ODOT contract 260242 bid tabulation
JEF-SR 7-13.95 (MISCELLANEOUS). Let by Ohio DOT on May 7, 2026, JEF. 3 bids received; low bid $5,873,591 by Marucci & Gaffney Excavating Co, +50% against the engineer's estimate of $3,923,000.
- Owner
- Ohio DOT
- Letting
- 07 MAY 2026
- Pay items
- 75
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Marucci & Gaffney Excavating Co | $5,873,591 | Low | +50% |
| 2 | S E T Inc | $7,827,875 | +33% | +100% |
| 3 | Ohio-West Virginia Excavating Co | $8,087,065 | +38% | +106% |
Engineer's estimate: $3,923,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Marucci & Gaffney Excavating Co | 2. S E T Inc | 3. Ohio-West Virginia Excavating Co |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $255,000 | $100,000 | $100,000 |
| 2 | Pavement removed (202E23000) | SY | 687 | $14.40 | $22.00 | $32.00 |
| 3 | Pipe removed, 24" and under (202E35100) | FT | 32 | $10.00 | $16.00 | $100.00 |
| 4 | Pipe removed, over 24" diameter (202E35200) | FT | 16 | $10.00 | $32.00 | $275.00 |
| 5 | Guardrail removed (202E38000) | FT | 313 | $10.00 | $13.00 | $15.00 |
| 6 | Manhole removed (202E58000) | EACH | 1 | $100.00 | $600.00 | $3,000.00 |
| 7 | Special - fill and plug existing conduit (202E70000) | FT | 58 | $80.00 | $110.00 | $450.00 |
| 8 | Excavation (203E10000) | CY | 79 | $60.00 | $60.00 | $60.00 |
| 9 | Embankment (203E20000) | CY | 406 | $40.00 | $20.00 | $110.00 |
| 10 | Granular embankment, as per plan (203E35001) | CY | 55 | $175.00 | $150.00 | $260.00 |
| 11 | Subgrade compaction (204E10000) | SY | 779 | $5.00 | $6.00 | $7.00 |
| 12 | Guardrail, type MGS with long posts (606E15100) | FT | 312.50 | $35.00 | $36.00 | $50.00 |
| 13 | Fence, misc.: temporary orange construction fence (607E98000) | FT | 150 | $15.00 | $175.00 | $5.00 |
| 14 | Rock channel protection, type B without filter (601E34100) | CY | 324 | $131.00 | $180.00 | $145.00 |
| 15 | Rock channel protection, type C without filter (601E34200) | CY | 55 | $131.00 | $180.00 | $140.00 |
| 16 | Soil analysis test (659E00100) | EACH | 2 | $10.00 | $150.00 | $250.00 |
| 17 | Topsoil (659E00300) | CY | 42 | $50.00 | $125.00 | $175.00 |
| 18 | Seeding and mulching, class 3B (659E00530) | SY | 376 | $10.00 | $10.00 | $12.00 |
| 19 | Repair seeding and mulching (659E14000) | SY | 19 | $0.27 | $5.00 | $12.00 |
| 20 | Commercial fertilizer (659E20000) | TON | 0.05 | $750.00 | $2,000.00 | $2,500.00 |
| 21 | Lime (659E31000) | ACRE | 0.08 | $40.00 | $450.00 | $500.00 |
| 22 | Water (659E35000) | MGAL | 5 | $0.01 | $12.00 | $2.00 |
| 23 | Erosion control (832E30000) | EACH | 15,000 | $1.00 | $1.00 | $1.00 |
| 24 | Masonry, misc.: chamber cover slab (602E98200) | CY | 18 | $450.00 | $1,000.00 | $1,200.00 |
| 25 | 12" conduit, type B (611E04400) | FT | 64 | $125.00 | $225.00 | $290.00 |
| 26 | 36" conduit, type B (611E16400) | FT | 8 | $675.00 | $1,200.00 | $1,900.00 |
| 27 | 36" conduit, type C (611E16600) | FT | 58 | $250.00 | $230.00 | $1,200.00 |
| 28 | 36" conduit, type C (611E16600) | FT | 12 | $600.00 | $700.00 | $1,200.00 |
| 29 | Conduit, bored or jacked, as per plan, 36" type A, (611E96601) | FT | 198 | $6,600.00 | $8,000.00 | $7,900.00 |
| 30 | Manhole, no. 3 (611E99574) | EACH | 4 | $15,102 | $23,000 | $50,000 |
| 31 | Pavement planing, asphalt concrete, 4" (254E01000) | SY | 116 | $31.00 | $32.00 | $45.00 |
| 32 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 159 | $475.00 | $500.00 | $380.00 |
| 33 | Aggregate base (304E20000) | CY | 150 | $145.00 | $150.00 | $225.00 |
| 34 | Tack coat (407E10000) | GAL | 129 | $3.00 | $4.00 | $12.00 |
| 35 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 28 | $661.00 | $675.00 | $600.00 |
| 36 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 41 | $402.00 | $415.00 | $500.00 |
| 37 | Barrier reflector, type 2, (one-way) (626E00110) | EACH | 4 | $20.00 | $30.00 | $25.00 |
