 |
| Dennison Bridge Inc | 50 | 16 of 50 |
| Litman Excavating Inc | 44 | 12 of 44 |
| Craig Edward Susany Inc | 42 | 8 of 42 |
| George J Igel & Co Inc | 40 | 14 of 40 |
| Buds Inc | 33 | 25 of 33 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | 260491 | BEL | BEL-SR 7-25.27 (SLIDE REPAIR) | 7 of 8 | $1,457,256 | +73% |
| 29 OCT 2026 | 260465 | HOL | HOL-US 62-30.74 (SLIDE REPAIR) | 5 of 5 | $687,221 | +43% |
| 01 OCT 2026 | 260418 | ADA | ADA-SR 41-31.36 (SLIDE REPAIR) | 4 of 5 | $754,022 | +34% |
| 01 OCT 2026 | 260419 | BEL | BEL-IR 70-19.19 (CULVERT REPLACEMENT) | 3 of 4 | $9,250,000 | +23% |
| 01 OCT 2026 | 268019 | NOB | NOB-SR 821-02.98 (SLIDE REPAIR) | 3 of 4 | $2,054,052 | +13% |
| 17 SEP 2026 | 260408 | JAC | JAC-SR 327-14.98 (SLIDE REPAIR) | 6 of 7 | $917,074 | +36% |
| 13 AUG 2026 | 260362 | HAS | HAS-SR 646-01.94 (SLIDE REPAIR) | 3 of 6 | $824,328 | +5.0% |
| 25 JUN 2026 | 260313 | HAS | HAS-SR 9-10.24 (SLIDE REPAIR) | 1 of 5 | $529,237 | Low, 9.0% under the second |
| 07 MAY 2026 | 260242 | JEF | JEF-SR 7-13.95 (MISCELLANEOUS) | 3 of 3 | $8,087,065 | +38% |
| 07 MAY 2026 | 260244 | MUS | MUS-SR 555-02.09 (SLIDE REPAIR) | 5 of 7 | $325,309 | +46% |
| 23 APR 2026 | 260196 | BEL | BEL-SR 7-00.94 (CULVERT REPLACEMENT) | 2 of 4 | $219,167 | +10% |
| 09 APR 2026 | 260185 | WAS | WAS-SR 26-03.75 (INTERSECTION) | 2 of 3 | $977,288 | +5.0% |
| 29 JAN 2026 | 260060 | MOE | MOE-TR 2214-00.06 (BRIDGE REPLACEMENT (1 BRIDGE)) | 5 of 5 | $1,198,233 | +30% |
| 15 JAN 2026 | 260008 | BEL | BEL-SR 149-15.10 (SLIDE REPAIR) | 4 of 4 | $626,402 | +12% |
| 18 DEC 2025 | 250593 | MOE | MOE-TR 1004-02.27 (BRIDGE REPLACEMENT (1 BRIDGE)) | 6 of 6 | $2,343,324 | +94% |
| 23 OCT 2025 | 250490 | COL | COL-SR 164-01.66 (CULVERT REPLACEMENT) | 8 of 9 | $718,150 | +50% |
| 23 OCT 2025 | 250499 | JEF | JEF-SR 7-30.92 (CULVERT REPLACEMENT) | 5 of 6 | $2,297,086 | +57% |
| 14 AUG 2025 | 250379 | HAS | HAS-SR 212-00.41 (CULVERT REPLACEMENT) | 1 of 3 | $1,472,484 | Low, 5.0% under the second |
| 14 AUG 2025 | 250383 | WAS | WAS-Beverly Sidewalk (SIDEWALK) | 8 of 8 | $687,186 | +111% |
| 31 JUL 2025 | 250358 | HAS | HAS-SR 149-01.17 (CULVERT REPLACEMENT) | 4 of 5 | $1,047,010 | +47% |
| 31 JUL 2025 | 250362 | MED | MED-IR 271-05.64 (SLIDE REPAIR) | 3 of 4 | $552,000 | +23% |
| 17 JUL 2025 | 250339 | BEL | BEL-SR 149-02.11 (CULVERT REPLACEMENT) | 6 of 7 | $1,692,020 | +93% |
| 17 JUL 2025 | 250341 | BEL | BEL-IR 70-10.08 (CULVERT REPLACEMENT) | 1 of 4 | $349,000 | Low, 7.0% under the second |
| 26 JUN 2025 | 258017 | LAW | LAW-SR 217-02.53 (SLIDE REPAIR) | 3 of 5 | $519,284 | +17% |
| 22 MAY 2025 | 250273 | COS | COS-SR 93-00.75 (SLIDE REPAIR) | 3 of 4 | $2,285,409 | +18% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.