| 38 | Edge line, 6" (646E10010) | MI | 0.10 | $55,000 | $13,000 | $7,500.00 |
| 39 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 80 | $40.00 | $110.00 | $150.00 |
| 40 | Detour signing (614E12420) | LS | 1 | $10,000 | $6,000.00 | $6,000.00 |
| 41 | Portable changeable message sign, as per plan (614E18601) | SNMT | 14 | $1,900.00 | $2,100.00 | $2,500.00 |
| 42 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 0.10 | $10,250 | $13,000 | $85,000 |
| 43 | Water (616E10000) | MGAL | 10 | $0.01 | $650.00 | $20.00 |
| 44 | Railroad flagging services (900E00100) | EACH | 120,000 | $1.00 | $1.00 | $1.00 |
| 45 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $150,000 | $120,000 | $45,000 |
| 46 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $20,000 | $1,050,000 | $250,000 |
| 47 | Porous backfill with geotextile fabric (518E21200) | CY | 18 | $200.00 | $300.00 | $450.00 |
| 48 | 6" perforated corrugated plastic pipe (518E40000) | FT | 15 | $50.00 | $80.00 | $15.00 |
| 49 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 10 | $50.00 | $110.00 | $15.00 |
| 50 | Low strength mortar backfill (613E41200) | CY | 34 | $350.00 | $275.00 | $400.00 |
| 51 | Unclassified excavation, as per plan (503E21101) | CY | 669 | $175.00 | $200.00 | $510.00 |
| 52 | Steel piles, misc.: 2-W16X67, furnished (507E00400) | FT | 190 | $679.86 | $415.00 | $600.00 |
| 53 | Steel piles, misc.: 2-W18X76, furnished (507E00400) | FT | 990 | $677.08 | $440.00 | $700.00 |
| 54 | Steel piles, misc.: 2-W21X93, furnished (507E00400) | FT | 35 | $758.48 | $465.00 | $600.00 |
| 55 | Drilled shafts, 36" diameter, above bedrock, as per plan (524E94703) | FT | 319 | $125.00 | $1,300.00 | $500.00 |
| 56 | Drilled shafts, 36" diameter, into bedrock, as per plan (524E94705) | FT | 217 | $427.41 | $1,575.00 | $850.00 |
| 57 | Special - retaining wall cast in place lagging (530E50010) | SF | 731 | $220.00 | $315.00 | $175.00 |
| 58 | Special - retaining wall, structural survey and MO (530E50030) | LS | 1 | $7,500.00 | $32,000 | $135,000 |
| 59 | Special - retaining wall, precast concrete lagging (530E51010) | SF | 2,856 | $70.00 | $115.00 | $75.00 |
| 60 | Special - retaining wall, timber lagging (530E51020) | SF | 468 | $39.00 | $70.00 | $250.00 |
| 61 | Ground anchor, as per plan see anchor schedule (866E00101) | EACH | 29 | $35,000 | $27,500 | $50,000 |
| 62 | Performance test (866E00400) | EACH | 3 | $6,000.00 | $7,500.00 | $15,000 |
| 63 | Extended creep test (866E00500) | EACH | 1 | $2,500.00 | $19,000 | $30,000 |
| 64 | Steel piles, misc.: 2-W16X67, furnished (507E00400) | FT | 110 | $698.60 | $465.00 | $750.00 |
| 65 | Steel piles, misc.: W21X93, furnished (507E00400) | FT | 550 | $473.78 | $145.00 | $250.00 |
| 66 | Drilled shafts, 30" diameter, above bedrock, as per plan (524E94603) | FT | 405 | $85.00 | $710.00 | $550.00 |
| 67 | Drilled shafts, 30" diameter into bedrock, as per plan (524E94605) | FT | 175 | $320.00 | $775.00 | $700.00 |
| 68 | Special - retaining wall, walers (530E50030) | LS | 1 | $106,043 | $130,000 | $135,000 |
| 69 | Special - retaining wall, timber lagging (530E51020) | SF | 2,333 | $14.00 | $130.00 | $175.00 |
| 70 | Premium on railroads' protective public liability and property damage liability insurance (100E00300) | LS | 1 | $75,000 | $25,000 | $25,000 |
| 71 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $75,000 | $65,000 | $100,000 |
| 72 | Maintaining traffic (614E11000) | LS | 1 | $25,000 | $90,000 | $30,000 |
| 73 | Field office, type B (619E16010) | MNTH | 12 | $2,000.00 | $2,200.00 | $3,500.00 |
| 74 | Construction layout stakes and surveying (623E10000) | LS | 1 | $69,000 | $25,000 | $26,500 |
| 75 | Mobilization (624E10000) | LS | 1 | $250,000 | $200,000 | $250,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 7, 2026. Compiled by Mirage Metrics.